Garden Court

Completed

Beltarodi, Nagpur 440034 |Promoter: Rathi Realty

Residential / Group HousingRERAP50500006270
14 Aug 2017Registered with MahaRERA
30 Dec 2020Promised completion
3Buildings
127Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
3
Unit types
2 and 3 BHK, 2 BHK127 units in all
Land area for this project
5,475 sq m (58,936 sq ft)
Permissible built-up area
7,560 sq m (81,370 sq ft)
Sanctioned built-up area
7,560 sq m (81,370 sq ft)
Recreational open space
863 sq m (9,294 sq ft)
Address
Khasra No.47, Ph No. 38 Plot No.1PIN 440034
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 17.27366, 74.61753
Garden Court is at latitude 17.27366, longitude 74.61753.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2020

The latest completion date on record passed 5 years and 10 months ago.

Registered
14 Aug 2017
Promised
30 Dec 2020

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050000627014 Aug 201730 Dec 2020—Rathi RealtyProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A847
Wing B740
Wing C740

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

127 units registered

2 and 3 BHK · 47 units2 BHK · 80 units
BuildingTypeCarpet areaUnits
Wing A2 and 3 BHK2,383.12 sq m · 25,652 sq ft47
Wing B2 BHK1,729.8 sq m · 18,619 sq ft40
Wing C2 BHK1,657.25 sq m · 17,838 sq ft40

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Wing AClosed/Covered000027
Wing AOpen Space00004
Wing BClosed/Covered000017
Wing BOpen Space00006
Wing CClosed/Covered000012
Wing COpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Wing A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsWORK COMPLETED100%
  • Water SupplyWORK COMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WORK COMPLETED100%
  • Storm Water DrainsWORK COMPLETED100%
  • Landscaping & Tree PlantingWORK COMPLETED100%
  • Street LightingWORK COMPLETED100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsWORK COMPLETED100%
  • Treatment And Disposal Of Sewage And Sullage WaterWORK COMPLETED100%
  • Solid Waste Management And DisposalWORK COMPLETED100%
  • Water conservation /Rain water harvestingWORK COMPLETED100%
  • Energy managemcntWORK COMPLETED100%
  • Fire protection and fire safety requirementsWORK COMPLETED100%
  • Electrical meter room, sub-station, receiving stationWORK COMPLETED100%
  • Aggregate area of recreational Open SpaceWORK COMPLETED100%
  • Open ParkingWORK COMPLETED100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

17 documents held by Deedo, 20 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Registration certificate

Other (10)

Show all 37 documentsShow fewer documents

Other (10)

Layout plan

Building plan

Document library

  • Copy of the legal title reportverifiation report.pdf · uploaded 28 Jul 2017View
  • Details of encumbrancestitle legal report.pdf · uploaded 28 Jul 2017View
  • Copy of Layout Approval (in case of layout)layout plan.pdf · uploaded 28 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)final architech report.pdf · uploaded 28 Jul 2017Source
  • Declaration in FORM BFORM B.pdf · uploaded 28 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.pdf · uploaded 28 Jul 2017Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)wing a.pdf · uploaded 28 Jul 2017Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)wing b.pdf · uploaded 28 Jul 2017Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)wing c.pdf · uploaded 28 Jul 2017Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)common.pdf · uploaded 28 Jul 2017Source
  • Building Plan Approval (IOD)site plan.pdf · uploaded 28 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentcommencement certificate.pdf · uploaded 28 Jul 2017View
  • Proforma of Allotment letterAgreement for Sale - Garden Court - Rera Draft.pdf · uploaded 28 Jul 2017Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate.pdf · uploaded 4 Jan 2020Source
  • Architect’s Certificate on Completion of Project (Form 4)Architecture Certificate.pdf · uploaded 4 Jan 2020Source

Promoter documents

  • Legal Title reportverifiation report.pdf · uploaded 28 Jul 2017View
  • Declaration Form BFORM B.pdf · uploaded 28 Jul 2017View

Technical documents

  • Building Plan Approvalsite plan.pdfView
  • Layout Approvallayout plan.pdfView

Proforma allotment letter

  • Proforma allotment letterAgreement for Sale - Garden Court - Rera Draft.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Beltarodi, Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

1KHASRA NO.47PH NO. 38 PLOT NO.1

As published on MahaRERA's project page

KHASRA NO.47, PH NO. 38 PLOT NO.1

Boundaries

North
Others Plot
South
Road
East
Road
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMilind Harikisan Nadiyana—
EngineerVijendra P Kalambe—
OtherChetan Santosh Dhanjode—
OtherMahesh Rathi—
OtherRohit T Shahu—

Source: MahaRERA project page. Contact details are not shown.