Skip to content

Kukreja West19

Certificate Signed

Mouza Lendhra, Nagpur 440010 |Promoter: Tagsure Hospitality LLP

18 Jan 2024Registered with MahaRERA
31 Dec 2029Promised completion
30 Apr 2030Revised completionPushed back 4 months
1Building
114Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
—114 units in all
Address
Cts No 185/1/1, 185/7 And 185/8, Sheet No 26/18, Kh No 69, Mouje Lendhra, North Ambazari Road, Dharampeth, North Ambazari Road, Dharampeth, Mouje LendhraPIN 440010
Designated bank account
76
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.13408, 79.06014
Kukreja West19 is at latitude 21.13408, longitude 79.06014.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
18 Jan 2024
Promised
31 Dec 2029
Revised
30 Apr 2030

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050005438718 Jan 202431 Dec 202930 Apr 2030Tagsure Hospitality LLPProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Commercial29114

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

114 units registered

— · 114 units
TypeCarpet areaUnits
——114

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

46 documents held by Deedo, 181 filings listed on MahaRERA's project page

Registration certificate

Other (27)

  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
Show all 227 documentsShow fewer documents

Other (27)

  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView

Commencement certificate

  • Commencement certificateDate not statedView

Form 1 (9)

  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView

Allotment letter

  • Allotment letterDate not statedView

Title report

  • Title reportDate not statedView

Encumbrance details

  • Encumbrance detailsDate not statedView

Form 2 (3)

  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView

Layout plan

  • Layout planDate not statedView

Building plan

  • Building planDate not statedView

Legal

  • Other – LegalSALE DEED - MISHRIKOTKAR-1-10_compressed.pdf · uploaded 15 Dec 2023View
  • Other – LegalSALE DEED - MISHRIKOTKAR-11-20_compressed.pdf · uploaded 15 Dec 2023View
  • Other – LegalSALE DEED - MISHRIKOTKAR-21-30_compressed.pdf · uploaded 15 Dec 2023View
  • Other – LegalSALE DEED - MISHRIKOTKAR-31-40_compressed.pdf · uploaded 15 Dec 2023View
  • Other – LegalSALE DEED - MISHRIKOTKAR-41-49_compressed.pdf · uploaded 15 Dec 2023View
  • Other – Legal01_Tagsure LLP Agreement 0212102023_compressed.pdf · uploaded 15 Dec 2023View
  • Other – Legalsale deed jp.pdf · uploaded 16 Dec 2023View
  • Legal Title reportSearch Report-TAGSURE.pdf · uploaded 16 Dec 2023View
  • Other – Legal01_Tagsure LLP Agreement 0212102023_compressed.pdf · uploaded 10 Jan 2024View
  • Other – LegalInitial Agreement.pdf · uploaded 10 Jan 2024View
  • Declaration Form BLEGAL TITLE REPORT_KUKREJA WEST19.pdf · uploaded 3 Apr 2026Source
  • Declaration Form BSALE DEED - 185_1_1 AND 185_8.pdf · uploaded 3 Apr 2026Source
  • Declaration Form BSALE DEED - 185_2.pdf · uploaded 3 Apr 2026Source
  • Declaration Form BSALE DEED - 185_3.pdf · uploaded 3 Apr 2026Source
  • Declaration Form BSALE DEED - 185_4.pdf · uploaded 3 Apr 2026Source
  • Declaration Form BSALE DEED - 185_5 AND 185_6.pdf · uploaded 3 Apr 2026Source
  • Declaration Form BSALE DEED - 185_7.pdf · uploaded 3 Apr 2026Source
  • Declaration Form BPROPERTY CARD 185-1-1.pdf · uploaded 3 Apr 2026Source
  • Declaration Form BPROPERTY CARD 185-2.pdf · uploaded 3 Apr 2026Source
  • Declaration Form BPROPERTY CARD 185-3.pdf · uploaded 3 Apr 2026Source
  • Declaration Form BPROPERTY CARD 185-4.pdf · uploaded 3 Apr 2026Source
  • Declaration Form BPROPERTY CARD185-5 .pdf · uploaded 3 Apr 2026Source
  • Declaration Form BPROPERTY CARD 185-6.pdf · uploaded 3 Apr 2026Source
  • Declaration Form BPROPERTY CARD 185-7.pdf · uploaded 3 Apr 2026Source
  • Declaration Form BPROPERTY CARD 185-8.pdf · uploaded 3 Apr 2026Source
  • Declaration Form BFORM B_KUKREJA WEST19.pdf · uploaded 8 Apr 2026Source
  • Declaration Form BFORM B_KUKREJA WEST19.pdf · uploaded 19 Apr 2026Source

Migrated

  • 1 PAN CardPAN.pdf · uploaded 15 Dec 2023View
  • 1 a Details of encumbrances concerned to FinanceENCUM_FINANCE_Prepared_Capital West 19.pdf · uploaded 15 Dec 2023View
  • 2 a Details of encumbrances concerned to FinanceENCUM_LEGAL_Prepared_Capital West 19 -.pdf · uploaded 15 Dec 2023Source
  • 1 b Details of encumbrances concerned to LegalENCUM_FINANCE_Prepared_Capital West 19.pdf · uploaded 15 Dec 2023Source
  • 2 b Details of encumbrances concerned to LegalENCUM_LEGAL_Prepared_Capital West 19 -.pdf · uploaded 15 Dec 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentE PERMIT PDF TAGSURE.pdf · uploaded 15 Dec 2023View
  • 1 Declaration in FORM BFORM-B_Capital West-19_.pdf · uploaded 15 Dec 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsInterest Discloser_Anmol Wadhwa.pdf · uploaded 15 Dec 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsInterest Discloser_Anuj Chadda.pdf · uploaded 15 Dec 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsInterest Discloser_Manish Chadda.pdf · uploaded 15 Dec 2023Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsInterest Discloser_Rahul Chadda.pdf · uploaded 15 Dec 2023Source
  • 5 Disclosure of Interest in Other Real Estate OrganizationsIntreest Declaration -Mohit Chadda.pdf · uploaded 15 Dec 2023Source
  • 1 Proforma of Allotment letterAllotment Letter _Capital West-19.pdf · uploaded 15 Dec 2023View
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Account Disclosure_Capital West 19 (1).pdf · uploaded 15 Dec 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report - ALLOTMENT LETTER _Capital West 19.pdf · uploaded 15 Dec 2023View
  • 1 Deviation Report with respect to model copy of AgreementATS DEVIATION REPORT -Prepared_Capital West-19.pdf · uploaded 15 Dec 2023View
  • 1 Other – LegalSALE DEED - MISHRIKOTKAR-1-10_compressed.pdf · uploaded 15 Dec 2023View
  • 2 Other – LegalSALE DEED - MISHRIKOTKAR-11-20_compressed.pdf · uploaded 15 Dec 2023View
  • 3 Other – LegalSALE DEED - MISHRIKOTKAR-21-30_compressed.pdf · uploaded 15 Dec 2023View
  • 4 Other – LegalSALE DEED - MISHRIKOTKAR-31-40_compressed.pdf · uploaded 15 Dec 2023View
  • 5 Other – LegalSALE DEED - MISHRIKOTKAR-41-49_compressed.pdf · uploaded 15 Dec 2023View
  • 6 Other – Legal01_Tagsure LLP Agreement 0212102023_compressed.pdf · uploaded 15 Dec 2023View
  • 1 Copy of the legal title reportSearch Report-TAGSURE.pdf · uploaded 16 Dec 2023View
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 16 Dec 2023View
  • 1 Building Plan Approval / NA Order for plotted developmentE SANCTION PDF TAGSURE_compressed.pdf · uploaded 16 Dec 2023View
  • 1 Declaration about Commencement Certificateform d (2)_Capital West 19.pdf · uploaded 16 Dec 2023Source
  • 1 CERSAI detailsCERSAI_Search_Report_200290204600_For_Asset_Based_Search_15_12_2023_18_45_25_780.pdf · uploaded 16 Dec 2023Source
  • 6 Disclosure of Interest in Other Real Estate Organizations5_Intreest Declaration -Ayush Saluja (1).pdf · uploaded 16 Dec 2023Source
  • 7 Disclosure of Interest in Other Real Estate Organizations6_Intreest Declaration -Avi Saluja.pdf · uploaded 16 Dec 2023View
  • 8 Disclosure of Interest in Other Real Estate OrganizationsIntreest Declaration -Amol Saluja .pdf · uploaded 16 Dec 2023View
  • 9 Disclosure of Interest in Other Real Estate OrganizationsIntreest Declaration -Rachna Wadhwa.pdf · uploaded 16 Dec 2023View
  • 10 Disclosure of Interest in Other Real Estate OrganizationsIntreest Declaration-Pallavi Alurwar.pdf · uploaded 16 Dec 2023View
  • 11 Disclosure of Interest in Other Real Estate OrganizationsIntreest Declaration-Jiya Mamidwar.pdf · uploaded 16 Dec 2023View
  • 12 Disclosure of Interest in Other Real Estate OrganizationsIntreest Declaration -Orange City Business Park LLP.pdf · uploaded 16 Dec 2023View
  • 1 Proforma of Agreement for saleATS- TAGSURE.pdf · uploaded 16 Dec 2023View
  • 7 Other – Legalsale deed jp.pdf · uploaded 16 Dec 2023View
  • 13 Disclosure of Interest in Other Real Estate OrganizationsInterest Discloser_Ghanshyamdas Kukreja_page-0001.pdf · uploaded 28 Dec 2023View
  • 14 Disclosure of Interest in Other Real Estate OrganizationsInterest Discloser_Shravan Kukreja_page-0001.pdf · uploaded 28 Dec 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3_CAPITAL WEST - 19_V1.pdf · uploaded 10 Jan 2024Source
  • 8 Other – Legal01_Tagsure LLP Agreement 0212102023_compressed.pdf · uploaded 10 Jan 2024View
  • 9 Other – LegalInitial Agreement.pdf · uploaded 10 Jan 2024View
  • 1 Other – TechnicalMAil.pdf · uploaded 10 Jan 2024View
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Capital West-19_Sep-2024.pdf · uploaded 20 Feb 2025View
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Capital West-19_Dec-2024.pdf · uploaded 20 Feb 2025View
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Capital West-19_Jun-2024.pdf · uploaded 20 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Capital West-19_Mar-2024.pdf · uploaded 21 Feb 2025View
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Capital West-19_Jun-2024.pdf · uploaded 21 Feb 2025View
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Capital West-19_Sep-2024.pdf · uploaded 21 Feb 2025View
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Capital West-19_Dec-2024.pdf · uploaded 21 Feb 2025View
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3_Dec-24.pdf · uploaded 21 Feb 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3_Sep-24.pdf · uploaded 21 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3_June-24.pdf · uploaded 21 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3_MAR-24.pdf · uploaded 21 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2_MAR-24.pdf · uploaded 21 Feb 2025View
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2_JUne-24.pdf · uploaded 21 Feb 2025View
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2_Sep-24.pdf · uploaded 21 Feb 2025View
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2_Dec-24.pdf · uploaded 21 Feb 2025View
  • 1 Disclosure of sold/ booked inventorySOLD-UNSOLD_MAR-24.pdf · uploaded 21 Feb 2025Source
  • 2 Disclosure of sold/ booked inventorySOLD-UNSOLD_JUNE-24.pdf · uploaded 21 Feb 2025Source
  • 3 Disclosure of sold/ booked inventorySOLD-UNSOLD_SEP-24.pdf · uploaded 21 Feb 2025View
  • 4 Disclosure of sold/ booked inventorySOLD-UNSOLD_DEC-24.pdf · uploaded 21 Feb 2025View
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM-2A.pdf · uploaded 21 Feb 2025View
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Capital west-19_2023-24.pdf · uploaded 21 Feb 2025View
  • Form 1Architect's Certificate - Mar'25.pdf · uploaded 23 May 2025Source
  • Form 2Engineers Certificate - Mar'25.pdf · uploaded 23 May 2025Source
  • Form 3CA Certificate - Mar'25.pdf · uploaded 23 May 2025Source
  • Disclosure of Sold and Booked InventoryInventory Disclosure.pdf · uploaded 23 May 2025Source
  • Self-declaration of Quarterly ProgressForm D - Commencement.pdf · uploaded 23 May 2025Source
  • Withdrawal Update Form 1Architectu0027s Certificate - Maru002725.pdf · uploaded 12 Jun 2025Source
  • Withdrawal Update Form 1Architectu0027s Certificate - Maru002725.pdf · uploaded 12 Jun 2025Source
  • Withdrawal Update Form 2Engineers Certificate - Maru002725.pdf · uploaded 12 Jun 2025Source
  • Withdrawal Update Form 2Engineers Certificate - Maru002725.pdf · uploaded 12 Jun 2025Source
  • Withdrawal Update Form 3Withdrawal Application Form3_.pdf · uploaded 12 Jun 2025Source
  • Withdrawal Update Form 3Withdrawal Application Form3_.pdf · uploaded 12 Jun 2025Source
  • Withdrawal Update Form 1Architect Certificate Q1 portal.pdf · uploaded 14 Nov 2025Source
  • Withdrawal Update Form 2Engineer Certificate.pdf · uploaded 14 Nov 2025Source
  • Withdrawal Update Form 3CA Certificate.pdf · uploaded 14 Nov 2025Source
  • Withdrawal Update Form 1Form 1 - Architech.pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 3Form 3 - CA certificate_.pdf · uploaded 26 Nov 2025Source
  • Form 5 (FY 2024-2025)FORM-5_MARCH-2025.pdf · uploaded 28 Feb 2026Source
  • Withdrawal Update Form 1FORM-1.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 1FORM-1_MARCH-2025.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 1FORM-1_June-2025.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 1FORM-1_Sep-2025.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 1FORM-1_Dec-2025.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 2FORM-2_MARCH-2025.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 2FORM-2_June-2025.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 2FORM-2_Sep-2025.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 2FORM-2_Dec-2025.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 3FORM-3.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 3FORM-3_MARCH-2025.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 3FORM-3_June-2025.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 3FORM-3_Sep-2025.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 3FORM-3_Dec-2025.pdf · uploaded 2 Mar 2026Source
  • Form 2A (FY 2023-2024)FORM-2A_MARCH-24.pdf · uploaded 2 Mar 2026Source
  • Form 2A (FY 2024-2025)FORM-2A_MARCH-2025.pdf · uploaded 2 Mar 2026Source
  • Form 5 (FY 2023-2024)FORM-_MARCH-2024.pdf · uploaded 2 Mar 2026Source
  • Withdrawal Update Form 1FORM 1 JUNE 2025.pdf · uploaded 4 Mar 2026Source
  • Withdrawal Update Form 2FORM 2 JUNE 2025.pdf · uploaded 4 Mar 2026Source
  • Withdrawal Update Form 3FORM 3 june 2025.pdf · uploaded 4 Mar 2026Source
  • Withdrawal Update Form 1form 1 march 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 1form 1 march 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 1FORM 1 JUNE 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 1FORM 1 SEPTEMBER 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 1FORM 1 DECEMBER 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 1FORM 1 DECEMBER 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 1FORM 1 DECEMBER 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 2form 2 march.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 2form 2 march.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 2FORM 2 JUNE 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 2FORM 2 SEPTEMBER 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 2FORM 2 DECEMBER 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 2form 2 december 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 2form 2 december 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 3FORM 3 MARCH 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 3FORM 3 MARCH 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 3FORM 3 JUNE.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 3FORM 3 SEPTEMBER 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 3FORM 3 DECEMBER 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 3FORM 3 DECEMBER 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 3FORM 3 DECEMBER 2025.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 1FORM-1 KUKREJA WEST-19 MAR-2026.pdf · uploaded 18 May 2026Source
  • Withdrawal Update Form 2FORM-2 KUKREJA WEST-19 MAR-2026.pdf · uploaded 18 May 2026Source
  • Withdrawal Update Form 3FORM-3 KUKREJA WEST-19 MAR-2026.pdf · uploaded 18 May 2026Source
  • Withdrawal Update Form 1FORM-1 KUKREJA WEST-19 MAR-2026.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 2FORM-2 KUKREJA WEST-19 MAR-2026.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 3FORM-3 KUKREJA WEST-19 MAR-2026.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 1FORM-1 KUKREJA WEST 19 JUN-2026.pdf · uploaded 25 Sep 2026Source
  • Withdrawal Update Form 2FORM-2 KUKREJA WEST 19 JUN-2026.pdf · uploaded 25 Sep 2026Source
  • Withdrawal Update Form 3FORM-3 KUKREJA WEST 19 JUN-2026 scan.pdf · uploaded 25 Sep 2026Source
  • Form 2A (FY 2025-2026)FORM-2A KUKREJA WEST 19 MAR-2026.pdf · uploaded 25 Sep 2026Source
  • Form 5 (FY 2025-2026)FORM-5 CAPITAL WEST 19 MAR-2026 SCAN.pdf · uploaded 25 Sep 2026Source
  • Withdrawal Update Form 1FORM 1 KUKREJA WEST 19 SEPTEMBER 2026.pdf · uploaded 10 Oct 2026Source
  • Withdrawal Update Form 2FORM 2 KUKREJA WEST 19 SEPREMBER 2026.pdf · uploaded 10 Oct 2026Source
  • Withdrawal Update Form 3FORM 3 KUKREJA WEST 19 SEPTEMBER 2026.pdf · uploaded 10 Oct 2026Source

Technical

  • DocumentLayout.pdf · uploaded 16 Dec 2023View
  • DocumentE SANCTION PDF TAGSURE_compressed.pdf · uploaded 16 Dec 2023View
  • Other – TechnicalMAil.pdf · uploaded 10 Jan 2024View
  • DocumentRevised Plan-1-6.pdf · uploaded 6 Mar 2026Source
  • DocumentRevised Plan-7-13.pdf · uploaded 6 Mar 2026Source
  • OthersFORMAT-D.pdf · uploaded 6 Mar 2026Source

Technical (Architect)

  • DocumentForm 1 Capital West-19_Sep-2024.pdf · uploaded 20 Feb 2025View
  • DocumentForm 1 Capital West-19_Dec-2024.pdf · uploaded 20 Feb 2025View
  • DocumentForm 1 Capital West-19_Mar-2024.pdf · uploaded 21 Feb 2025View
  • DocumentForm 1 Capital West-19_Jun-2024.pdf · uploaded 21 Feb 2025View
  • DocumentForm 1 Capital West-19_Sep-2024.pdf · uploaded 21 Feb 2025View
  • DocumentForm 1 Capital West-19_Dec-2024.pdf · uploaded 21 Feb 2025View
  • DocumentFORM 1 KUKREJA WEST 19 SEPTEMBER 2026.pdf · uploaded 10 Oct 2026Source

Technical (Engineer)

  • DocumentFORM-2_JUne-24.pdf · uploaded 21 Feb 2025View
  • DocumentFORM-2_Sep-24.pdf · uploaded 21 Feb 2025View
  • DocumentFORM-2_Dec-24.pdf · uploaded 21 Feb 2025View
  • DocumentFORM 2 KUKREJA WEST 19 SEPREMBER 2026.pdf · uploaded 10 Oct 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Mouza LENDHRA, Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

185/2185/3185/4185/5185/6185/7185/8CTS NO 185/1/1KH NO. 69SHEET NO. 26/18

Boundaries

North
Cts No.183 And 184
South
24m Wide Road
East
Cts No. 185 Part
West
6 Mtr. Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectLokesh Kadu—
Chartered accountantAnkit Talreja—
Chartered accountantAradhya Chachra—
EngineerKapil Khushalani—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology