Skip to content
Deedo home
Menu

George Developers ELITE

Completed

Nagpur (M Corp.), Nagpur 440013 |Promoter: George Developers

31 Aug 2017Registered with MahaRERA
30 Mar 2018Promised completion
1Building
26Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
01, 02, 03, 04, 05, 0626 units in all
Land area for this project
1,024 sq m (11,020 sq ft)
Permissible built-up area
1,664 sq m (17,909 sq ft)
Sanctioned built-up area
1,249 sq m (13,442 sq ft)
Address
1/511, 512/75PIN 440013
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.12273, 72.83020
George Developers ELITE is at latitude 19.12273, longitude 72.83020.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2018

The latest completion date on record passed 8 years and 7 months ago.

Registered
31 Aug 2017
Promised
30 Mar 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001062031 Aug 201730 Mar 2018—George DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Elite926

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

26 units registered

01 · 3 units02 · 1 unit03 · 2 units04 · 5 units05 · 10 units06 · 5 units
TypeCarpet areaUnits
0111 sq m · 118 sq ft3
0213 sq m · 140 sq ft1
0315 sq m · 161 sq ft2
0462 sq m · 667 sq ft5
0544 sq m · 474 sq ft10
0642 sq m · 452 sq ft5

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Elite

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyCORPORATION CONNECTION100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)DONE100%
  • Storm Water DrainsDRAINAGE PROVIDED100%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingPROVIDED50%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsPROVIDED100%
  • Electrical meter room, sub-station, receiving stationPROVIDED100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

9 documents held by Deedo, 19 filings listed on MahaRERA's project page

Form b

Form 1

Form 2

Registration certificate

Form 5

Other

Building plans

Layout plan

Document library

  • Copy of the legal title reportSearch Report.pdf · uploaded 5 Aug 2017Source
  • Copy of Layout Approval (in case of layout)building permit.pdf · uploaded 5 Aug 2017View
  • Proforma of Allotment letterSelf Declaration.PDF · uploaded 5 Aug 2017Source
  • Building Plan Approval (IOD)sanctioned map 1.pdf · uploaded 5 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentbuilding permit.pdf · uploaded 5 Aug 2017View
  • Building Plan Approval (IOD)sanctioned map 2.pdf · uploaded 5 Aug 2017View
  • Details of encumbrancesEncumbrances certificate.pdf · uploaded 8 Aug 2017Source
  • Declaration in FORM BForm B.pdf · uploaded 8 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate.pdf · uploaded 8 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineres certificate.pdf · uploaded 8 Aug 2017View
  • Certificates of CA (Form 5)Form 5.pdf · uploaded 29 Sep 2018View
  • Certificates of Architect (Form 4)Form 4.PDF · uploaded 25 Jun 2019Source
  • Certificates of CA (Form 5)Form 5 George.PDF · uploaded 25 Jun 2019Source

Promoter documents

  • Legal Title reportSearch Report.pdf · uploaded 5 Aug 2017Source
  • Declaration Form BForm B.pdf · uploaded 8 Aug 2017View

Technical documents

  • Layout Approvalbuilding permit.pdfView
  • Building Plan Approvalsanctioned map 1.pdfView
  • Building Plan Approvalsanctioned map 2.pdfView

Proforma allotment letter

  • Proforma allotment letterSelf Declaration.PDFSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

1/511512/75

As published on MahaRERA's project page

1/511,512/75

Boundaries

North
9 Mtr Road
South
18 Mtr Road
East
18 Mtr Road
West
Plot NO 3

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVirendra I Khare—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology