Skip to content
Deedo home
Menu

Silver City

Active

Kothewada, Nagpur 441110 |Promoter: Tirupati Developers

15 Nov 2018Registered with MahaRERAFirst of 2 registrations
31 Mar 2027Promised completionLatest across registrations
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Active
RERA registrations
2
Phases
2
Land area for this project
34,564 sq m (3,72,048 sq ft)
Permissible built-up area
0 sq m (0 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
4,457 sq m (47,978 sq ft)
Planning authority
Nagpur Metropolitian Region Development Authority
Address
150 151/1 152, Hingna Road, KothewadaPIN 441110
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.01919, 79.00128
Silver City is at latitude 21.01919, longitude 79.00128.

Also registered as

Silver City - 2

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Sep 2020

P50500018573

The latest completion date on record passed 6 years and 1 month ago.

Registered
15 Nov 2018
Promised
30 Sep 2020

Completion promised for 31 Mar 2027

P50500029462
Registered
29 May 2021
Promised
31 Mar 2027

2 RERA registrations

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001857315 Nov 201830 Sep 2020—Tirupati DevelopersProject page
P5050002946229 May 202131 Mar 2027—Tirupati DevelopersProject page

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsCOMPLETED100%
  • Water SupplyCOMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Completed100%
  • Storm Water DrainsCOMPLETED100%
  • Landscaping & Tree PlantingCOMPLETED100%
  • Street LightingCOMPLETED100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterCOMPLETED100%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationCompleted100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

21 documents held by Deedo, 103 filings listed on MahaRERA's project page

Form 5s

Others

Form 1s

Form 2s

Registration certificates

  • Registration certificateP50500018573 · 18 Aug 2026ViewSource
  • Registration certificateP50500029462 · 19 Aug 2026ViewSource

Document library

  • Declaration in FORM BP50500018573 · affidavit tirupati.pdf · uploaded 6 Nov 2018Source
  • Details of encumbrancesP50500018573 · advocate certificate sc.pdf · uploaded 6 Nov 2018Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P50500018573 · sc architect certificate.pdf · uploaded 6 Nov 2018Source
  • Copy of the legal title reportP50500018573 · search report Sc.pdf · uploaded 6 Nov 2018Source
  • Copy of the legal title reportP50500018573 · search reports 2 sc.pdf · uploaded 6 Nov 2018Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P50500018573 · engineer certificate sc.pdf · uploaded 6 Nov 2018Source
  • Building Plan Approval (IOD)P50500018573 · Sc final map.pdf · uploaded 6 Nov 2018Source
  • Proforma of Allotment letterP50500018573 · sc allotment.pdf · uploaded 6 Nov 2018Source
  • Copy of Layout Approval (in case of layout)P50500018573 · Sc final map.pdf · uploaded 6 Nov 2018Source
  • Proforma of Allotment letterP50500018573 · agreement sc.pdf · uploaded 6 Nov 2018Source
  • Commencement Certificates / NA Order for plotted developmentP50500018573 · covering letter.pdf · uploaded 6 Nov 2018Source
  • Declaration about Commencement CertificateP50500018573 · DECLARATION ABOUT COMMENCEMNT CERTIFICATE SC-1.pdf · uploaded 18 Oct 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P50500018573 · SC-1 QUALITY ASSURANCE.pdf · uploaded 18 Oct 2021Source
  • Disclosure of sold/ booked inventoryP50500018573 · SC 1 DISCLOSURE INVENTORY 1-3 -1.pdf · uploaded 18 Oct 2021Source
  • Disclosure of sold/ booked inventoryP50500018573 · SC 1 DISCLOSURE INVENTORY 4-5 -1.pdf · uploaded 18 Oct 2021Source
  • CERSAI detailsP50500018573 · CERSAI_Search_Report_200230162353_For SCity.pdf · uploaded 14 Feb 2022Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)P50500018573 · Annual Report SC1 17-18.pdf · uploaded 1 Mar 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P50500018573 · Annual Report SC1 18-19.pdf · uploaded 1 Mar 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P50500018573 · Annual Report SC1 19-20.pdf · uploaded 1 Mar 2022Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P50500018573 · Annual Report SC1 20-21.pdf · uploaded 1 Mar 2022Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P50500018573 · SC quality assurance certificate declaration.pdf · uploaded 3 Mar 2022Source
  • Deviation Report with respect to model copy of AgreementP50500018573 · Deviation Report SC-1 Agreement for sale.pdf · uploaded 20 Jul 2022Source
  • Deviation Report with respect to Allotment letterP50500018573 · Deviation Report SC-1 Allotment Letter.pdf · uploaded 20 Jul 2022Source
  • Disclosure of sold/ booked inventoryP50500018573 · SC SOLD UNSOLD-1.pdf · uploaded 21 Jul 2022Source
  • Disclosure of sold/ booked inventoryP50500018573 · SC SOLD UNSOLD-2.pdf · uploaded 21 Jul 2022Source
  • Disclosure of sold/ booked inventoryP50500018573 · SC SOLD UNSOLD-3.pdf · uploaded 21 Jul 2022Source
  • Disclosure of sold/ booked inventoryP50500018573 · SC SOLD UNSOLD-4.pdf · uploaded 21 Jul 2022Source
  • Disclosure of sold/ booked inventoryP50500018573 · SC SOLD UNSOLD-5-6.pdf · uploaded 21 Jul 2022Source
  • Declaration about Commencement CertificateP50500018573 · SC DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf · uploaded 21 Jul 2022Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P50500018573 · SC-1 ARCHITECH CERTIFICATE for updation in July.pdf · uploaded 26 Jul 2022Source
  • Disclosure of sold/ booked inventoryP50500018573 · Sold Unsold SC-1-1-2 03-01.pdf · uploaded 4 Jan 2023Source
  • Disclosure of sold/ booked inventoryP50500018573 · Sold Unsold SC-1-3-5 03-01.pdf · uploaded 4 Jan 2023Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P50500018573 · Form 1 ARCHITECT'S CERT SC-1(1) 2-2-23.pdf · uploaded 5 Feb 2023Source
  • Disclosure of Interest in Other Real Estate OrganizationsP50500018573 · Disclosure of interest in other Real Estate Organization (Rahul Upganlawar).pdf · uploaded 27 Mar 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsP50500018573 · Disclosure of interest in other Real Estate Organization (Prashant Bongirwar).pdf · uploaded 27 Mar 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P50500018573 · FORM 5 CA CERTIFICATE SC-1 (2021-2022).pdf · uploaded 23 Apr 2023Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P50500018573 · FORM-1.pdf · uploaded 20 Oct 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P50500018573 · FORM-2.pdf · uploaded 20 Oct 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P50500018573 · FORM-2A 2022.pdf · uploaded 20 Oct 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P50500018573 · FORM-2A 2023.pdf · uploaded 20 Oct 2023Source
  • Disclosure of sold/ booked inventoryP50500018573 · DSBI_30-06-2023_compressed.pdf · uploaded 23 Oct 2023Source
  • Disclosure of sold/ booked inventoryP50500018573 · DSBI 05-10-2023_compressed.pdf · uploaded 23 Oct 2023Source
  • Disclosure of sold/ booked inventoryP50500018573 · DSBI 05-10-2023_compressed.pdf · uploaded 23 Oct 2023Source
  • Disclosure of sold/ booked inventoryP50500018573 · SOLD UNSOLD SC DATE 30-12-2023.pdf · uploaded 18 Jan 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P50500018573 · FORM-1 SC.pdf · uploaded 22 Jan 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P50500018573 · FORM-2 ENGINEER'S CERTIFICATE SC DATE 30-12-2023.pdf · uploaded 22 Jan 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P50500018573 · Form 1.pdf · uploaded 13 Apr 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P50500018573 · Form 2.pdf · uploaded 13 Apr 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P50500018573 · Form 2A.pdf · uploaded 6 May 2024Source
  • Disclosure of sold/ booked inventoryP50500018573 · DSBI.pdf · uploaded 8 May 2024Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P50500018573 · Form 5 Silver city 1.pdf · uploaded 17 May 2024Source
  • Declaration in FORM BP50500018573 · Affidavit_new.pdf · uploaded 8 Jul 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P50500018573 · Form 1 SC 1.pdf · uploaded 19 Jul 2024Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P50500018573 · Form 2 SC.pdf · uploaded 19 Jul 2024Source
  • Disclosure of sold/ booked inventoryP50500018573 · DSBI SC.pdf · uploaded 19 Jul 2024Source
  • Disclosure of sold/ booked inventoryP50500018573 · DSBI July-Sep2024.pdf · uploaded 14 Oct 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P50500018573 · Form 1 July-Sep 2024.pdf · uploaded 15 Oct 2024Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P50500018573 · Form 2 July-Sep 2024.pdf · uploaded 16 Oct 2024Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P50500018573 · FORM-5 silvercity 1.pdf · uploaded 19 Nov 2024Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P50500018573 · FORM-5 silvercity 1.pdf · uploaded 19 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P50500018573 · FORM-1.pdf · uploaded 14 Jan 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P50500018573 · FORM-2.pdf · uploaded 14 Jan 2025Source
  • Disclosure of sold/ booked inventoryP50500018573 · DSBI.pdf · uploaded 14 Jan 2025Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P50500018573 · Form 1 SC 1.pdf · uploaded 17 Apr 2025Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P50500018573 · Form 2 SC 1.pdf · uploaded 17 Apr 2025Source
  • Disclosure of sold/ booked inventoryP50500018573 · DSBI SC 1.pdf · uploaded 17 Apr 2025Source
  • Declaration in FORM BP50500018573 · FORM B SILVER CITY.pdf · uploaded 19 Apr 2025Source
  • Other – TechnicalP50500018573 · PERT Chart.pdf · uploaded 22 May 2025Source
  • Form 1P50500018573 · (Form 1) oct to dec 2023 silver cityyyyyyyy.pdf · uploaded 10 Oct 2025Source
  • Form 2P50500018573 · (Form 2) oct to dec 2023 silver city.pdf · uploaded 10 Oct 2025Source
  • Disclosure of Sold and Booked InventoryP50500018573 · dsbi oct to dec 2023 silver city.pdf · uploaded 10 Oct 2025Source
  • Form 1P50500018573 · (Form 1) jan to march 2024 silver city.pdf · uploaded 10 Oct 2025Source
  • Form 2P50500018573 · (Form 2) jan to march 2024 silver city.pdf · uploaded 10 Oct 2025Source
  • Disclosure of Sold and Booked InventoryP50500018573 · dsbi jan to march 2024 silver city.pdf · uploaded 10 Oct 2025Source
  • Form 1P50500018573 · (Form 1)april to june 2024 silver city.pdf · uploaded 10 Oct 2025Source
  • Form 2P50500018573 · (Form 2) april to june 2024 silver city.pdf · uploaded 10 Oct 2025Source
  • Disclosure of Sold and Booked InventoryP50500018573 · dsbi april to june 2024 silver city.pdf · uploaded 10 Oct 2025Source
  • Form 1P50500018573 · (Form 1) july to sept 2024 silver city.pdf · uploaded 10 Oct 2025View
  • Form 2P50500018573 · (Form 2) july to sept 2024 silver city.pdf · uploaded 10 Oct 2025View
  • Disclosure of Sold and Booked InventoryP50500018573 · dsbi july to sept 2024 silver city.pdf · uploaded 10 Oct 2025View
  • Form 1P50500018573 · (Form 1)oct to dec 2024 silver city.pdf · uploaded 10 Oct 2025View
  • Form 2P50500018573 · (Form 2) oct to dec 2024 silver city.pdf · uploaded 10 Oct 2025View
  • Disclosure of Sold and Booked InventoryP50500018573 · dsbi oct to dec 2024 silver city.pdf · uploaded 10 Oct 2025View
  • Form 1P50500018573 · (Form 1) jan to march 2025 silver city.pdf · uploaded 10 Oct 2025View
  • Form 2P50500018573 · (Form 2) jan to march 2025 silver city.pdf · uploaded 10 Oct 2025View
  • Disclosure of Sold and Booked InventoryP50500018573 · dsbi jan to march 2025 silver city.pdf · uploaded 10 Oct 2025View
  • Form 5 (FY 2024-2025)P50500018573 · FORM 5 CA CERTIFICATE SC 1 F Y 2024 2025 silver city.pdf · uploaded 8 Nov 2025Source
  • Form 2A (FY 2024-2025)P50500018573 · FORM 2 A SILVER CITY.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 1P50500018573 · FORM 1 ARCHITECTS CERTIFICATE SILVER CITY.pdf · uploaded 18 Dec 2025Source
  • Withdrawal Update Form 2P50500018573 · FORM 2 ENGINEERS CRETIFICATE SILVER CITY.pdf · uploaded 18 Dec 2025Source
  • Withdrawal Update Form 1P50500018573 · FORM 1 ARCHITECTS CERTIFICATE SILVER CITY.pdf · uploaded 18 Dec 2025Source
  • Withdrawal Update Form 2P50500018573 · FORM 2 ENGINEERS CRETIFICATE SILVER CITY.pdf · uploaded 18 Dec 2025Source
  • Withdrawal Update Form 1P50500018573 · FORM 1 ARCHITECT CERTIFICATE SILVER CITY.pdf · uploaded 17 Feb 2026Source
  • Withdrawal Update Form 2P50500018573 · FORM 2 ENGINEER CERTIFICATE SILVER CITY.pdf · uploaded 17 Feb 2026Source
  • Withdrawal Update Form 1P50500018573 · FORM 1 SILVER CITY.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2P50500018573 · FORM 2 SILVER CITY.pdf · uploaded 20 Apr 2026Source
  • Form 2A (FY 2025-2026)P50500018573 · FORM-2A SILVER CITY.pdf · uploaded 5 Jun 2026Source
  • Form 5 (FY 2025-2026)P50500018573 · FORM 5 CA CERTIFICATE SC 1 DATE 16 06 2026.pdf · uploaded 12 Jun 2026Source
  • Withdrawal Update Form 1P50500018573 · FORM 1 ARCHITECT CERTIFICATE SILVER CITY.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2P50500018573 · FORM 2 ENGINEER CERTIFICATE SILVER CITY.pdf · uploaded 20 Jul 2026Source

Technical documents

  • Layout ApprovalP50500018573 · Sc final map.pdfSource
  • NA Order for Plotted DevelopmentP50500018573 · Sc final map.pdfSource

Proforma allotment letter

  • Proforma allotment letterP50500018573 · sc allotment.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kothewada, Hingna taluka

Survey, CTS, gat or plot numbers

150 151/1 152153/1 161/1

As published on MahaRERA's project page

150 151/1 152

Boundaries

North
Kh No 149
South
Kh No 153
East
Nallah And Shivpandhan
West
Kh No 143 148 147 151 Part

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectUmesh Lamge—P50500018573
ArchitectUmesh Moreshwar Lamge—P50500018573
ArchitectUmesh Moreshwar Lamge—P50500018573
ArchitectUmesh Moreshwar Lamge—P50500018573
ArchitectUmesh Moreshwar Lamge—P50500018573
ArchitectUmesh Moreshwar Lamge—P50500018573
ArchitectUmesh Moreshwar Lamge—P50500018573
ArchitectUmesh Moreshwar Lamge—P50500018573
Chartered accountantKND & Associates—P50500018573
Chartered accountantMJM Associates—P50500018573
Chartered accountantMJM Associates—P50500018573
Chartered accountantMJM Associates—P50500018573
Chartered accountantPatal Taori—P50500018573
Chartered accountantSaloni Bang—P50500018573
Chartered accountantSonam Thakur—P50500018573
EngineerMahesh Ashokaro Balpande—P50500018573
EngineerMahesh Ashokrao Balpande—P50500018573
EngineerMahesh Ashokrao Balpande—P50500018573
EngineerMahesh Ashokrao Balpande—P50500018573
EngineerMahesh Ashokrao Balpande—P50500018573
EngineerMahesh Ashokrao Balpande—P50500018573
EngineerMahesh Balpande—P50500018573
EngineerMahesh Balpande—P50500018573
EngineerMayur Karingwar—P50500018573

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology