Ganaraya Heights-3 Condominium

Completed

Nagpur (M Corp.), Nagpur 440024 |Promoter: Pinnacle Buildcon

Residential / Group HousingRERAP50500013852
27 Oct 2017Registered with MahaRERA
31 Mar 2019Promised completion
1Building
14Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Residential and comm14 units in all
Land area for this project
557 sq m (6,000 sq ft)
Permissible built-up area
557 sq m (6,000 sq ft)
Sanctioned built-up area
557 sq m (6,000 sq ft)
Address
Plot No. 189PIN 440024
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.18386, 72.85843
Ganaraya Heights-3 Condominium is at latitude 19.18386, longitude 72.85843.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2019

The latest completion date on record passed 7 years and 7 months ago.

Registered
27 Oct 2017
Promised
31 Mar 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001385227 Oct 201731 Mar 2019—Pinnacle BuildconProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Ganaraya Heights - 3714

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

14 units registered

Residential and comm · 14 units
TypeCarpet areaUnits
Residential and comm549.35 sq m · 5,913 sq ft14

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Ganaraya Heights - 3

  • Excavation100%
  • Basement (if any)1%
  • Podiums (if any)0%
  • Plinth1%
  • Stilt Floor1%
  • Slabs of Super Structure5%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNAGPUR MUNICIPAL CORPORATION100%
  • Water SupplyNAGPUR MUNICIPAL CORPORATION100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)NAGPUR MUNICIPAL CORPORATION100%
  • Storm Water DrainsNAGPUR MUNICIPAL CORPORATION100%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingSNDL100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingYET TO START0%
  • Energy managemcntYET TO START0%
  • Fire protection and fire safety requirementsYET TO START0%
  • Electrical meter room, sub-station, receiving stationYET TO START0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingYET TO START0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

2 documents held by Deedo, 16 filings listed on MahaRERA's project page

Registration certificate

Other

Document library

  • Copy of the legal title reportLEGAL TITLE REPORT.pdf · uploaded 28 Sep 2017Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1.pdf · uploaded 28 Sep 2017Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER CERTIFICATE_NEW_NEW_NEW.pdf · uploaded 28 Sep 2017Source
  • Building Plan Approval (IOD)SANCTION PLAN.pdf · uploaded 28 Sep 2017Source
  • Declaration in FORM Bmerged AFFIDVIT.pdf · uploaded 3 Oct 2017Source
  • Proforma of Allotment lettersale deed 1.pdf · uploaded 5 Oct 2017Source
  • Proforma of Allotment lettersale deed 2.pdf · uploaded 5 Oct 2017Source
  • Details of encumbrancesENCUMBRANCES.pdf · uploaded 5 Oct 2017Source
  • Copy of Layout Approval (in case of layout)SANCTION PLAN.pdf · uploaded 5 Oct 2017Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Scan Pdf.pdf · uploaded 22 Nov 2019Source
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 Scan Pdf.pdf · uploaded 22 Nov 2019Source

Promoter documents

  • Legal Title reportLEGAL TITLE REPORT.pdf · uploaded 28 Sep 2017Source
  • Declaration Form Bmerged AFFIDVIT.pdf · uploaded 3 Oct 2017Source

Technical documents

  • Building Plan ApprovalSANCTION PLAN.pdfSource
  • Layout ApprovalSANCTION PLAN.pdfSource

Proforma allotment letter

  • Proforma allotment lettersale deed 2.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

189PLOT NO. 189

As published on MahaRERA's project page

PLOT NO. 189

Boundaries

North
Road
South
Road
East
188
West
190

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVijayshree Vilas Surushe—
EngineerLiladhar Bhayyaji Kukde—
OtherSuresh Bhaiyyaji Bhomale—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology