Skip to content
Deedo home
Menu

Aarna - 2

Completed

Nagpur (M Corp.), Nagpur 440034 |Promoter: Pradeep Subhash Somani

Residential / Group HousingRERAP50500013847
27 Oct 2017Registered with MahaRERA
30 Jun 2018Promised completion
1Building
12Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Flat12 units in all
Land area for this project
418 sq m (4,500 sq ft)
Permissible built-up area
544 sq m (5,856 sq ft)
Sanctioned built-up area
544 sq m (5,856 sq ft)
Recreational open space
418 sq m (4,500 sq ft)
Address
Plot No. 4D and 5A, CTS No. 34, Sheet No. 19PIN 440034
Designated bank account
Punjab National Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.09770, 79.12945
Aarna - 2 is at latitude 21.09770, longitude 79.12945.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2018

The latest completion date on record passed 8 years and 4 months ago.

Registered
27 Oct 2017
Promised
30 Jun 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001384727 Oct 201730 Jun 2018—Pradeep Subhash SomaniProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Aarna - 2612

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

12 units registered

Flat · 12 units
TypeCarpet areaUnits
Flat40.77 sq m · 439 sq ft4
Flat44.95 sq m · 484 sq ft4
Flat45.68 sq m · 492 sq ft4

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Aarna - 2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Common areas and amenities

  • Internal Roads & FootpathsFor Common Area Space100%
  • Water SupplyAvailable100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Available100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingFor Common Area Space100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingProposed0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationElectric Meter Board proposed0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

8 documents held by Deedo, 21 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Form 1

Registration certificate

Other

Layout plan

Document library

  • Copy of the legal title report5 Shri Ganesh Legal Search.pdf · uploaded 6 Oct 2017View
  • Details of encumbrances3 Shri Ganesh Non Encumberance.pdf · uploaded 6 Oct 2017View
  • Copy of Layout Approval (in case of layout)11 Shri Ganesh Layout Map.pdf · uploaded 6 Oct 2017View
  • Proforma of Allotment letter9 Shri Ganesh ATS and AL.pdf · uploaded 6 Oct 2017Source
  • Commencement Certificates / NA Order for plotted development4 Shri Ganesh Commencement Certificate.PDF · uploaded 6 Oct 2017View
  • Declaration in FORM B1 Shri Ganesh Form B.pdf · uploaded 6 Oct 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)7 Shri Ganesh Architect Certificate.PDF · uploaded 6 Oct 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)8 Shri Ganesh Engineer Certificate.PDF · uploaded 6 Oct 2017Source
  • Building Plan Approval (IOD)11 Shri Ganesh Layout Map.pdf · uploaded 6 Oct 2017View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)CA CERTIFICATE.pdf · uploaded 4 Nov 2019Source
  • Architect’s Certificate on Completion of Project (Form 4)AC.pdf · uploaded 5 Nov 2019Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)CAC.pdf · uploaded 5 Nov 2019Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)CAC.pdf · uploaded 5 Nov 2019Source
  • Architect’s Certificate on Completion of Project (Form 4)AC.pdf · uploaded 5 Nov 2019Source
  • Architect’s Certificate on Completion of Project (Form 4)AC.pdf · uploaded 5 Nov 2019Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)CAC.pdf · uploaded 5 Nov 2019Source

Promoter documents

  • Legal Title report5 Shri Ganesh Legal Search.pdf · uploaded 6 Oct 2017View
  • Declaration Form B1 Shri Ganesh Form B.pdf · uploaded 6 Oct 2017View

Technical documents

  • Layout Approval11 Shri Ganesh Layout Map.pdfView
  • Building Plan Approval11 Shri Ganesh Layout Map.pdfView

Proforma allotment letter

  • Proforma allotment letter9 Shri Ganesh ATS and AL.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

345ACTS No. 34Plot No. 4DSheet No. 19

As published on MahaRERA's project page

Plot No. 4D and 5A, CTS No. 34, Sheet No. 19

Boundaries

North
Open Space
South
Plot No 4A
East
Plot No 5B and 4K
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHitendra Moon—
EngineerShekhar Dorarwar—
OtherNikita K Gupta—
OtherSantosh Gangrade—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology