Tara Commercial Complex

Active

Butibori, Nagpur 441122 |Promoter: Maa Vaishnavi Infra

3 Mar 2025Registered with MahaRERA
31 Dec 2034Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Active
Buildings
1
Land area for this project
1,350 sq m (14,531 sq ft)
Permissible built-up area
7,290 sq m (78,469 sq ft)
Sanctioned built-up area
4,289 sq m (46,166 sq ft)
Recreational open space
0 sq m (0 sq ft)
Planning authority
MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION
Address
Plot No. X-274, X-275, Butibori Industrial Area, Midc Butibori, Mouza-RengapurPIN 441122
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Tara Commercial Complex is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2034

Registered
3 Mar 2025
Promised
31 Dec 2034

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000793723 Mar 202531 Dec 2034—Maa Vaishnavi InfraProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Tara Commercial Complex8—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered0400040
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Tara Commercial Complex

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor74%
  • Slabs of Super Structure40%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises28%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks22%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER SANCTIONED PLAN25%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER SANCTIONED PLAN0%
  • Storm Water DrainsAS PER SANCTIONED PLAN0%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER SANCTIONED PLAN8%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAS PER SANCTIONED PLAN0%
  • Electrical meter room, sub-station, receiving stationAS PER SANCTIONED PLAN24%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

30 documents held by Deedo, 74 filings listed on MahaRERA's project page

Title

Form b

Allotment letters

Others

Encumbrances

Commencement certificates

Building plans

Registration certificate

Form 1

Form 2

Document library

  • Copy of the legal title reportltr.pdf · uploaded 23 Dec 2024View
  • a Details of encumbrances concerned to FinanceENCUM_LEGAL.pdf · uploaded 23 Dec 2024View
  • a Details of encumbrances concerned to FinanceENCUM_FIN.pdf · uploaded 23 Dec 2024View
  • b Details of encumbrances concerned to LegalENCUM_LEGAL.pdf · uploaded 23 Dec 2024View
  • b Details of encumbrances concerned to LegalENCUM_FIN.pdf · uploaded 23 Dec 2024View
  • Copy of Layout Approval (in case of layout)plan.pdf · uploaded 23 Dec 2024View
  • Building Plan Approval / NA Order for plotted developmentplan.pdf · uploaded 23 Dec 2024View
  • Commencement Certificates / NA Order for plotted developmentpermit.pdf · uploaded 23 Dec 2024View
  • Declaration about Commencement CertificateFORM D.pdf · uploaded 23 Dec 2024View
  • Declaration in FORM BFORM-B_promoter-Tara_compressed.pdf · uploaded 23 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 23 Dec 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2_ENGINEER-CERTIFICATE_compressed.pdf · uploaded 23 Dec 2024View
  • CERSAI detailsCERSAI.pdf · uploaded 23 Dec 2024View
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 23 Dec 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsINTT DEC NIKUNJ JARIWALA.pdf · uploaded 23 Dec 2024View
  • Disclosure for secured/unsecured finance availed for the projectSECURED_UNSECURED.pdf · uploaded 23 Dec 2024View
  • Declaration about all RERA Designated Bank Accounts (Format A)FORMAT A.pdf · uploaded 23 Dec 2024View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)OPENING-RERA-DESIGNATED-BANK-ACCOUNT-SBI.pdf · uploaded 23 Dec 2024View
  • Deviation Report with respect to Allotment letterDEV-ALLOTMENT.pdf · uploaded 23 Dec 2024View
  • Deviation Report with respect to model copy of AgreementDEV-ATS.pdf · uploaded 23 Dec 2024View
  • Proforma of Agreement for saleats.pdf · uploaded 23 Dec 2024View
  • Other – LegalDOA-X-274_X-275_MAA-VAISHNAVI-INFRA_1-13.pdf · uploaded 23 Dec 2024View
  • Other – LegalDOA-X-274_X-275_MAA-VAISHNAVI-INFRA_14-27.pdf · uploaded 23 Dec 2024View
  • Other – FinanceDOA-X-274_X-275_MAA-VAISHNAVI-INFRA_1-13.pdf · uploaded 23 Dec 2024View
  • Other – FinanceDOA-X-274_X-275_MAA-VAISHNAVI-INFRA_14-27.pdf · uploaded 23 Dec 2024View
  • Other – TechnicalDOA-X-274_X-275_MAA-VAISHNAVI-INFRA_1-13.pdf · uploaded 23 Dec 2024View
  • Other – TechnicalDOA-X-274_X-275_MAA-VAISHNAVI-INFRA_14-27.pdf · uploaded 23 Dec 2024View
  • Other – LegalMIDC-TRANSFER-ORDER_.pdf · uploaded 23 Dec 2024View
  • Other – FinanceMIDC-TRANSFER-ORDER_.pdf · uploaded 23 Dec 2024View
  • Other – TechnicalMIDC-TRANSFER-ORDER_.pdf · uploaded 23 Dec 2024View
  • Other – Technicalqa.pdf · uploaded 23 Dec 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsINTT DEC MAHENDRA GULHANE.pdf · uploaded 23 Dec 2024View
  • Other – TechnicalFIRM_PARTNERSHIP-DEED-(NOTARY)_MAA-VAISHNAVI-INFRA_compressed.pdf · uploaded 23 Dec 2024View
  • Other – LegalFIRM_PARTNERSHIP-DEED-(NOTARY)_MAA-VAISHNAVI-INFRA_compressed.pdf · uploaded 23 Dec 2024View
  • Other – FinanceFIRM_PARTNERSHIP-DEED-(NOTARY)_MAA-VAISHNAVI-INFRA_compressed.pdf · uploaded 23 Dec 2024View
  • Other – TechnicalDECLARATION TARA.pdf · uploaded 30 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentDECLARATION TARA.pdf · uploaded 30 Jan 2025View
  • Other – TechnicalGmail - Regarding commencement certificate of Plot No X-274 X-275 forward to MAHARERA.pdf · uploaded 30 Jan 2025View
  • Building Plan Approval / NA Order for plotted development7 Other – Technical.pdf · uploaded 17 Feb 2025View
  • Building Plan Approval / NA Order for plotted developmentplan.pdf · uploaded 17 Feb 2025View
  • Building Plan Approval / NA Order for plotted developmentForm B _Tara Commercial Complex.pdf · uploaded 28 Feb 2025View
  • Other – FinanceForm B _Tara Commercial Complex.pdf · uploaded 28 Feb 2025View
  • Other – TechnicalForm B _Tara Commercial Complex.pdf · uploaded 28 Feb 2025View
  • Other – TechnicalQuery Received.pdf · uploaded 28 Feb 2025View
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 24 Jan 2026View
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 24 Jan 2026View
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 24 Jan 2026View
  • Withdrawal Update Form 2FORM-2_ENGINEER-CERTIFICATE_compressed.pdf · uploaded 24 Jan 2026View
  • Withdrawal Update Form 2FORM-2_ENGINEER-CERTIFICATE_compressed.pdf · uploaded 24 Jan 2026View
  • Withdrawal Update Form 2FORM-2_ENGINEER-CERTIFICATE_compressed.pdf · uploaded 24 Jan 2026View
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 24 Jan 2026View
  • Withdrawal Update Form 2FORM-2_ENGINEER-CERTIFICATE_compressed.pdf · uploaded 24 Jan 2026View
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 19 Apr 2026View
  • Withdrawal Update Form 2FORM-2_ENGINEER-CERTIFICATE_compressed.pdf · uploaded 19 Apr 2026View
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 18 Jul 2026View
  • Withdrawal Update Form 2FORM-2_ENGINEER-CERTIFICATE_compressed.pdf · uploaded 18 Jul 2026View

Promoter documents

  • Legal Title reportltr.pdf · uploaded 23 Dec 2024View
  • Declaration Form BFORM-B_promoter-Tara_compressed.pdf · uploaded 23 Dec 2024View

Technical documents

  • Layout Approvalplan.pdfView
  • Building Plan ApprovalDECLARATION TARA.pdfView
  • Building Plan Approvalplan.pdfView
  • Building Plan Approval7 Other – Technical.pdfView
  • Building Plan ApprovalForm B _Tara Commercial Complex.pdfView
  • Building Plan Approvalplan.pdfView

Other legal documents

  • Other – LegalDOA-X-274_X-275_MAA-VAISHNAVI-INFRA_1-13.pdfView
  • Other – LegalDOA-X-274_X-275_MAA-VAISHNAVI-INFRA_14-27.pdfView
  • Other – LegalMIDC-TRANSFER-ORDER_.pdfView
  • Other – LegalFIRM_PARTNERSHIP-DEED-(NOTARY)_MAA-VAISHNAVI-INFRA_compressed.pdfView

Financial documents

  • Other – FinanceDOA-X-274_X-275_MAA-VAISHNAVI-INFRA_1-13.pdf · uploaded 23 Dec 2024View
  • Other – FinanceDOA-X-274_X-275_MAA-VAISHNAVI-INFRA_14-27.pdf · uploaded 23 Dec 2024View
  • Other – FinanceMIDC-TRANSFER-ORDER_.pdf · uploaded 23 Dec 2024View
  • Other – FinanceFIRM_PARTNERSHIP-DEED-(NOTARY)_MAA-VAISHNAVI-INFRA_compressed.pdf · uploaded 23 Dec 2024View
  • Other – FinanceForm B _Tara Commercial Complex.pdf · uploaded 28 Feb 2025View

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Butibori, Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

PLOT NO. X274X275

As published on MahaRERA's project page

PLOT NO. X-274, X-275, BUTIBORI INDUSTRIAL AREA

Boundaries

North
60 Mtrs Road
South
Plot No X 276
East
10 Mtrs Road
West
Plot No P 26

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr MANISH R KHOBRAGADE—
Chartered accountantCa Ankit Talreja—
EngineerEr AJAY H THAWRE—