BLD_009475Not yet due13 floors

Atharva Sapphire Towers-B · Atharva Sapphire

Nagpur (M Corp.) · RERA P50500054298

13Sanctioned habitable floorsregistration certificate
31 Dec 2029Promised completion

Floors

13 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P50500054298 · registered 15 Jan 2024
Promised completion
31 Dec 2029
Sanctioned habitable floors
13

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
2BHK62.4 m² (671 sq.ft)40not published
3BHK71.3 m² (768 sq.ft)11not published
3BHK72.8 m² (783 sq.ft)11not published
3BHK73.2 m² (788 sq.ft)22not published
3BHK90.4 m² (973 sq.ft)22not published
Shop6.9 m² (75 sq.ft)1not published
Shop16.5 m² (178 sq.ft)1not published
Shop20 m² (215 sq.ft)1not published
Shop26.4 m² (284 sq.ft)1not published
Shop28.1 m² (303 sq.ft)1not published
Shop28.3 m² (305 sq.ft)1not published
Shop28.3 m² (305 sq.ft)1not published
Shop30.7 m² (331 sq.ft)1not published
Shop32.4 m² (349 sq.ft)1not published
Shop32.5 m² (350 sq.ft)1not published
Shop34.6 m² (372 sq.ft)2not published
Shop35.9 m² (387 sq.ft)1not published
Shop36.8 m² (396 sq.ft)1not published
Shop37.9 m² (408 sq.ft)1not published
Shop42.2 m² (454 sq.ft)1not published
Shop52.4 m² (564 sq.ft)1not published
Shop54.1 m² (582 sq.ft)1not published
Total124

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered000109
Open Space0000

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor66%
  • Slabs of Super Structure5%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through10 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology