Gokulpark Tower No 1
ActiveNagpur (M Corp.), Nagpur 440015 |Promoter: Harihar Infrastructure Development Corporation Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Active
- Buildings
- 2
- Land area for this project
- 1,275 sq m (13,722 sq ft)
- Permissible built-up area
- 3,246 sq m (34,940 sq ft)
- Sanctioned built-up area
- 3,246 sq m (34,940 sq ft)
- Planning authority
- Nagpur Improvement Trust
- Address
- 83/1/1, Besa Road, Manish NagarPIN 440015
- Designated bank account
- Idbi Bank
- Litigation declared by promoter
- None declared
- Financial encumbrance declared
- None declared
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 15 years
- Registered
- 14 Aug 2017
- Promised
- 31 Dec 2018
- Revised
- 31 Dec 2033
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P50500006428 | 14 Aug 2017 | 31 Dec 2018 | 31 Dec 2033 | Harihar Infrastructure Development Corporation Limited | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building (P50500006428) | — | — |
| Gokulpark Tower No 1 | 9 | — |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 units registered
Parking
| Type | Two-wheeler | Four-wheeler | Bus | Visitor | Total |
|---|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Open Space | 0 | 0 | 0 | 0 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Construction progress
Work completed, as the promoter reported it to MahaRERA (Form 1)
Gokulpark Tower No 1
Show all 11 activitiesShow fewer activities
Common areas and amenities
Show all 15 activitiesShow fewer activities
Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.
Documents
121 documents held by Deedo, 207 filings listed on MahaRERA's project page
Show all 328 documentsShow fewer documents
Form 2 (31)
- Form 26 Aug 2025ViewSource
- Form 26 Aug 2025ViewSource
- Form 26 Aug 2025ViewSource
- Form 26 Aug 2025ViewSource
- Form 26 Aug 2025ViewSource
- Form 26 Aug 2025ViewSource
- Form 26 Aug 2025ViewSource
- Form 26 Aug 2025ViewSource
- Form 26 Aug 2025ViewSource
- Form 26 Aug 2025ViewSource
- Form 26 Aug 2025ViewSource
- Form 26 Aug 2025ViewSource
- Form 26 Aug 2025ViewSource
- Form 215 Oct 2025ViewSource
- Form 215 Oct 2025ViewSource
- Form 215 Oct 2025ViewSource
- Form 215 Oct 2025ViewSource
- Form 226 Nov 2025ViewSource
- Form 227 Nov 2025ViewSource
- Form 212 Jan 2026ViewSource
- Form 214 Jan 2026ViewSource
- Form 214 Apr 2026ViewSource
- Form 215 Jul 2026ViewSource
Encumbrance details (2)
Form 1 (27)
- Form 129 Jul 2017ViewSource
- Form 14 Nov 2023ViewSource
- Form 17 May 2024ViewSource
- Form 15 Feb 2025ViewSource
- Form 112 Apr 2025ViewSource
- Form 16 Aug 2025ViewSource
- Form 16 Aug 2025ViewSource
- Form 16 Aug 2025ViewSource
- Form 16 Aug 2025ViewSource
- Form 16 Aug 2025ViewSource
- Form 16 Aug 2025ViewSource
- Form 16 Aug 2025ViewSource
- Form 16 Aug 2025ViewSource
- Form 16 Aug 2025ViewSource
- Form 16 Aug 2025ViewSource
- Form 16 Aug 2025ViewSource
- Form 16 Aug 2025ViewSource
- Form 115 Oct 2025ViewSource
- Form 115 Oct 2025ViewSource
- Form 115 Oct 2025ViewSource
- Form 115 Oct 2025ViewSource
- Form 126 Nov 2025ViewSource
- Form 127 Nov 2025ViewSource
- Form 112 Jan 2026ViewSource
- Form 114 Jan 2026ViewSource
- Form 114 Apr 2026ViewSource
- Form 115 Jul 2026ViewSource
Form 5 (12)
- Form 515 Oct 2018ViewSource
- Form 521 Jun 2022ViewSource
- Form 515 Dec 2022ViewSource
- Form 59 Oct 2024ViewSource
- Form 528 May 2026ViewSource
- Form 528 May 2026ViewSource
- Form 528 May 2026ViewSource
- Form 528 May 2026ViewSource
- Form 528 May 2026ViewSource
- Form 530 May 2026ViewSource
- Form 530 May 2026ViewSource
- Form 530 Sep 2026ViewSource
Other (39)
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other6 Aug 2025ViewSource
- Other15 Oct 2025ViewSource
- Other15 Oct 2025ViewSource
- Other15 Oct 2025ViewSource
- Other15 Oct 2025ViewSource
- Other26 Nov 2025ViewSource
- Other28 May 2026ViewSource
- Other28 May 2026ViewSource
- Other28 May 2026ViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
Document library
- Copy of the legal title reportTITLE DEED.pdf · uploaded 29 Jul 2017View
- Details of encumbrancesTITLE DEED.pdf · uploaded 29 Jul 2017View
- Copy of Layout Approval (in case of layout)LAYOUT MAP GP 1.pdf · uploaded 29 Jul 2017View
- Proforma of Allotment letterALLOMENT LETTER.pdf · uploaded 29 Jul 2017View
- Declaration in FORM BAFFIDAVIT GP1.pdf · uploaded 29 Jul 2017View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE GP 1.pdf · uploaded 29 Jul 2017View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CRTIFICATE GP 1.pdf · uploaded 29 Jul 2017View
- Building Plan Approval (IOD)Gokulpark Sanction Plan 1.pdf · uploaded 29 Jul 2017View
- Building Plan Approval (IOD)Gokulpark 1 Sanction Plan 13.pdf · uploaded 29 Jul 2017View
- OtherGOKULPARK LETTER.pdf · uploaded 29 Jul 2017View
- Certificates of CA (Form 5)CERTIFICATE OF CA .pdf · uploaded 15 Oct 2018View
- Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5.pdf · uploaded 21 Jun 2022View
- Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Ca Certificate 25112022_compressed (1).pdf · uploaded 15 Dec 2022View
- a Details of encumbrances concerned to Finance1 Declaration in FORM B.pdf · uploaded 1 Apr 2023View
- b Details of encumbrances concerned to Legal1 Declaration in FORM B.pdf · uploaded 1 Apr 2023View
- a Details of encumbrances concerned to FinanceGokulpark Plot 1 From B.pdf · uploaded 1 Apr 2023View
- b Details of encumbrances concerned to LegalGokulpark Plot 1 From B.pdf · uploaded 1 Apr 2023View
- Commencement Certificates / NA Order for plotted developmentcommencement certificate 1.pdf · uploaded 1 Apr 2023View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Gokul Park I_10052018.pdf · uploaded 4 Nov 2023View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Gokul Park I_10052018.pdf · uploaded 4 Nov 2023View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Gokul Park I_12052019.pdf · uploaded 4 Nov 2023View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Gokul Park I_12052019.pdf · uploaded 4 Nov 2023View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Gokul Park I_14052020.pdf · uploaded 4 Nov 2023View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Gokul Park I_14052020.pdf · uploaded 4 Nov 2023View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Gokul Park I_10082021.pdf · uploaded 4 Nov 2023View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Gokul Park I_10052021.pdf · uploaded 4 Nov 2023View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Gokul Park I_12112021.pdf · uploaded 4 Nov 2023View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Gokul Park I_10082021.pdf · uploaded 4 Nov 2023View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Gokul Park I_12112021.pdf · uploaded 4 Nov 2023View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Gokul Park I_10022022.pdf · uploaded 4 Nov 2023View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Gokul Park I_10112022.pdf · uploaded 4 Nov 2023View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Gokul Park I_12052022.pdf · uploaded 4 Nov 2023View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Gokul Park I_14092022.pdf · uploaded 4 Nov 2023View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Gokul Park I_10022022 (1).pdf · uploaded 4 Nov 2023View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Gokul Park I_10112022.pdf · uploaded 4 Nov 2023View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Gokul Park I_14092022.pdf · uploaded 4 Nov 2023View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Gokul Park I_10112022 (1).pdf · uploaded 4 Nov 2023View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Gokul Park I_12022023.pdf · uploaded 4 Nov 2023View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Gokul Park I_28082023.pdf · uploaded 4 Nov 2023View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Gokul Park I_12022023.pdf · uploaded 4 Nov 2023View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Gokul Park I_14052023.pdf · uploaded 4 Nov 2023View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Gokul Park I_28082023.pdf · uploaded 4 Nov 2023View
- Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form52018_2019.pdf · uploaded 4 Nov 2023View
- Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form52019_2020.pdf · uploaded 4 Nov 2023View
- Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form52020_2021.pdf · uploaded 4 Nov 2023View
- Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form52021_2022.pdf · uploaded 4 Nov 2023View
- Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form52022_2023.pdf · uploaded 4 Nov 2023View
- Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form52021_2022.pdf · uploaded 9 Nov 2023View
- Disclosure of sold/ booked inventory31032019_Sold Unsold_RERA.pdf · uploaded 10 Nov 2023View
- Disclosure of sold/ booked inventory31032020_Sold Unsold.pdf · uploaded 10 Nov 2023View
- Disclosure of sold/ booked inventory31032021_Sold Unsold_RERA.pdf · uploaded 10 Nov 2023View
- Disclosure of sold/ booked inventory30092021_Sold Unsold_RERA.pdf · uploaded 10 Nov 2023View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)30062022_Sold Unsold_RERA.pdf · uploaded 10 Nov 2023View
- Disclosure of sold/ booked inventory31122021Sold Unsold_RERA.pdf · uploaded 10 Nov 2023View
- Disclosure of sold/ booked inventory31032022_Sold Unsold_RERA.pdf · uploaded 10 Nov 2023View
- Disclosure of sold/ booked inventory30092022_Sold Unsold_RERA.pdf · uploaded 10 Nov 2023View
- Disclosure of sold/ booked inventory31122022_Sold Unsold_RERA.pdf · uploaded 10 Nov 2023View
- Disclosure of sold/ booked inventory31032023_Sold Unsold_RERA.pdf · uploaded 10 Nov 2023View
- Disclosure of sold/ booked inventory3062023_Sold Unsold_RERA.pdf · uploaded 10 Nov 2023View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_GP Tower 1_upto 10112023.pdf · uploaded 7 May 2024View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_GP Tower 1_upto 30012024.pdf · uploaded 7 May 2024View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_GP Tower 1_upto 10112023.pdf · uploaded 7 May 2024View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_GP Tower 1_upto March 2024.pdf · uploaded 7 May 2024View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_GP Tower 1_upto 30012024.pdf · uploaded 7 May 2024View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_GPI_upto march 2024.pdf · uploaded 7 May 2024View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_GPI_June 2024.pdf · uploaded 20 Jul 2024View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 GP I_upto June 2024.pdf · uploaded 20 Jul 2024View
- Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5_GPI.pdf · uploaded 9 Oct 2024View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1_GP I_UPTO SEPT 2024.pdf · uploaded 19 Oct 2024View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_GP I_UPTO SEPT 2024.pdf · uploaded 19 Oct 2024View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_GPI_2024.pdf · uploaded 5 Feb 2025View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_GP1_2024.pdf · uploaded 5 Feb 2025View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 GPI.pdf · uploaded 12 Apr 2025View
- Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A GPI.pdf · uploaded 12 Apr 2025View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 GPI.pdf · uploaded 12 Apr 2025View
- Form 1Form 1_28072017.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_29072017.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked InventorySold Unsold Inventory 2017.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_28072017.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_29072017.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked InventorySold Unsold Inventory 2017.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_28072017.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_29072017.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked InventorySold Unsold Inventory 2017.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_10052018.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_10052018.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked InventorySold Unsold Inventory 2017.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_10052018.pdf · uploaded 6 Aug 2025View
- Form 2Form 1_Gokul Park I_10052018.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked InventorySold Unsold Inventory 2017.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_10052018.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_10052018.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked InventorySold Unsold Inventory 2017.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_12052019.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_12052019.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory31032019_Sold Unsold_RERA.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_12052019.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_12052019.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory31032019_Sold Unsold_RERA.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_12052019.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_12052019.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory31032019_Sold Unsold_RERA.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_12052019.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_12052019.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory31032019_Sold Unsold_RERA.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_14052020.pdf · uploaded 6 Aug 2025View
- Form 2Form 1_Gokul Park I_14052020.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory31032020_Sold Unsold.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_14052020.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_14052020.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory31032020_Sold Unsold.pdf · uploaded 6 Aug 2025View
- Form 1Form 2_Gokul Park I_14052020.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_14052020.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory31032020_Sold Unsold.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_14052020.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_14052020.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory31032020_Sold Unsold.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_10052021.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_10052021.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory31032021_Sold Unsold_RERA.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_10082021.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_10082021.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory31032021_Sold Unsold_RERA.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_12112021.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_12112021.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory30092021_Sold Unsold_RERA.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_10022022.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_10022022.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory31122021Sold Unsold_RERA.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_12052022.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_12052022.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory31032022_Sold Unsold_RERA.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_12052022.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_12052022.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory30062022_Sold Unsold_RERA.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_10112022.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_10112022.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory30092022_Sold Unsold_RERA.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_12022023.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_12022023.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory31122022_Sold Unsold_RERA.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_14052023.pdf · uploaded 6 Aug 2025View
- Form 2Form 2_Gokul Park I_14052023.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory31032023_Sold Unsold_RERA.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_28082023.pdf · uploaded 6 Aug 2025View
- Form 2Form 1_Gokul Park I_28082023.pdf · uploaded 6 Aug 2025View
- Disclosure of Sold and Booked Inventory3062023_Sold Unsold_RERA.pdf · uploaded 6 Aug 2025View
- Form 1Form 1_Gokul Park I_28082023.pdf · uploaded 15 Oct 2025View
- Form 2GPI_UPTOSEP2023FORM2.pdf · uploaded 15 Oct 2025View
- Disclosure of Sold and Booked Inventory3062023_Sold Unsold_RERA.pdf · uploaded 15 Oct 2025View
- Form 1Form 1_GP Tower 1_upto dec 2023.pdf · uploaded 15 Oct 2025View
- Form 2Form 2_GP Tower 1_upto dec 2023.pdf · uploaded 15 Oct 2025View
- Disclosure of Sold and Booked Inventory31032023_Sold Unsold_RERA.pdf · uploaded 15 Oct 2025View
- Form 1Form 1_GP Tower 1_upto March 2024.pdf · uploaded 15 Oct 2025View
- Form 2Form 2 GPI.pdf · uploaded 15 Oct 2025View
- Disclosure of Sold and Booked InventoryForm 3_31032023_Sold Unsold.pdf · uploaded 15 Oct 2025View
- Form 1Form 1_GPI_June 2024.pdf · uploaded 15 Oct 2025View
- Form 2FORM 2 GP I_upto June 2024.pdf · uploaded 15 Oct 2025View
- Disclosure of Sold and Booked InventoryForm 3_3062023_Sold Unsold.pdf · uploaded 15 Oct 2025View
- Form 1FORM 1_GP I_UPTO SEPT 2024.pdf · uploaded 26 Nov 2025View
- Form 2FORM 2_GP I_UPTO SEPT 2024.pdf · uploaded 26 Nov 2025View
- Disclosure of Sold and Booked Inventory3062023_Sold Unsold_RERA.pdf · uploaded 26 Nov 2025View
- Form 1Form 1_GPI_upto Dec 2024.pdf · uploaded 26 Nov 2025View
- Form 2Form 2_GP1_Dec 2024.pdf · uploaded 26 Nov 2025View
- Disclosure of Sold and Booked Inventory3062023_Sold Unsold_RERA.pdf · uploaded 26 Nov 2025View
- Form 120 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf · uploaded 26 Nov 2025View
- Form 221 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf · uploaded 26 Nov 2025View
- Disclosure of Sold and Booked Inventory3062023_Sold Unsold_RERA.pdf · uploaded 26 Nov 2025View
- Withdrawal Update Form 1GPIFORM1_uptoJune25.pdf · uploaded 27 Nov 2025View
- Withdrawal Update Form 2GPIFORM2_uptoJune25.pdf · uploaded 27 Nov 2025View
- Withdrawal Update Form 1Form 1_Gokul Park I_upto Sept2025.pdf · uploaded 27 Nov 2025View
- Withdrawal Update Form 2Form 2_Gokul Park I_upto Sept2025.pdf · uploaded 27 Nov 2025View
- Withdrawal Update Form 1Form 1_Gokul Park I_upto Sept2025.pdf · uploaded 7 Jan 2026View
- Withdrawal Update Form 2Form 2_Gokul Park I_upto Sept2025.pdf · uploaded 7 Jan 2026View
- Withdrawal Update Form 1Form 1_Gokul Park I_upto Sept2025.pdf · uploaded 12 Jan 2026View
- Withdrawal Update Form 2Form 2_Gokul Park I_upto Sept2025.pdf · uploaded 12 Jan 2026View
- Withdrawal Update Form 1FORM1GPIUPTODEC2025.pdf · uploaded 14 Jan 2026View
- Withdrawal Update Form 2FORM2GPIUPTODEC2025.pdf · uploaded 14 Jan 2026View
- Withdrawal Update Form 1Gokul Park 1_Form 1_Apr 2026.pdf · uploaded 14 Apr 2026View
- Withdrawal Update Form 2Gokul Park 1_Form 2_Apr 2026.pdf · uploaded 14 Apr 2026View
- Form 2A (FY 2017-2018)Form 2A.pdf · uploaded 28 May 2026View
- Form 2A (FY 2018-2019)Form 2A.pdf · uploaded 28 May 2026View
- Form 2A (FY 2019-2020)Form 2A.pdf · uploaded 28 May 2026View
- Form 2A (FY 2020-2021)Form 2A.pdf · uploaded 28 May 2026View
- Form 2A (FY 2021-2022)Form 2A.pdf · uploaded 28 May 2026View
- Form 2A (FY 2022-2023)Form 2A.pdf · uploaded 28 May 2026View
- Form 2A (FY 2023-2024)Form 2A.pdf · uploaded 28 May 2026View
- Form 2A (FY 2024-2025)Form 2A.pdf · uploaded 28 May 2026View
- Form 2A (FY 2025-2026)Gokul Park 1Form 2AApr 2026.pdf · uploaded 28 May 2026View
- Form 5 (FY 2017-2018)Form52018_2019.pdf · uploaded 28 May 2026View
- Form 5 (FY 2018-2019)Form52018_2019.pdf · uploaded 28 May 2026View
- Form 5 (FY 2019-2020)Form52019_2020.pdf · uploaded 28 May 2026View
- Form 5 (FY 2020-2021)Form52020_2021.pdf · uploaded 28 May 2026View
- Form 5 (FY 2021-2022)Form52021_2022.pdf · uploaded 28 May 2026View
- Form 5 (FY 2022-2023)Form52022_2023.pdf · uploaded 28 May 2026View
- Form 5 (FY 2023-2024)FORM 5GP IUPTOSEPT2024.pdf · uploaded 30 May 2026View
- Form 5 (FY 2024-2025)Form 5GokulParkIupto Sept2025.pdf · uploaded 30 May 2026View
- Withdrawal Update Form 1Form1GPI.pdf · uploaded 15 Jul 2026View
- Withdrawal Update Form 2Form2GPI.pdf · uploaded 15 Jul 2026View
- Form 5 (FY 2025-2026)Gokul Park I form 5.pdf · uploaded 30 Sep 2026View
Promoter documents
Technical documents
Other legal documents
- OtherGOKULPARK LETTER.pdfView
Proforma allotment letter
- Proforma allotment letterALLOMENT LETTER.pdfView
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Nagpur (M Corp.), Nagpur (Urban) taluka
Survey, CTS, gat or plot numbers
As published on MahaRERA's project page
83/1/1
Boundaries
- North
- Road
- South
- Plot No 2
- East
- 83 By 1 By 2
- West
- Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Anant Shrikant Raole | — |
| Architect | Rukhsana Badar | — |
| Chartered accountant | Sanjay Lalwani | — |
| Chartered accountant | — | — |
| Engineer | Mangesh Saiwala | — |
| Engineer | Rahul Suresh Yelekar | — |
| Other | Anil Budhram Soni | — |
| Other | Digamber Uaike | — |
| Other | Venkatswami Sirsulla | — |
Source: MahaRERA project page. Contact details are not shown.