Govindam

Lapsed

Nagpur (M Corp.), Nagpur 440010 |Promoter: Sukhyog Constructions Private Limited

Residential / Group HousingRERAP50500010618
31 Aug 2017Registered with MahaRERA
30 Apr 2018Promised completion
30 Apr 2019Revised completionPushed back 1 year
1Building
14Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Unit types
3 BHK14 units in all
Land area for this project
530 sq m (5,706 sq ft)
Permissible built-up area
1,095 sq m (11,786 sq ft)
Sanctioned built-up area
979 sq m (10,533 sq ft)
Address
97-APIN 440010
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.13725, 79.05886
Govindam is at latitude 21.13725, longitude 79.05886.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 7 years and 6 months ago.

Registered
31 Aug 2017
Promised
30 Apr 2018
Revised
30 Apr 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001061831 Aug 201730 Apr 201830 Apr 2019Sukhyog Constructions Private LimitedProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Govindam814

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

14 units registered

3 BHK · 14 units
TypeCarpet areaUnits
3 BHK1,495.2 sq m · 16,094 sq ft14

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000023

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Govindam

  • Excavation100%
  • Basement (if any)1%
  • Podiums (if any)0%
  • Plinth1%
  • Stilt Floor0%
  • Slabs of Super Structure90%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyUNDER PROCESS50%
  • Sewerage (Chamber, Lines, Septic Tank , STP)UNDER PROCESS0%
  • Storm Water DrainsUNDER PROCESS0%
  • Landscaping & Tree PlantingUNDER PROCESS0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingUNDER PROCESS0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsUNDER PROCESS0%
  • Electrical meter room, sub-station, receiving stationUNDER PROCESS0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingUNDER PROCESS50%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

9 documents held by Deedo, 44 filings listed on MahaRERA's project page

Commencement certificates

Form bs

Registration certificate

Extension certificate

Other

Layout plan

Building plan

Document library

  • Details of encumbrancesRERA EN-CUM CERTIFICATE.pdf · uploaded 4 Aug 2017Source
  • Copy of the legal title reportadv search report.pdf · uploaded 4 Aug 2017Source
  • Copy of the legal title reportadv search report 1.pdf · uploaded 4 Aug 2017Source
  • Copy of the legal title reportadv search report 2.pdf · uploaded 4 Aug 2017Source
  • Copy of the legal title reportadv search report 3.pdf · uploaded 4 Aug 2017Source
  • Copy of the legal title reportadv search report 4.pdf · uploaded 4 Aug 2017Source
  • Proforma of Allotment letterallotment letter rera.pdf · uploaded 4 Aug 2017Source
  • Building Plan Approval (IOD)map rera.pdf · uploaded 4 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect cer 2.pdf · uploaded 4 Aug 2017Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect cer 1.pdf · uploaded 4 Aug 2017Source
  • Certificates of CA (Form 5)ca certi rera 5.pdf · uploaded 4 Aug 2017Source
  • Commencement Certificates / NA Order for plotted developmentbuilding permit rera.pdf · uploaded 4 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentbuilding permit rera 1.pdf · uploaded 4 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)undertaking.pdf · uploaded 4 Aug 2017Source
  • Declaration in FORM Bdeclaration cum affidavit.pdf · uploaded 4 Aug 2017View
  • Declaration in FORM Bdeclaration cum affidavit 1.pdf · uploaded 4 Aug 2017View
  • Declaration in FORM Bdeclaration cum affidavit 2.pdf · uploaded 4 Aug 2017Source
  • Copy of Layout Approval (in case of layout)undertaking rera 1.pdf · uploaded 4 Aug 2017View
  • Certificates of CA (Form 5)FORM 5.pdf · uploaded 3 Oct 2018Source
  • Certificates of CA (Form 5)FORM 5.pdf · uploaded 3 Oct 2018Source
  • Certificates of CA (Form 5)FORM 5.pdf · uploaded 3 Oct 2018Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentGOVINDAM OCCUPANCY CERTI 1 PDF FILE 1.pdf · uploaded 7 Feb 2020Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentGOVINDAM OCCUPANCY CERTI PDF FILE.pdf · uploaded 7 Feb 2020Source
  • Othernmc town planning pdf.pdf · uploaded 4 Aug 2021Source
  • Othernmc town planning pdf.pdf · uploaded 4 Aug 2021Source
  • Otherlicense govindam pdf.pdf · uploaded 4 Aug 2021Source
  • Otherform no 4 2018 pdf.pdf · uploaded 4 Aug 2021Source
  • Otherform no 4 2019 pdf.pdf · uploaded 4 Aug 2021Source

Promoter documents

  • Legal Title reportadv search report.pdf · uploaded 4 Aug 2017Source
  • Legal Title reportadv search report 1.pdf · uploaded 4 Aug 2017Source
  • Legal Title reportadv search report 2.pdf · uploaded 4 Aug 2017Source
  • Legal Title reportadv search report 3.pdf · uploaded 4 Aug 2017Source
  • Legal Title reportadv search report 4.pdf · uploaded 4 Aug 2017Source
  • Declaration Form Bdeclaration cum affidavit.pdf · uploaded 4 Aug 2017View
  • Declaration Form Bdeclaration cum affidavit 1.pdf · uploaded 4 Aug 2017View
  • Declaration Form Bdeclaration cum affidavit 2.pdf · uploaded 4 Aug 2017Source

Technical documents

  • Building Plan Approvalmap rera.pdfView
  • Layout Approvalundertaking rera 1.pdfView

Other legal documents

  • Othernmc town planning pdf.pdfSource
  • Othernmc town planning pdf.pdfSource
  • Otherlicense govindam pdf.pdfSource
  • Otherform no 4 2018 pdf.pdfSource
  • Otherform no 4 2019 pdf.pdfSource

Proforma allotment letter

  • Proforma allotment letterallotment letter rera.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

97A

As published on MahaRERA's project page

97-A

Boundaries

North
Plot No 98
South
Plot No 97
East
Road
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAdish Joshi—

Source: MahaRERA project page. Contact details are not shown.