anupama pearl regency

Completed

Nagpur (M Corp.), Nagpur 440013 |Promoter: jarry profit

Residential / Group HousingRERAP50500004233
9 Aug 2017Registered with MahaRERA
19 Jan 2021Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
463 sq m (4,986 sq ft)
Permissible built-up area
602 sq m (6,481 sq ft)
Sanctioned built-up area
463 sq m (4,986 sq ft)
Address
117, 118PIN 440013
Designated bank account
Punjab National Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.18136, 79.01365
anupama pearl regency is at latitude 21.18136, longitude 79.01365.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 19 Jan 2021

The latest completion date on record passed 5 years and 9 months ago.

Registered
9 Aug 2017
Promised
19 Jan 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000042339 Aug 201719 Jan 2021—jarry profitProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Anupama Pearl Regency6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00004

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Anupama Pearl Regency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supplyborwell100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER SANCTIONED PLAN100%
  • Storm Water DrainsAS PER SANCTIONED PLAN100%
  • Landscaping & Tree PlantingAS PER SANCTIONED PLAN100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER PLAN100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationELECTRICAL PANEL100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

30 documents held by Deedo, 47 filings listed on MahaRERA's project page

Title

Encumbrance

Form b

Form 1s

Building plan

Form 5s

Registration certificate

Form 2

Others

Form 2as

Form 4

Completion

Layout plan

Allotment letter

Document library

  • Copy of the legal title reporttitlereport-rera.pdf · uploaded 31 Jul 2017View
  • Details of encumbrancesencumbrances.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)layoutcap.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterallotment letter.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)rera-achkadu.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)BUILDING PERMIT.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BFORM B.pdf · uploaded 31 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 9 Jul 2018View
  • Certificates of CA (Form 5)Form 5_ ANUPAMA PEARL.pdf · uploaded 15 Dec 2018View
  • Certificates of CA (Form 5)Form 5 (1).pdf · uploaded 8 Feb 2020View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)PEARL REGENCY.pdf · uploaded 15 Aug 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2A JUNE 2021_compressed.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A MARCH 2020_compressed.pdf · uploaded 15 Aug 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A MARCH 2021_compressed.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A JUNE 2021_compressed.pdf · uploaded 15 Aug 2021View
  • Certificates of CA (Form 5)Form 5.pdf · uploaded 15 Aug 2021View
  • Certificates of CA (Form 5)FORM 5_Pearl Regence_MARCH 21.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form-2A-Anupama Pearl Regency-Sep-21.pdf · uploaded 12 Oct 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)APR-DOD-part-1.pdf · uploaded 20 Oct 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)APR-DOD-part-2.pdf · uploaded 20 Oct 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)APR-DOD-part-3.pdf · uploaded 20 Oct 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)APR-DOD-part-4.pdf · uploaded 20 Oct 2021View
  • Status of ConveyanceAPR-DOD-part-1.pdf · uploaded 20 Oct 2021View
  • Status of ConveyanceAPR-DOD-part-2.pdf · uploaded 20 Oct 2021View
  • Status of ConveyanceAPR-DOD-part-3.pdf · uploaded 20 Oct 2021View
  • Status of ConveyanceAPR-DOD-part-4.pdf · uploaded 20 Oct 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Anupama Pearl Regency-Form-1-dec-21.pdf · uploaded 8 Feb 2022View
  • CERSAI detailsCERSAI_Search_Report_Anupama Pearl Regency.pdf · uploaded 25 May 2022View
  • CERSAI detailsCERSAI_Search_Report_200241642076_For_Asset_Based_Search_07_07_2022_14_31_08_260.pdf · uploaded 7 Jul 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)4 Certificates of CA (Form 5).pdf · uploaded 17 Jan 2023View
  • Architect’s Certificate on Completion of Project (Form 4)form 4 revised.pdf · uploaded 3 Apr 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentDocScanner 10-Apr-2023 10-48.pdf · uploaded 10 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)2 Certificates of CA (Form 5) Mar-18.pdf · uploaded 18 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)4 Certificates of CA (Form 5) Mar-21.pdf · uploaded 18 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)4 Certificates of CA (Form 5) Mar-21.pdf · uploaded 18 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM-5_MAR-19_001.pdf · uploaded 20 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM-5_MAR-20_001.pdf · uploaded 20 May 2023View
  • Other – LegalANUPAMA PEARL REJENCY.pdf · uploaded 24 Jun 2023View
  • Other – FinanceANUPAMA PEARL REJENCY.pdf · uploaded 24 Jun 2023View
  • Other – TechnicalANUPAMA PEARL REJENCY.pdf · uploaded 24 Jun 2023View

Promoter documents

  • Legal Title reporttitlereport-rera.pdf · uploaded 31 Jul 2017View
  • Declaration Form BFORM B.pdf · uploaded 31 Jul 2017View

Technical documents

  • Layout Approvallayoutcap.pdfView
  • Building Plan ApprovalBUILDING PERMIT.pdfView

Other legal documents

  • Other – LegalANUPAMA PEARL REJENCY.pdfView

Financial documents

  • Other – FinanceANUPAMA PEARL REJENCY.pdf · uploaded 24 Jun 2023View

Proforma allotment letter

  • Proforma allotment letterallotment letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

117118

As published on MahaRERA's project page

117,118

Boundaries

North
30mtrs Wide Road
South
Other Layout
East
116
West
119

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectLokesh Kadu—
EngineerGanesh Ragit—
OtherAbdul Sameer Sheikh—

Source: MahaRERA project page. Contact details are not shown.