Skip to content

Prayag Paradise

Certificate Signed

Borgaon Khu., Nagpur 440013 |Promoter: Shashank Pande

14 Nov 2022Registered with MahaRERA
31 Dec 2027Promised completion
30 Apr 2028Revised completionPushed back 4 months
1Building
32Units registered0 booked (0%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
2BHK, 3BHK, Office space, Shop32 units in all
Address
566/51/A W No 62 Cst No.679 Sheet No132/44 Khasra No157/1, 2, 59/1, 2, 354/2 & 55, Associated Friends Colony Layout, Friends ColonyPIN 440013
Designated bank account
213
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.17461, 79.05612
Prayag Paradise is at latitude 21.17461, longitude 79.05612.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
14 Nov 2022
Promised
31 Dec 2027
Revised
30 Apr 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050004760714 Nov 202231 Dec 202730 Apr 2028Shashank PandeProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Prayag Paradise832

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 of 32 units booked (0%), as the promoter reported to MahaRERA

2BHK · 4 units3BHK · 4 unitsOffice space · 16 unitsShop · 8 units
TypeCarpet areaUnitsBooked
2BHK262.67 sq m · 2,827 sq ft40
3BHK307.87 sq m · 3,314 sq ft40
Office space857.19 sq m · 9,227 sq ft160
Shop307.56 sq m · 3,311 sq ft80

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

59 documents held by Deedo, 176 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Other (6)

  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
Show all 235 documentsShow fewer documents

Commencement certificate (2)

  • Commencement certificateDate not statedView
  • Commencement certificateDate not statedView

Form B (2)

  • Form BDate not statedView
  • Form BDate not statedView

Form 1 (25)

  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView

Allotment letter

  • Allotment letterDate not statedView

Title report (2)

  • Title reportDate not statedView
  • Title reportDate not statedView

Encumbrance details (3)

  • Encumbrance detailsDate not statedView
  • Encumbrance detailsDate not statedView
  • Encumbrance detailsDate not statedView

Layout plan (2)

  • Layout planDate not statedView
  • Layout planDate not statedView

Building plan (5)

  • Building planDate not statedView
  • Building planDate not statedView
  • Building planDate not statedView
  • Building planDate not statedView
  • Building planDate not statedView

Form 2 (9)

  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView

Legal

  • Other – LegalAGREEMENT OF DEVELOPMENT_compressed.pdf · uploaded 20 Sep 2022View
  • Legal Title reportTITAL VERIFICATION.pdf · uploaded 20 Sep 2022View
  • Other – LegalIRREVOCABLE GENERAL POWER OF ATTORNEY_compressed.pdf · uploaded 18 Oct 2022View
  • Legal Title reportTITLE REPORT PARADISE RERA (1).pdf · uploaded 18 Oct 2022View
  • Declaration Form BSHASHANKRERA.pdf · uploaded 18 Oct 2022View
  • Declaration Form BROOPCHAND RERA.pdf · uploaded 18 Oct 2022View

Migrated

  • 1 PAN CardSHASHANK PANDE PAN.pdf · uploaded 20 Sep 2022View
  • 1 Copy of the legal title reportTITAL VERIFICATION.pdf · uploaded 20 Sep 2022View
  • 1 a Details of encumbrances concerned to FinanceNon Encumbrance (1).pdf · uploaded 20 Sep 2022View
  • 1 b Details of encumbrances concerned to LegalNon Encumbrance (1).pdf · uploaded 20 Sep 2022View
  • 1 Building Plan Approval / NA Order for plotted developmentBUILDING PERMIT_compressed.pdf · uploaded 20 Sep 2022View
  • 2 Building Plan Approval / NA Order for plotted developmentMAP_1.pdf · uploaded 20 Sep 2022View
  • 3 Building Plan Approval / NA Order for plotted developmentMAP_2.pdf · uploaded 20 Sep 2022View
  • 4 Building Plan Approval / NA Order for plotted developmentMAP_3.pdf · uploaded 20 Sep 2022View
  • 5 Building Plan Approval / NA Order for plotted developmentMAP_4.pdf · uploaded 20 Sep 2022View
  • 1 Commencement Certificates / NA Order for plotted developmentBUILDING PERMIT_compressed.pdf · uploaded 20 Sep 2022View
  • 1 Declaration about Commencement CertificateBUILDING PERMIT_compressed.pdf · uploaded 20 Sep 2022View
  • 1 Deviation Report with respect to model copy of Agreementagreement draft_compressed.pdf · uploaded 20 Sep 2022View
  • 1 Other – LegalAGREEMENT OF DEVELOPMENT_compressed.pdf · uploaded 20 Sep 2022View
  • 1 Copy of Layout Approval (in case of layout)LAYOUT PLAN PARADISE.pdf · uploaded 29 Sep 2022View
  • 1 CERSAI detailsCERSAI.pdf · uploaded 29 Sep 2022View
  • 2 Copy of the legal title reportTITLE REPORT PARADISE RERA (1).pdf · uploaded 18 Oct 2022View
  • 2 b Details of encumbrances concerned to LegalENCUMBRANCE CERTIFICATE RERA.pdf · uploaded 18 Oct 2022View
  • 6 Building Plan Approval / NA Order for plotted developmentMAP_1.pdf · uploaded 18 Oct 2022View
  • 2 Declaration about Commencement CertificateCOMESMENT CERTIFICATE RERA.pdf · uploaded 18 Oct 2022View
  • 1 Declaration in FORM BSHASHANKRERA.pdf · uploaded 18 Oct 2022View
  • 2 Declaration in FORM BROOPCHAND RERA.pdf · uploaded 18 Oct 2022View
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3_compressed.pdf · uploaded 18 Oct 2022View
  • 1 Proforma of Allotment letterALLOTMENT LETTER PARADISE_compressed.pdf · uploaded 18 Oct 2022View
  • 1 Proforma of Agreement for saleALLOTMENT LETTER PARADISE_compressed.pdf · uploaded 18 Oct 2022View
  • 2 Proforma of Agreement for saleAgreement to sale Flat -FOR-RERA.pdf · uploaded 18 Oct 2022View
  • 2 Proforma of Allotment letterAgreement to sale Flat -FOR-RERA.pdf · uploaded 18 Oct 2022View
  • 1 Deviation Report with respect to Allotment letterDEVIATION CERTIFICATE RERA.pdf · uploaded 18 Oct 2022View
  • 2 Other – LegalIRREVOCABLE GENERAL POWER OF ATTORNEY_compressed.pdf · uploaded 18 Oct 2022View
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Declaration (1).pdf · uploaded 2 Nov 2022View
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 dec 2022.pdf · uploaded 8 Feb 2024View
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 march 2023.pdf · uploaded 8 Feb 2024View
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 june 2023.pdf · uploaded 8 Feb 2024View
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 sep 2023.pdf · uploaded 8 Feb 2024View
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 dec 2023.pdf · uploaded 8 Feb 2024View
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Prayag Developers.pdf · uploaded 4 Mar 2024View
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)2_FORM 1 JUNE 2024.pdf · uploaded 20 Feb 2025View
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)3_FORM 1 SEP 2024.pdf · uploaded 20 Feb 2025View
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)4_FORM 1 DEC 2024.pdf · uploaded 20 Feb 2025View
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Form 1 Dec 2022.pdf · uploaded 20 Feb 2025View
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)2_Form 1 March 2023.pdf · uploaded 20 Feb 2025View
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)3_Form 1 June 2023.pdf · uploaded 20 Feb 2025View
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)4_Form 1 Sep 2023.pdf · uploaded 20 Feb 2025View
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)5_Form 1 Dec 2023.pdf · uploaded 20 Feb 2025View
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1_FORM 1 MARCH 2024.pdf · uploaded 20 Feb 2025View
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)3_FORM 3 SEP 2024_.pdf · uploaded 20 Feb 2025View
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)4_FORM 3 DEC 2024_.pdf · uploaded 20 Feb 2025View
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)2_FORM 3 JUNE 2024_.pdf · uploaded 20 Feb 2025View
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)1_FOEM 3 MARCH 2024_.pdf · uploaded 20 Feb 2025View
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)1_FORM 1 MARCH 2024.pdf · uploaded 20 Feb 2025View
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1_Form 2 Dec 2022.pdf · uploaded 20 Feb 2025View
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Form 2 March 2023.pdf · uploaded 20 Feb 2025View
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3_Form 2 June 2023.pdf · uploaded 20 Feb 2025View
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4_Form 2 Sep 2023.pdf · uploaded 20 Feb 2025View
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5_Form 2 Dec 2023.pdf · uploaded 20 Feb 2025View
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6_Form 2 March 2024.pdf · uploaded 20 Feb 2025View
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)7_Form 2 June 24.pdf · uploaded 20 Feb 2025View
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)8_Form 2 Sep 24.pdf · uploaded 20 Feb 2025View
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)9_Form 2 Dec 24.pdf · uploaded 20 Feb 2025View
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 (1).pdf · uploaded 20 Feb 2025View
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT'S CERTIFICATE FORM-1.pdf · uploaded 2 May 2025View
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA FORM-3_compressed (1).pdf · uploaded 2 May 2025View
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE FORM-2.pdf · uploaded 2 May 2025View
  • Form 1Form no-1.pdf · uploaded 1 Aug 2025Source
  • Form 2Form no-2.pdf · uploaded 1 Aug 2025Source
  • Form 3PRAYAG DEV FORM 3_JUNE 2025.pdf · uploaded 1 Aug 2025Source
  • Disclosure of Sold and Booked InventoryPRAYAG PARADISE DISCLOSURE OF INVENTORY.pdf · uploaded 1 Aug 2025Source
  • Form 5 (FY 2024-2025)FORM-5 March 2025.pdf · uploaded 14 Aug 2025Source
  • Form 1FORM -1 DEC -2022.pdf · uploaded 20 Aug 2025Source
  • Form 2FORM 2 -DEC -2022.pdf · uploaded 20 Aug 2025Source
  • Form 3FORM -3- DEC -2022.pdf · uploaded 20 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD-UNSOLD_DEC-22.pdf · uploaded 20 Aug 2025Source
  • Form 1FORM 1 -MAR-2023.pdf · uploaded 20 Aug 2025Source
  • Form 2FORM 2- MAR 2023.pdf · uploaded 20 Aug 2025Source
  • Form 3FORM 3- MAR -2023.pdf · uploaded 20 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD & UNSOLD MAR-23.pdf · uploaded 20 Aug 2025Source
  • Form 1FORM 1 -JUNE -2023.pdf · uploaded 20 Aug 2025Source
  • Form 2FORM 2-JUNE -2023.pdf · uploaded 20 Aug 2025Source
  • Form 3FORM-3_JUNE-2023.pdf · uploaded 20 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD & UNSOLD JUNE-23.pdf · uploaded 20 Aug 2025Source
  • Form 1FORM - 1SEP -2023.pdf · uploaded 20 Aug 2025Source
  • Form 2FORM 2 -SEP -2023.pdf · uploaded 20 Aug 2025Source
  • Form 3FORM 3- SEP -2023.pdf · uploaded 20 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD & UNSOLD SEP-23.pdf · uploaded 20 Aug 2025Source
  • Form 1FORM 1 -DEC 2023.pdf · uploaded 20 Aug 2025Source
  • Form 2FORM 2- DEC -2023.pdf · uploaded 20 Aug 2025Source
  • Form 3FORM 3- DEC 2023.pdf · uploaded 20 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD & UNSOLD DEC-23.pdf · uploaded 20 Aug 2025Source
  • Form 1FORM 1 MAR-2024.pdf · uploaded 20 Aug 2025Source
  • Form 2FORM 2 -MARCH -2024.pdf · uploaded 20 Aug 2025Source
  • Form 3FORM 3- MAR 2024.pdf · uploaded 20 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD & UNSOLD MAR-24.pdf · uploaded 20 Aug 2025Source
  • Form 1FORM 1 JUNE -2024.pdf · uploaded 20 Aug 2025Source
  • Form 2FORM 2- JUNE-2024.pdf · uploaded 20 Aug 2025Source
  • Form 3FORM 3- JUNE 2024.pdf · uploaded 20 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD & UNSOLD JUNE-24..pdf · uploaded 20 Aug 2025Source
  • Form 1FORM -1 SEP -2024.pdf · uploaded 20 Aug 2025Source
  • Form 2FORM 2 - SEP -2024.pdf · uploaded 20 Aug 2025Source
  • Form 3FORM 3- SEP - 2024.pdf · uploaded 20 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD & UNSOLD SEP-24.pdf · uploaded 20 Aug 2025Source
  • Form 1FORM -1 DEC -2024.pdf · uploaded 20 Aug 2025Source
  • Form 2FORM 2- DEC -2024.pdf · uploaded 20 Aug 2025Source
  • Form 3FORM 3 - DEC -2024.pdf · uploaded 20 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD & UNSOLD DEC-24.pdf · uploaded 20 Aug 2025Source
  • Form 1FORM 1 -MAR -2025.pdf · uploaded 20 Aug 2025Source
  • Form 2FORM 2- MAR -2025.pdf · uploaded 20 Aug 2025Source
  • Form 3FORM-3 MAR-25.pdf · uploaded 20 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD & UNSOLD MAR-25.pdf · uploaded 20 Aug 2025Source
  • Withdrawal Update Form 1FORM-1 JUNE-2025.pdf · uploaded 20 Aug 2025Source
  • Withdrawal Update Form 1FORM-1 JUNE-2025.pdf · uploaded 20 Aug 2025Source
  • Withdrawal Update Form 1FORM-1 JUNE-2025.pdf · uploaded 20 Aug 2025Source
  • Withdrawal Update Form 1FORM-1 JUNE-2025.pdf · uploaded 20 Aug 2025Source
  • Withdrawal Update Form 2FORM-2 JUN-25.pdf · uploaded 20 Aug 2025Source
  • Withdrawal Update Form 2FORM-2 JUN-25.pdf · uploaded 20 Aug 2025Source
  • Withdrawal Update Form 2FORM-2 JUN-25.pdf · uploaded 20 Aug 2025Source
  • Withdrawal Update Form 2FORM-2 JUN-25.pdf · uploaded 20 Aug 2025Source
  • Withdrawal Update Form 3FORM-3 JUN-25.pdf · uploaded 20 Aug 2025Source
  • Withdrawal Update Form 3FORM-3 JUN-25.pdf · uploaded 20 Aug 2025Source
  • Withdrawal Update Form 3FORM-3 JUN-25.pdf · uploaded 20 Aug 2025Source
  • Withdrawal Update Form 3FORM-3 JUN-25.pdf · uploaded 20 Aug 2025Source
  • Form 2A (FY 2022-2023)Form 2A March 2023.pdf · uploaded 20 Aug 2025Source
  • Form 2A (FY 2023-2024)Form 2A March 2024.pdf · uploaded 20 Aug 2025Source
  • Form 2A (FY 2024-2025)Form 2A March 2025.pdf · uploaded 20 Aug 2025Source
  • Withdrawal Update Form 1FORM-1.pdf · uploaded 20 Oct 2025Source
  • Withdrawal Update Form 2FORM-2.pdf · uploaded 20 Oct 2025Source
  • Withdrawal Update Form 3FORM-3.pdf · uploaded 20 Oct 2025Source
  • Withdrawal Update Form 1FORM-1 DEC-25 PRAYAG PARADISE.pdf · uploaded 19 Jan 2026Source
  • Withdrawal Update Form 2FORM 2_PRAYAG PARADISE_DEC 2025.pdf · uploaded 19 Jan 2026Source
  • Withdrawal Update Form 3FORM 3 Prayag paradise december 2025.pdf · uploaded 19 Jan 2026Source
  • Withdrawal Update Form 1FORM-1 DEC-25 PRAYAG PARADISE.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2FORM 2_PRAYAG PARADISE_DEC 2025.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3FORM 3 Prayag paradise december 2025.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 1FORM 1_PRAYAG PARADISE_MAR 2026.pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 2FORM 2_PRAYAG PARADISE_MAR 2026.pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 3FORM 3_PRAYAG PARADISE_MAR 2026.pdf · uploaded 21 Apr 2026Source
  • Form 2A (FY 2025-2026)FORM 2A_PRAYAG PARADISE_MAR 2026.pdf · uploaded 21 Apr 2026Source
  • Form 5 (FY 2025-2026)FORM 5 MARCH 2026.pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 1FORM 1_PRAYAG PARADISE_MAR 2026.pdf · uploaded 25 Apr 2026Source
  • Withdrawal Update Form 2FORM 2_PRAYAG PARADISE_MAR 2026.pdf · uploaded 25 Apr 2026Source
  • Withdrawal Update Form 3FORM 3_PRAYAG PARADISE_MAR 2026.pdf · uploaded 25 Apr 2026Source
  • Withdrawal Update Form 1FORM 1_PRAYAG PARADISE_MAR 2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2FORM 2_PRAYAG PARADISE_MAR 2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3FORM 3_PRAYAG PARADISE_MAR 2026.pdf · uploaded 18 Jul 2026Source

Technical

  • DocumentBUILDING PERMIT_compressed.pdf · uploaded 20 Sep 2022View
  • DocumentMAP_1.pdf · uploaded 20 Sep 2022View
  • DocumentMAP_2.pdf · uploaded 20 Sep 2022View
  • DocumentMAP_3.pdf · uploaded 20 Sep 2022View
  • DocumentMAP_4.pdf · uploaded 20 Sep 2022View
  • DocumentLAYOUT PLAN PARADISE.pdf · uploaded 29 Sep 2022View
  • DocumentMAP_1.pdf · uploaded 18 Oct 2022View
  • DocumentREVISED BUILDING SANCTIONED PLAN.pdf · uploaded 25 Apr 2026Source

Technical (Architect)

  • Document2_FORM 1 JUNE 2024.pdf · uploaded 20 Feb 2025View
  • Document3_FORM 1 SEP 2024.pdf · uploaded 20 Feb 2025View
  • Document4_FORM 1 DEC 2024.pdf · uploaded 20 Feb 2025View
  • Document1_Form 1 Dec 2022.pdf · uploaded 20 Feb 2025View
  • Document2_Form 1 March 2023.pdf · uploaded 20 Feb 2025View
  • Document3_Form 1 June 2023.pdf · uploaded 20 Feb 2025View
  • Document4_Form 1 Sep 2023.pdf · uploaded 20 Feb 2025View
  • Document5_Form 1 Dec 2023.pdf · uploaded 20 Feb 2025View
  • DocumentARCHITECT'S CERTIFICATE FORM-1.pdf · uploaded 2 May 2025View
  • DocumentFORM 1_PRAYAG PARADISE_MAR 2026.pdf · uploaded 21 Apr 2026Source

Technical (Engineer)

  • Document2_Form 2 March 2023.pdf · uploaded 20 Feb 2025View
  • Document3_Form 2 June 2023.pdf · uploaded 20 Feb 2025View
  • Document4_Form 2 Sep 2023.pdf · uploaded 20 Feb 2025View
  • Document5_Form 2 Dec 2023.pdf · uploaded 20 Feb 2025View
  • Document6_Form 2 March 2024.pdf · uploaded 20 Feb 2025View
  • Document7_Form 2 June 24.pdf · uploaded 20 Feb 2025View
  • Document8_Form 2 Sep 24.pdf · uploaded 20 Feb 2025View
  • Document9_Form 2 Dec 24.pdf · uploaded 20 Feb 2025View
  • DocumentENGINEERS CERTIFICATE FORM-2.pdf · uploaded 2 May 2025View
  • DocumentFORM 2_PRAYAG PARADISE_MAR 2026.pdf · uploaded 21 Apr 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Borgaon Khu., Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

2354/255566/51/A W NO 62 CST NO.679 SHEET NO132/44 KHASRA NO157/159/1

Boundaries

North
Plot Nos 47 To 51
South
12 Mtrs Wide Road
East
18 Meter Road
West
Plot No 15m X20m Allotted To Msedcl

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVikas Padole & Associates—
Chartered accountantSawalkar And Bonde—
EngineerVikas Padole—
EngineerVikas Padole & Associates—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology