Gawasi Manapur, Nagpur 441108 |Promoter: Pyramid Ventures India Pvt Ltd

Residential / Group HousingRERAP50500003311
5 Aug 2017Registered with MahaRERA
31 Dec 2017Promised completion
6Buildings
146Units registered
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
6
Unit types
3 BHK, 2 BHK146 units in all
Land area for this project
16,100 sq m (1,73,299 sq ft)
Permissible built-up area
14,014 sq m (1,50,845 sq ft)
Sanctioned built-up area
14,014 sq m (1,50,845 sq ft)
Recreational open space
3,599 sq m (38,739 sq ft)
Address
39/2PIN 441108
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.02027, 79.04914
Pyramid City 2 is at latitude 21.02027, longitude 79.04914.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2017

The latest completion date on record passed 8 years and 10 months ago.

Registered
5 Aug 2017
Promised
31 Dec 2017

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000033115 Aug 201731 Dec 2017—Pyramid Ventures India Pvt LtdProject page

6 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Tower-A928
Tower-B928
Tower-C823
Tower-D822
Tower-E822
Tower-F823

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

146 units registered

3 BHK · 57 units2 BHK · 89 units
BuildingTypeCarpet areaUnits
Tower-A3 BHK89.57 sq m · 964 sq ft28
Tower-B3 BHK89.57 sq m · 964 sq ft28
Tower-C2 BHK71.09 sq m · 765 sq ft5
Tower-C2 BHK71.23 sq m · 767 sq ft11
Tower-C2 BHK71.97 sq m · 775 sq ft2
Tower-C2 BHK72.38 sq m · 779 sq ft1
Tower-C2 BHK72.84 sq m · 784 sq ft1
Tower-C2 BHK72.98 sq m · 786 sq ft2
Tower-C3 BHK90.53 sq m · 974 sq ft1
Tower-D2 BHK71.08 sq m · 765 sq ft1
Tower-D2 BHK71.09 sq m · 765 sq ft12
Tower-D2 BHK71.23 sq m · 767 sq ft1
Tower-D2 BHK71.26 sq m · 767 sq ft4
Tower-D2 BHK72.38 sq m · 779 sq ft2
Tower-D2 BHK72.48 sq m · 780 sq ft1
Tower-D2 BHK72.99 sq m · 786 sq ft1
Tower-E2 BHK71.08 sq m · 765 sq ft1
Tower-E2 BHK71.09 sq m · 765 sq ft12
Tower-E2 BHK71.23 sq m · 767 sq ft1
Tower-E2 BHK71.26 sq m · 767 sq ft4
Tower-E2 BHK72.38 sq m · 779 sq ft2
Tower-E2 BHK72.48 sq m · 780 sq ft1
Tower-E2 BHK72.99 sq m · 786 sq ft1
Tower-F2 BHK71.09 sq m · 765 sq ft5
Tower-F2 BHK71.23 sq m · 767 sq ft11
Tower-F2 BHK71.97 sq m · 775 sq ft2
Tower-F2 BHK72.38 sq m · 779 sq ft1
Tower-F2 BHK72.84 sq m · 784 sq ft1
Tower-F2 BHK72.98 sq m · 786 sq ft2
Tower-F2 BHK90.53 sq m · 974 sq ft1

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Tower-AClosed/Covered000020
Tower-AOpen Space000018
Tower-BClosed/Covered000020
Tower-BOpen Space00008
Tower-CClosed/Covered000019
Tower-COpen Space00004
Tower-DClosed/Covered000015
Tower-DOpen Space00007
Tower-EClosed/Covered000015
Tower-EOpen Space00007
Tower-FClosed/Covered000019
Tower-FOpen Space00004

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Tower-A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Tower-B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Tower-C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Tower-D

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Tower-E

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Tower-F

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsR.C.C100%
  • Water SupplyHDPE100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Pythorid STP100%
  • Storm Water DrainsEco Drain Pipe100%
  • Landscaping & Tree PlantingAs Per Drawing100%
  • Street LightingAS Per Drawing100%
  • Community BuildingsAs Per Drawing100%
  • Treatment And Disposal Of Sewage And Sullage WaterAs Per Drawing100%
  • Solid Waste Management And DisposalAs Per Drawing100%
  • Water conservation /Rain water harvestingAs per Drawing100%
  • Energy managemcntAs Per Drawing100%
  • Fire protection and fire safety requirementsAs Per Drawing100%
  • Electrical meter room, sub-station, receiving stationAs Per Drawing100%
  • Aggregate area of recreational Open SpaceAs Per Drawing100%
  • Open ParkingAs Per Drawing100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

43 documents held by Deedo, 74 filings listed on MahaRERA's project page

Title

Form b

Form 1

Form 2

Registration certificate

Commencement certificates

Completions

Form 5

Others

Building plans

Allotment letter

Layout plan

Document library

  • Copy of Layout Approval (in case of layout)Layout plan city2.PDF · uploaded 27 Jul 2017View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 27 Jul 2017View
  • Copy of the legal title reportPyramid City-II Title Search-ilovepdf-compressed.pdf · uploaded 27 Jul 2017View
  • Details of encumbrancesEncumbrances Certificate.PDF · uploaded 29 Jul 2017Source
  • Declaration in FORM BForm B City 2.PDF · uploaded 29 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer certificate.PDF · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)1.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)2.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)3.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)4.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)5.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)6.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)7.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)8.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)9.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)10.pdf · uploaded 29 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate.PDF · uploaded 29 Jul 2017View
  • OtherForm No 4.PDF · uploaded 29 Oct 2020View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate_11zon.pdf · uploaded 13 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentArchitect completion Certificate.pdf · uploaded 13 Aug 2021View
  • OtherRevised Building plan Demand Note.pdf · uploaded 13 Aug 2021View
  • OtherDemand paid Slip.pdf · uploaded 13 Aug 2021View
  • OtherLetter.pdf · uploaded 13 Aug 2021View
  • Building Plan Approval (IOD)scan456.pdf · uploaded 27 Jan 2023View
  • Building Plan Approval (IOD)scan457.pdf · uploaded 27 Jan 2023View
  • Building Plan Approval (IOD)scan458.pdf · uploaded 27 Jan 2023View
  • Building Plan Approval (IOD)scan459.pdf · uploaded 27 Jan 2023View
  • Building Plan Approval (IOD)scan460.pdf · uploaded 27 Jan 2023View
  • Building Plan Approval (IOD)scan461.pdf · uploaded 27 Jan 2023View
  • Building Plan Approval (IOD)scan462.pdf · uploaded 27 Jan 2023View
  • Building Plan Approval (IOD)scan463.pdf · uploaded 27 Jan 2023View
  • Building Plan Approval (IOD)scan464.pdf · uploaded 27 Jan 2023View
  • Building Plan Approval (IOD)scan465.pdf · uploaded 27 Jan 2023View
  • Building Plan Approval (IOD)scan466.pdf · uploaded 27 Jan 2023View
  • Building Plan Approval (IOD)Club House.pdf · uploaded 27 Jan 2023View
  • Commencement Certificates / NA Order for plotted developmentPermit.pdf · uploaded 27 Jan 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate.pdf · uploaded 27 Jan 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate.pdf · uploaded 27 Jan 2023View
  • OtherRelease Letter.pdf · uploaded 28 Jan 2023View
  • OtherForm 4 (UT).pdf · uploaded 28 Jan 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form No 5.pdf · uploaded 31 May 2023View
  • Foreclosure of the ProjectLetter issued for the formation of society to costumer as per DOD.PDF · uploaded 31 May 2023View

Promoter documents

  • Legal Title reportPyramid City-II Title Search-ilovepdf-compressed.pdf · uploaded 27 Jul 2017View
  • Declaration Form BForm B City 2.PDF · uploaded 29 Jul 2017View

Technical documents

  • Layout ApprovalLayout plan city2.PDFView
  • Building Plan Approval2.pdfView
  • Building Plan Approval3.pdfView
  • Building Plan Approval4.pdfView
  • Building Plan Approval5.pdfView
  • Building Plan Approval6.pdfView
  • Building Plan Approval7.pdfView
  • Building Plan Approval1.pdfView
  • Building Plan Approval8.pdfView
  • Building Plan Approval9.pdfView
  • Building Plan Approval10.pdfView
  • Building Plan Approvalscan456.pdfView
  • Building Plan Approvalscan457.pdfView
  • Building Plan Approvalscan458.pdfView
  • Building Plan Approvalscan459.pdfView
  • Building Plan Approvalscan460.pdfView
  • Building Plan Approvalscan461.pdfView
  • Building Plan Approvalscan462.pdfView
  • Building Plan Approvalscan463.pdfView
  • Building Plan Approvalscan464.pdfView
  • Building Plan Approvalscan465.pdfView
  • Building Plan Approvalscan466.pdfView
  • Building Plan ApprovalClub House.pdfView

Other legal documents

  • OtherForm No 4.PDFView
  • OtherRevised Building plan Demand Note.pdfView
  • OtherDemand paid Slip.pdfView
  • OtherLetter.pdfView
  • OtherRelease Letter.pdfView
  • OtherForm 4 (UT).pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Gawasi Manapur, Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

39/2

As published on MahaRERA's project page

39/2

Boundaries

North
Existing Road
South
Boundary of Sahara City
East
Open Land
West
Open Land

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSanjay Soni—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology