Vrindavan Park

Completed

Khadka, Nagpur 441122 |Promoter: Tirupati Developers

12 Nov 2018Registered with MahaRERAFirst of 2 registrations
31 Jan 2029Promised completionLatest across registrations
2Buildings2 phases
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Completed
RERA registrations
2
Phases
2
Buildings
2
Land area for this project
63,242 sq m (6,80,734 sq ft)
Permissible built-up area
0 sq m (0 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
12,164 sq m (1,30,932 sq ft)
Address
45/1 47/1 48 (Part), Gumgaon Road, KhadkaPIN 441122
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Vrindavan Park is at latitude 0.00000, longitude 0.00000.

Also registered as

Vrindavan Park - 4

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

P50500018534

The latest completion date on record passed 3 years and 10 months ago.

Registered
12 Nov 2018
Promised
30 Dec 2022

Completion promised for 31 Jan 2029

P50500079234
Registered
18 Feb 2025
Promised
31 Jan 2029

2 RERA registrations

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001853412 Nov 201830 Dec 2022—Tirupati DevelopersProject page
P5050007923418 Feb 202531 Jan 2029—Tirupati DevelopersProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building (P50500018534)——
Building (P50500079234)——

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
Show all 22 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsCOMPLETED100%
  • Water SupplyCOMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)COMPLETED100%
  • Storm Water DrainsCOMPLETED100%
  • Landscaping & Tree PlantingCOMPLETED100%
  • Street LightingCOMPLETED100%
Show all 30 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterCOMPLETED100%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationCOMPLETED100%
  • Aggregate area of recreational Open SpaceCOMPLETED100%
  • Open ParkingNot applicable
  • Internal Roads & FootpathsAs per NMRDA100%
  • Water SupplyAs per NMRDA100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per NMRDA100%
  • Storm Water DrainsAs per NMRDA100%
  • Landscaping & Tree PlantingAs per NMRDA100%
  • Street LightingAs per NMRDA100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAs per NMRDA100%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAs per NMRDA100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAs per NMRDA100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

59 documents held by Deedo, 117 filings listed on MahaRERA's project page

Form B (2)

Title report (3)

Registration certificate (2)

  • Registration certificateP50500018534 · 9 Sep 2021ViewSource
  • Registration certificateP50500079234 · 18 Feb 2025ViewSource

Other (26)

Show all 176 documentsShow fewer documents

Other (26)

Encumbrance details (2)

  • Encumbrance detailsP50500079234 · 23 Jan 2025ViewSource
  • Encumbrance detailsP50500079234 · 23 Jan 2025ViewSource

Form 1 (5)

Form 2 (5)

Commencement certificate (3)

  • Commencement certificateP50500079234 · 23 Jan 2025ViewSource
  • Commencement certificateP50500079234 · 23 Jan 2025ViewSource
  • Commencement certificateP50500079234 · 3 Feb 2025ViewSource

Allotment letter (3)

  • Allotment letterP50500079234 · 23 Jan 2025ViewSource
  • Allotment letterP50500018534 · Date not statedViewSource
  • Allotment letterP50500079234 · Date not statedViewSource

Form 2A

Form 5

Occupancy / completion certificate (3)

  • Occupancy / completion certificateP50500079234 · 27 Apr 2026ViewSource
  • Occupancy / completion certificateP50500079234 · 27 Apr 2026ViewSource
  • Occupancy / completion certificateP50500079234 · 27 Apr 2026ViewSource

Layout plan

Building plan (2)

  • Building planP50500079234 · Date not statedViewSource
  • Building planP50500079234 · Date not statedViewSource

Document library

  • Declaration in FORM BP50500018534 · affidavit tirupati.pdf · uploaded 15 Oct 2018View
  • Details of encumbrancesP50500018534 · vp advocate certificate.pdf · uploaded 15 Oct 2018Source
  • Commencement Certificates / NA Order for plotted developmentP50500018534 · commencement vp.pdf · uploaded 15 Oct 2018Source
  • Building Plan Approval (IOD)P50500018534 · vp final map_1.pdf · uploaded 15 Oct 2018Source
  • Proforma of Allotment letterP50500018534 · allotment vp.pdf · uploaded 15 Oct 2018Source
  • Proforma of Allotment letterP50500018534 · vp agreement.pdf · uploaded 15 Oct 2018Source
  • Copy of Layout Approval (in case of layout)P50500018534 · vp final map_1.pdf · uploaded 15 Oct 2018Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P50500018534 · vp engineer certificate.pdf · uploaded 15 Oct 2018Source
  • Copy of the legal title reportP50500018534 · search reports vp.pdf · uploaded 20 Oct 2018View
  • Disclosure of sold/ booked inventoryP50500018534 · VRINDAVAN PARK-1(SOLD UNSOLD)-1.pdf · uploaded 30 Apr 2022Source
  • Disclosure of sold/ booked inventoryP50500018534 · VRINDAVAN PARK-1 (SOLD UNSOLD)-2.pdf · uploaded 30 Apr 2022Source
  • Disclosure of sold/ booked inventoryP50500018534 · VRINDAVAN PARK-1 (SOLD UNSOLD)-3.pdf · uploaded 30 Apr 2022Source
  • Disclosure of sold/ booked inventoryP50500018534 · VRINDAVAN PARK-1 (SOLD UNSOLD)-4.pdf · uploaded 30 Apr 2022Source
  • Disclosure of sold/ booked inventoryP50500018534 · VRINDAVAN PARK-1 (SOLD UNSOLD)-5.pdf · uploaded 30 Apr 2022Source
  • Disclosure of sold/ booked inventoryP50500018534 · VRINDAVAN PARK-1 (SOLD UNSOLD)-6.pdf · uploaded 30 Apr 2022View
  • Disclosure of sold/ booked inventoryP50500018534 · VRINDAVAN PARK-1 (SOLD UNSOLD)-7.pdf · uploaded 30 Apr 2022View
  • Disclosure of sold/ booked inventoryP50500018534 · VRINDAVAN PARK-1 (SOLD UNSOLD)-8.pdf · uploaded 30 Apr 2022Source
  • Disclosure of sold/ booked inventoryP50500018534 · VRINDAVAN PARK-1 (SOLD UNSOLD)-9.pdf · uploaded 30 Apr 2022Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500018534 · Architech Certificate VP_1.pdf · uploaded 4 May 2022Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P50500018534 · QUALITY ASSURANCE CERTIFICATE (VP).pdf · uploaded 6 May 2022Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P50500018534 · QUALITY ASSURANCE CERTIFICATE (VP).pdf · uploaded 16 May 2022Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)P50500018534 · VRINDAVAN PARK -1 2017-2018)-1-2.pdf · uploaded 16 May 2022Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)P50500018534 · VRINDAVAN PARK -1 2017-2018)-3.pdf · uploaded 16 May 2022Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P50500018534 · VRINDAVAN PARK -1 (2018-2019)-1-2.pdf · uploaded 16 May 2022Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P50500018534 · VRINDAVAN PARK -1 (2018-2019)-3.pdf · uploaded 16 May 2022Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P50500018534 · VRINDAVAN PARK -1 (2019-2020)-1-2.pdf · uploaded 16 May 2022Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P50500018534 · VRINDAVAN PARK -1 (2019-2020)-3.pdf · uploaded 16 May 2022Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P50500018534 · VRINDAVAN PARK -1 (2020-2021)-1-2.pdf · uploaded 16 May 2022Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P50500018534 · VRINDAVAN PARK -1 (2020-2021)-3.pdf · uploaded 16 May 2022Source
  • Declaration about Commencement CertificateP50500018534 · Vrindavan park.pdf · uploaded 25 May 2022Source
  • Deviation Report with respect to Allotment letterP50500018534 · VP Deviation for Allotment Letter.pdf · uploaded 27 Jul 2022View
  • Deviation Report with respect to model copy of AgreementP50500018534 · VP Deviation for Agreement to Sale.pdf · uploaded 27 Jul 2022View
  • b Details of encumbrances concerned to LegalP50500018534 · VP Encumbrance for Legal.pdf · uploaded 27 Jul 2022Source
  • Status of Formation of Legal Entity (Society/Co Op etc.)P50500018534 · plot owners VP1.pdf · uploaded 29 Dec 2022Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP50500018534 · Architec's Certificate VP-1.pdf · uploaded 29 Dec 2022Source
  • Architect’s Certificate on Completion of Project (Form 4)P50500018534 · Architec's Certificate VP-1.pdf · uploaded 29 Dec 2022Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500018534 · ARCHITECH CERTIFICATE VP-1 10-02-23.pdf · uploaded 10 Feb 2023Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P50500018534 · Vrindavan Park fORM 5(2021-2022)-1-2 update.pdf · uploaded 27 Mar 2023Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P50500018534 · Vrindavan Park fORM 5(2021-2022)-3 update.pdf · uploaded 27 Mar 2023Source
  • Disclosure of Interest in Other Real Estate OrganizationsP50500018534 · Disclosure of interest in other Real Estate Organization (Prashant Bongirwar).pdf · uploaded 27 Mar 2023Source
  • Disclosure of Interest in Other Real Estate OrganizationsP50500018534 · Disclosure of interest in other Real Estate Organization (Rahul Upganlawar).pdf · uploaded 27 Mar 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500018534 · FORM-1 VP.pdf · uploaded 9 Nov 2023Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P50500018534 · FORM-2 VP.pdf · uploaded 9 Nov 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P50500018534 · FORM-2A VP 2022.pdf · uploaded 9 Nov 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P50500018534 · FORM-2A VP-2023.pdf · uploaded 9 Nov 2023Source
  • Disclosure of sold/ booked inventoryP50500018534 · SOLD UNSOLD VP.pdf · uploaded 9 Nov 2023Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P50500018534 · FORM-2 10-10-2023.pdf · uploaded 24 Nov 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP50500018534 · COMPLITION LETTER VP1 19-04-2023.pdf · uploaded 24 Nov 2023Source
  • Architect’s Certificate on Completion of Project (Form 4)P50500018534 · FORM-4 ARCHITECT CERTIFICATE 12-10-2023.pdf · uploaded 24 Nov 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP50500018534 · COMPLITION MAP VP-1 19-4-23_Part 1.pdf · uploaded 24 Nov 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP50500018534 · COMPLITION MAP VP-1 19-4-23_part 2.pdf · uploaded 24 Nov 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP50500018534 · COMPLITION MAP VP-1 19-4-23_part 3.pdf · uploaded 24 Nov 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP50500018534 · COMPLITION MAP VP-1 19-4-23_Part 4.pdf · uploaded 24 Nov 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP50500018534 · COMPLITION MAP VP-1 19-4-23 _part 5.pdf · uploaded 24 Nov 2023Source
  • Copy of the legal title reportP50500079234 · Title Report.pdf · uploaded 23 Jan 2025View
  • Copy of the legal title reportP50500079234 · Search Report_compressed.pdf · uploaded 23 Jan 2025View
  • a Details of encumbrances concerned to FinanceP50500079234 · Nil Financial Encumberance.pdf · uploaded 23 Jan 2025View
  • b Details of encumbrances concerned to LegalP50500079234 · Nil Financial Encumberance.pdf · uploaded 23 Jan 2025View
  • a Details of encumbrances concerned to FinanceP50500079234 · Nil legal Encumberance.pdf · uploaded 23 Jan 2025View
  • b Details of encumbrances concerned to LegalP50500079234 · Nil legal Encumberance.pdf · uploaded 23 Jan 2025View
  • Copy of Layout Approval (in case of layout)P50500079234 · Layout_compressed.pdf · uploaded 23 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentP50500079234 · Layout_compressed.pdf · uploaded 23 Jan 2025View
  • Commencement Certificates / NA Order for plotted developmentP50500079234 · NA Order.pdf · uploaded 23 Jan 2025View
  • Declaration about Commencement CertificateP50500079234 · Declaration about CC.pdf · uploaded 23 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500079234 · FORM 1.pdf · uploaded 23 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500079234 · FORM 2.pdf · uploaded 23 Jan 2025View
  • CERSAI detailsP50500079234 · Undertaking CERSAI.pdf · uploaded 23 Jan 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsP50500079234 · Anne Rahul_compressed.pdf · uploaded 23 Jan 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsP50500079234 · Anne Prashant_compressed.pdf · uploaded 23 Jan 2025View
  • Deviation Report with respect to Allotment letterP50500079234 · No Deviation AL.pdf · uploaded 23 Jan 2025View
  • Deviation Report with respect to model copy of AgreementP50500079234 · No Deviation AFS.pdf · uploaded 23 Jan 2025View
  • Other – TechnicalP50500079234 · No Double Registration.pdf · uploaded 23 Jan 2025View
  • Other – LegalP50500079234 · Sale Deed.pdf · uploaded 23 Jan 2025View
  • Other – LegalP50500079234 · Ownership Declaration.pdf · uploaded 23 Jan 2025View
  • Other – LegalP50500079234 · 7-12 Abstract_ SUKLI KH NO 30.pdf · uploaded 23 Jan 2025View
  • Proforma of Allotment letterP50500079234 · Allotment Letter_compressed.pdf · uploaded 23 Jan 2025View
  • Proforma of Agreement for saleP50500079234 · AFS.pdf · uploaded 23 Jan 2025View
  • Disclosure for secured/unsecured finance availed for the projectP50500079234 · DISCLOSURE FOR SECURED.pdf · uploaded 28 Jan 2025View
  • Declaration about all RERA Designated Bank Accounts (Format A)P50500079234 · Bank Declaration Format A.pdf · uploaded 28 Jan 2025View
  • Declaration in FORM BP50500079234 · Declaration Form B_compressed.pdf · uploaded 29 Jan 2025View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P50500079234 · FORMAT B Bank Declaration.pdf · uploaded 31 Jan 2025View
  • Commencement Certificates / NA Order for plotted developmentP50500079234 · NA COVERING LETTER.pdf · uploaded 3 Feb 2025View
  • Commencement Certificates / NA Order for plotted developmentP50500079234 · Declaration about CC.pdf · uploaded 3 Feb 2025View
  • Building Plan Approval / NA Order for plotted developmentP50500079234 · CC Verification pdf.pdf · uploaded 7 Feb 2025View
  • Building Plan Approval / NA Order for plotted developmentP50500079234 · Letter for RERA.pdf · uploaded 12 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500079234 · Form 1 VP 4 Jan-Mar 25.pdf · uploaded 18 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500079234 · Form 2 VP 4 Jan-MAr 25.pdf · uploaded 18 Apr 2025View
  • Disclosure of sold/ booked inventoryP50500079234 · DSBI VP 4 Jan-Mar 25.pdf · uploaded 18 Apr 2025View
  • Withdrawal Update Form 1P50500079234 · FORM 1 ARCHITECTu0027S CERTIFICATE VRINDAVAN PARK 4.pdf · uploaded 20 Sep 2025View
  • Withdrawal Update Form 2P50500079234 · FORM 2 ENGINEERu0027S CERTIFICATE VRINDAVAN PARK 4.pdf · uploaded 20 Sep 2025View
  • Form 2A (FY 2024-2025)P50500079234 · FORM-2 A VIRNDAVAN PARK-4.pdf · uploaded 8 Nov 2025View
  • Form 5 (FY 2024-2025)P50500079234 · FORM 5 CA CERTIFICATE VP 4 F Y 2024 2025.pdf · uploaded 8 Nov 2025View
  • Withdrawal Update Form 1P50500079234 · FORM 1 ARCHITECTu0027S CERTIFICATE VRINDAVAN PARK 4.pdf · uploaded 18 Nov 2025View
  • Withdrawal Update Form 2P50500079234 · FORM 2 ENGINEERu0027S CERTIFICATE VRINDAVAN PARK 4.pdf · uploaded 18 Nov 2025View
  • Withdrawal Update Form 1P50500079234 · FORM 1 ARCHITECT CERTIFICATE VRINDAVAN PARK 4.pdf · uploaded 16 Jan 2026View
  • Withdrawal Update Form 2P50500079234 · FORM 2 ENGINEER CERTIFICATE VRINDAVAN PARK 4.pdf · uploaded 16 Jan 2026View
  • Withdrawal Update Form 1P50500079234 · FORM 1 VRINDAVAN PARK 4.pdf · uploaded 16 Apr 2026View
  • Withdrawal Update Form 2P50500079234 · FORM 2 VRINDAVAN PARK 4.pdf · uploaded 16 Apr 2026View
  • Completion CertificateP50500079234 · Sukli kh no 30 completion certificate.pdf · uploaded 27 Apr 2026View
  • Completion CertificateP50500079234 · VP 4 CC VERIFICATION COMPLETION 22 04 2026.pdf · uploaded 27 Apr 2026View
  • Completion CertificateP50500079234 · FORM 4 ARCHITECT CERTIFICATE VRINDAVAN PARK 4.pdf · uploaded 27 Apr 2026View

Promoter documents

  • Declaration Form BP50500018534 · affidavit tirupati.pdf · uploaded 15 Oct 2018View
  • Legal Title reportP50500018534 · search reports vp.pdf · uploaded 20 Oct 2018View
  • Legal Title reportP50500079234 · Title Report.pdf · uploaded 23 Jan 2025View
  • Legal Title reportP50500079234 · Search Report_compressed.pdf · uploaded 23 Jan 2025View
  • Declaration Form BP50500079234 · Declaration Form B_compressed.pdf · uploaded 29 Jan 2025View

Technical documents

  • NA Order for Plotted DevelopmentP50500018534 · vp final map_1.pdfSource
  • Layout ApprovalP50500018534 · vp final map_1.pdfSource
  • Layout ApprovalP50500079234 · Layout_compressed.pdfView
  • NA Order for Plotted DevelopmentP50500079234 · Layout_compressed.pdfView
  • NA Order for Plotted DevelopmentP50500079234 · CC Verification pdf.pdfView
  • NA Order for Plotted DevelopmentP50500079234 · Letter for RERA.pdfView

Other legal documents

  • Other – LegalP50500079234 · Sale Deed.pdfView
  • Other – LegalP50500079234 · Ownership Declaration.pdfView
  • Other – LegalP50500079234 · 7-12 Abstract_ SUKLI KH NO 30.pdfView

Proforma allotment letter

  • Proforma allotment letterP50500018534 · VP Deviation for Allotment Letter.pdfView
  • Proforma allotment letterP50500079234 · Allotment Letter_compressed.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Khadka, Hingna taluka

Survey, CTS, gat or plot numbers

30 PART45/1 47/1 48 (PART)

As published on MahaRERA's project page

45/1 47/1 48 (PART)

Boundaries

North
Kh No 43 And 44
South
Adjacent Kh No 47
East
Pandhan Road
West
Balance Part Of Kh No 48 And Adjacent Kh No 45

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectUmesh Lamge—P50500079234
ArchitectUmesh Moreshwar Lamge—P50500018534
Chartered accountantKND & Associates—P50500018534
Chartered accountantKND Associates—P50500079234
Chartered accountantMJM Associates—P50500018534
Chartered accountantMJM Associates—P50500079234
Chartered accountantPatal Taori—P50500018534
Chartered accountantSaloni Bang—P50500079234
Show all 23 professionalsShow fewer professionals
RoleNameRegistration no.RERA
Chartered accountantSharma N CO—P50500079234
Chartered accountantSonam Thakur—P50500079234
Chartered accountantSumit Kishore Agrawal—P50500018534
EngineerMahesh Ashokrao Balpande—P50500018534
EngineerMahesh Balpande—P50500079234
EngineerMayur Karingwar—P50500079234
Real Estate AgentAbhilash Suresh Ratnaparkhi—P50500018534
Real Estate AgentManish Group—P50500018534
Real Estate AgentNeel Infratech—P50500018534
OtherSanjay Kisanrao Basunde—P50500018534
Real Estate AgentShree Shakti Realtors & Infra—P50500018534
Registered real estate agentAbhilashsuresh RatnaparkhiA50500031455P50500018534
Registered real estate agentManish GroupA50500007742P50500018534
Registered real estate agentNeel InfratechA50500005411P50500018534
Registered real estate agentShree Shakti Realtors & InfraA50500009182P50500018534

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology