Durvankur Enclave

Completed

Nagpur (M Corp.), Nagpur 440015 |Promoter: Niraj Madhukar Rahate

Residential / Group HousingRERAP50500015502
1 Mar 2018Registered with MahaRERA
30 Dec 2021Promised completion
1Building
12Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK12 units in all
Land area for this project
481 sq m (5,175 sq ft)
Permissible built-up area
625 sq m (6,727 sq ft)
Sanctioned built-up area
625 sq m (6,727 sq ft)
Address
Plot No 5, K No 96/5, Phno 44, Wardha Road, SomalwadaPIN 440015
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.09260, 79.07260
Durvankur Enclave is at latitude 21.09260, longitude 79.07260.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2021

The latest completion date on record passed 4 years and 10 months ago.

Registered
1 Mar 2018
Promised
30 Dec 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000155021 Mar 201830 Dec 2021—Niraj Madhukar RahateProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Durvankur Enclave512

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

12 units registered

2BHK · 12 units
TypeCarpet areaUnits
2BHK45.26 sq m · 487 sq ft12

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00007
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Durvankur Enclave

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNMC WATER SUPPLY AND BORING0%
  • Sewerage (Chamber, Lines, Septic Tank , STP).0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWATER CONSERVATION0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationONLY ELECTRIC PANEL BOARD0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

1 document held by Deedo, 19 filings listed on MahaRERA's project page

Registration certificate

Document library

  • Copy of the legal title reportTITLEandSearchReport.pdf · uploaded 25 Feb 2018Source
  • Details of encumbrancescertificate NO EMCUMBURSEMENT.pdf · uploaded 25 Feb 2018Source
  • Copy of Layout Approval (in case of layout)FINAL MAP UPLOAD.pdf · uploaded 25 Feb 2018Source
  • Declaration in FORM BAffidavit ANNEXURE B.pdf · uploaded 25 Feb 2018Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects.pdf · uploaded 25 Feb 2018Source
  • Building Plan Approval (IOD)FINAL MAP UPLOAD.pdf · uploaded 25 Feb 2018Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 25 Feb 2018Source
  • Proforma of Allotment letterAgREEMENT format Durvankur Enclave.pdf · uploaded 25 Feb 2018Source
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 25 Feb 2018Source
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT.pdf · uploaded 25 Feb 2018Source
  • Certificates of CA (Form 5)Govindraj RERA Form5 Certificate.pdf · uploaded 26 Feb 2019Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentgovindraj rera certificate.pdf · uploaded 12 Feb 2020Source
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4 GOVINDRAJ INFRATECH.pdf · uploaded 12 Feb 2020Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentGovindraj Infratech OC.pdf · uploaded 27 Jan 2024Source

Promoter documents

  • Legal Title reportTITLEandSearchReport.pdf · uploaded 25 Feb 2018Source
  • Declaration Form BAffidavit ANNEXURE B.pdf · uploaded 25 Feb 2018Source

Technical documents

  • Layout ApprovalFINAL MAP UPLOAD.pdfSource
  • Building Plan ApprovalFINAL MAP UPLOAD.pdfSource

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

K NO 96/5PHNO 44PLOT NO 5

As published on MahaRERA's project page

PLOT NO 5, K NO 96/5, PHNO 44

Boundaries

North
Plot No 6
South
Open Space Layout
East
Road 9 Mtrs
West
Survey No 96-6

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPrashant Satpute—
EngineerPatankar Structural Engineer—
OtherRakesh Singh—

Source: MahaRERA project page. Contact details are not shown.