Saraswati Paradise
Certificate SignedMulund, Mumbai Suburban 400080 |Promoter: Metro Dwellers Private Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- 1BHK, 2BHK, 3BHK, 5BHK & more, Office space, Shop, 1RK234 units in all
- Address
- 1167 1168 1202 1202/1 To 3 1203 1203/1 To 6, At The Corner Of Rrt Road, P K Road & Zaver Road, Mulund WestPIN 400080
- Designated bank account
- 76
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 27 Jun 2023
- Promised
- 31 Dec 2027
- Revised
- 30 Apr 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51800051636 | 27 Jun 2023 | 31 Dec 2027 | 30 Apr 2028 | Metro Dwellers Private Limited | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Saraswati Paradise A Wing And Comm | 23 | 131 |
| Saraswati Paradise B Wing | 13 | 103 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
47 of 234 units booked (20%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Saraswati Paradise A Wing And Comm | 1BHK | 35.57 sq m · 383 sq ft | 10 | 7 |
| Saraswati Paradise A Wing And Comm | 1BHK | 40.13 sq m · 432 sq ft | 26 | 13 |
| Saraswati Paradise A Wing And Comm | 2BHK | 50.07 sq m · 539 sq ft | 8 | 0 |
| Saraswati Paradise A Wing And Comm | 2BHK | 60.41 sq m · 650 sq ft | 12 | 5 |
| Saraswati Paradise A Wing And Comm | 2BHK | 63.87 sq m · 687 sq ft | 20 | 5 |
| Saraswati Paradise A Wing And Comm | 2BHK | 70.02 sq m · 754 sq ft | 34 | 11 |
| Saraswati Paradise A Wing And Comm | 3BHK | 85.31 sq m · 918 sq ft | 1 | 1 |
| Saraswati Paradise A Wing And Comm | 3BHK | 85.35 sq m · 919 sq ft | 1 | 0 |
Show all 36 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Saraswati Paradise A Wing And Comm | 5BHK & more | 348.73 sq m · 3,754 sq ft | 1 | 0 |
| Saraswati Paradise A Wing And Comm | Office space | 34.19 sq m · 368 sq ft | 1 | 0 |
| Saraswati Paradise A Wing And Comm | Office space | 34.72 sq m · 374 sq ft | 1 | 0 |
| Saraswati Paradise A Wing And Comm | Shop | 27.67 sq m · 298 sq ft | 1 | 0 |
| Saraswati Paradise A Wing And Comm | Shop | 27.86 sq m · 300 sq ft | 1 | 0 |
| Saraswati Paradise A Wing And Comm | Shop | 30 sq m · 323 sq ft | 1 | 1 |
| Saraswati Paradise A Wing And Comm | Shop | 32.9 sq m · 354 sq ft | 1 | 1 |
| Saraswati Paradise A Wing And Comm | Shop | 70.1 sq m · 755 sq ft | 1 | 0 |
| Saraswati Paradise A Wing And Comm | Shop | 79.89 sq m · 860 sq ft | 1 | 0 |
| Saraswati Paradise A Wing And Comm | Shop | 81.42 sq m · 876 sq ft | 1 | 0 |
| Saraswati Paradise A Wing And Comm | Shop | 116.39 sq m · 1,253 sq ft | 4 | 0 |
| Saraswati Paradise A Wing And Comm | Shop | 172.45 sq m · 1,856 sq ft | 1 | 1 |
| Saraswati Paradise A Wing And Comm | Shop | 302.77 sq m · 3,259 sq ft | 1 | 0 |
| Saraswati Paradise A Wing And Comm | Shop | 306.2 sq m · 3,296 sq ft | 1 | 0 |
| Saraswati Paradise A Wing And Comm | Shop | 306.21 sq m · 3,296 sq ft | 1 | 0 |
| Saraswati Paradise A Wing And Comm | Shop | 602.69 sq m · 6,487 sq ft | 1 | 0 |
| Saraswati Paradise B Wing | 1BHK | 40.09 sq m · 432 sq ft | 1 | 0 |
| Saraswati Paradise B Wing | 1BHK | 40.13 sq m · 432 sq ft | 3 | 0 |
| Saraswati Paradise B Wing | 1RK | 20.9 sq m · 225 sq ft | 1 | 0 |
| Saraswati Paradise B Wing | 1RK | 27.91 sq m · 300 sq ft | 20 | 0 |
| Saraswati Paradise B Wing | 1RK | 27.92 sq m · 301 sq ft | 17 | 0 |
| Saraswati Paradise B Wing | 1RK | 27.96 sq m · 301 sq ft | 9 | 0 |
| Saraswati Paradise B Wing | 1RK | 27.99 sq m · 301 sq ft | 34 | 0 |
| Saraswati Paradise B Wing | 1RK | 28.1 sq m · 302 sq ft | 9 | 0 |
| Saraswati Paradise B Wing | 1RK | 29.1 sq m · 313 sq ft | 1 | 0 |
| Saraswati Paradise B Wing | 2BHK | 60.41 sq m · 650 sq ft | 1 | 0 |
| Saraswati Paradise B Wing | 2BHK | 63.87 sq m · 687 sq ft | 1 | 0 |
| Saraswati Paradise B Wing | 2BHK | 70.02 sq m · 754 sq ft | 6 | 2 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 164 filings listed on MahaRERA's project page
Finance
- PAN Card1 PAN Card.pdf · uploaded 13 Feb 2023Source
Legal
- Legal Title reportMDPL TITLE SEARCH 1167 (1).pdf · uploaded 14 Feb 2023Source
- Legal Title reportMDPL TITLE SEARCH 1168 (1).pdf · uploaded 14 Feb 2023Source
- Legal Title reportMDPL TITLE SEARCH 1202 (1).pdf · uploaded 14 Feb 2023Source
- Legal Title reportMDPL TITLE SEARCH 1203 (1).pdf · uploaded 14 Feb 2023Source
- Other – LegalPG 1 5.pdf · uploaded 11 Mar 2023Source
- Other – LegalPG 6 10.pdf · uploaded 11 Mar 2023Source
Show all 165 documentsShow fewer documents
Legal
Migrated
- 1 PAN Card1 PAN Card.pdf · uploaded 13 Feb 2023Source
- 1 Copy of the legal title reportMDPL TITLE SEARCH 1167 (1).pdf · uploaded 14 Feb 2023Source
- 2 Copy of the legal title reportMDPL TITLE SEARCH 1168 (1).pdf · uploaded 14 Feb 2023Source
- 3 Copy of the legal title reportMDPL TITLE SEARCH 1202 (1).pdf · uploaded 14 Feb 2023Source
- 4 Copy of the legal title reportMDPL TITLE SEARCH 1203 (1).pdf · uploaded 14 Feb 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate bank account with No Lien.pdf · uploaded 14 Feb 2023Source
- 1 Deviation Report with respect to Allotment letterdeviation report with respect of allotment letter.pdf · uploaded 14 Feb 2023Source
- 1 Disclosure of Interest in Other Real Estate Organizationsdisclosure of int in other real estate.pdf · uploaded 24 Feb 2023Source
- 1 Deviation Report with respect to model copy of Agreementdeviation report for agreement for sale.pdf · uploaded 24 Feb 2023Source
- 2 Disclosure of Interest in Other Real Estate Organizationspictures_604.pdf · uploaded 1 Mar 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 4 Mar 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 6 Mar 2023Source
- 1 Copy of Layout Approval (in case of layout)GetUserDocumentFileContent.pdf · uploaded 11 Mar 2023Source
- 1 Other – LegalPG 1 5.pdf · uploaded 11 Mar 2023Source
- 2 Other – LegalPG 6 10.pdf · uploaded 11 Mar 2023Source
- 3 Other – LegalCLUBBING IOA.pdf · uploaded 11 Mar 2023Source
- 4 Other – LegalClubbing LOI (1)_compressed.pdf · uploaded 11 Mar 2023Source
- 1 a Details of encumbrances concerned to Financeemcumbrances in respect of charge on land(finance).pdf · uploaded 13 Mar 2023Source
- 2 a Details of encumbrances concerned to Financeemcumbrances in respect of land (legal).pdf · uploaded 13 Mar 2023Source
- 1 b Details of encumbrances concerned to Legalemcumbrances in respect of charge on land(finance).pdf · uploaded 13 Mar 2023Source
- 2 b Details of encumbrances concerned to Legalemcumbrances in respect of land (legal).pdf · uploaded 13 Mar 2023Source
- 1 Proforma of Allotment letterPROFORMA ALLOTMENT LETTER.pdf · uploaded 13 Mar 2023Source
- 1 Proforma of Agreement for salepage1_15_compressed.pdf · uploaded 13 Mar 2023Source
- 2 Proforma of Agreement for sale16-30_compressed.pdf · uploaded 13 Mar 2023Source
- 3 Proforma of Agreement for sale31-40_compressed.pdf · uploaded 13 Mar 2023Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samepictures_714.pdf · uploaded 23 Mar 2023Source
- 1 Declaration in FORM Bpictures_1196.pdf · uploaded 5 Jun 2023Source
- 1 Building Plan Approval / NA Order for plotted development1_Page_Highlighted.pdf · uploaded 16 Jun 2023Source
- 2 Building Plan Approval / NA Order for plotted development2 (2)-compressed.pdf · uploaded 16 Jun 2023Source
- 3 Building Plan Approval / NA Order for plotted development3 (3)-compressed.pdf · uploaded 16 Jun 2023Source
- 4 Building Plan Approval / NA Order for plotted development4 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- 5 Building Plan Approval / NA Order for plotted development5 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- 6 Building Plan Approval / NA Order for plotted development6 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- 7 Building Plan Approval / NA Order for plotted development7 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- 8 Building Plan Approval / NA Order for plotted development8-compressed.pdf · uploaded 16 Jun 2023Source
- 9 Building Plan Approval / NA Order for plotted development9 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- 10 Building Plan Approval / NA Order for plotted development10 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- 11 Building Plan Approval / NA Order for plotted development11 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- 12 Building Plan Approval / NA Order for plotted development12 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- 13 Building Plan Approval / NA Order for plotted development13 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- 1 Declaration about Commencement CertificateCC 160623.pdf · uploaded 16 Jun 2023Source
- 1 Disclosure of sold/ booked inventoryUNSOLD INVENTORY 160623-compressed.pdf · uploaded 16 Jun 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form_3_16062023.pdf · uploaded 16 Jun 2023Source
- 1 Other – TechnicalFSI 160623-compressed.pdf · uploaded 16 Jun 2023Source
- 3 a Details of encumbrances concerned to Financepictures_1329.pdf · uploaded 17 Jun 2023Source
- 3 b Details of encumbrances concerned to Legalpictures_1329.pdf · uploaded 17 Jun 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentpictures_1325_compressed.pdf · uploaded 17 Jun 2023Source
- 1 CERSAI detailspictures_1331.pdf · uploaded 17 Jun 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 30062023 SIGN.pdf · uploaded 2 Mar 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)MAHA RERA FORM 1 Architect Certificate 30092023 SIGN.pdf · uploaded 2 Mar 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)MAHA RERA FORM 1 Architect Certificate 11122023 SIGN.pdf · uploaded 2 Mar 2024Source
- 2 Disclosure of sold/ booked inventory30 JUN INVENTORY3.pdf · uploaded 2 Mar 2024Source
- 3 Disclosure of sold/ booked inventory30 SEP INVENTORY.pdf · uploaded 2 Mar 2024Source
- 4 Disclosure of sold/ booked inventory11 DEC INVENTORY.pdf · uploaded 2 Mar 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)30 JUN INVENTORY3.pdf · uploaded 2 Mar 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)F 3 30 jun23_11zon.pdf · uploaded 2 Mar 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)F 3 Sep23_11zon.pdf · uploaded 2 Mar 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)F 3 11 dec23_11zon.pdf · uploaded 2 Mar 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Image_520.pdf · uploaded 5 Apr 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Image_521.pdf · uploaded 5 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Image_522.pdf · uploaded 5 Apr 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2_MDPL_30062023.pdf · uploaded 12 Apr 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2_MDPL_30092023.pdf · uploaded 12 Apr 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2_MDPL_11122023.pdf · uploaded 12 Apr 2024Source
- 4 a Details of encumbrances concerned to Financeencrumbranse for loan(capri).pdf · uploaded 17 Apr 2024Source
- 4 b Details of encumbrances concerned to Legalencrumbranse for loan(capri).pdf · uploaded 17 Apr 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)31 Dec 23_Form-1.pdf · uploaded 8 May 2024Source
- 5 Disclosure of sold/ booked inventory31 Dec 23_Inventory_11zon.pdf · uploaded 8 May 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)31 Dec 23_Form-3.pdf · uploaded 8 May 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM_1SP_MDPL_JUNE_2024.pdf · uploaded 28 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM_1_SP_MDPL_SEP_2024.pdf · uploaded 28 Oct 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM_1_SP_MDPL_MAR_2024.pdf · uploaded 28 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM_3_SP_MDPL_MAR_2023_compressed.pdf · uploaded 28 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM_2_SP_MDPL_DEC_2023.pdf · uploaded 28 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM_2_SP_MDPL_MARCH_2024.pdf · uploaded 28 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryINVENTORY_SP_MDPL_MAR_24.pdf · uploaded 28 Oct 2024Source
- Form 1MDPL_FORM_1_30062023.pdf · uploaded 30 Jul 2025Source
- Form 2MDPL_FPRM_2_30062023.pdf · uploaded 30 Jul 2025Source
- Form 3MDPL_FORM_3_30062023.pdf · uploaded 30 Jul 2025Source
- Disclosure of Sold and Booked InventoryINV_DIC300623.pdf · uploaded 30 Jul 2025Source
- Form 1MDPL_FORM_1_30092023.pdf · uploaded 30 Jul 2025Source
- Form 2MDPL_FORM_2_30092023.pdf · uploaded 30 Jul 2025Source
- Form 3MDPL_FORM_3_30092023.pdf · uploaded 30 Jul 2025Source
- Disclosure of Sold and Booked InventoryINV_DIC300623.pdf · uploaded 30 Jul 2025Source
- Form 1MDPL_FORM_1_11122023.pdf · uploaded 30 Jul 2025Source
- Form 2MDPL_FORM_2_11122023.pdf · uploaded 30 Jul 2025Source
- Form 3MDPL_FORM_3_11122023.pdf · uploaded 30 Jul 2025Source
- Disclosure of Sold and Booked InventoryINV_DIC111223.pdf · uploaded 30 Jul 2025Source
- Form 1MDPL_FORM_1_31032024.pdf · uploaded 30 Jul 2025Source
- Form 2MDPL_FORM_2_31032024.pdf · uploaded 30 Jul 2025Source
- Form 3MDPL_FORM_3_31032024.pdf · uploaded 30 Jul 2025Source
- Disclosure of Sold and Booked InventoryINV_DIC310324.pdf · uploaded 30 Jul 2025Source
- Form 11_Form 1 Q1 of FY 2024-25.pdf · uploaded 27 Feb 2026Source
- Form 21_Form 2 Q1 of FY 2024-25.pdf · uploaded 27 Feb 2026Source
- Form 35_Form 3 Q1 of FY 2024-25.pdf · uploaded 27 Feb 2026Source
- Disclosure of Sold and Booked Inventory1_Disclosure of Sold Q1 of FY 2024-25.pdf · uploaded 27 Feb 2026Source
- Form 12_Form 1 Q2 of FY 2024-25.pdf · uploaded 27 Feb 2026Source
- Form 22_Form 2 Q2 of FY 2024-25.pdf · uploaded 27 Feb 2026Source
- Form 32_Form 3 Q2 of FY 2023-24.pdf · uploaded 27 Feb 2026Source
- Disclosure of Sold and Booked Inventory2_Disclosure of Sold Q2 of FY 2024-25.pdf · uploaded 27 Feb 2026Source
- Form 13_Form 1 Q3 of FY 2024-25.pdf · uploaded 4 Mar 2026Source
- Form 23_Form 2 Q3 of FY 2024-25.pdf · uploaded 4 Mar 2026Source
- Form 37_Form 3 Q3 of FY 2024-25.pdf · uploaded 4 Mar 2026Source
- Disclosure of Sold and Booked Inventory3_Disclosure of Sold Q3 of FY 2024-25.pdf · uploaded 4 Mar 2026Source
- Form 14_Form 1 Q4 of FY 2024-25.pdf · uploaded 4 Mar 2026Source
- Form 24_Form 2 Q4 of FY 2024-25.pdf · uploaded 4 Mar 2026Source
- Form 38_Form 3 Q4 of FY 2024-25.pdf · uploaded 4 Mar 2026Source
- Disclosure of Sold and Booked Inventory4_Disclosure of Sold Q4 of FY 2024-25.pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 15_Form 1 Q1 of FY 2025-26.pdf · uploaded 26 Mar 2026Source
- Withdrawal Update Form 25_Form 2 Q1 of FY 2025-26.pdf · uploaded 26 Mar 2026Source
- Withdrawal Update Form 35_Form 3 Q1 of FY 2025-26.pdf · uploaded 26 Mar 2026Source
- Withdrawal Update Form 16_Form 1 Q2 of FY 2025-26.pdf · uploaded 30 Mar 2026Source
- Withdrawal Update Form 16_Form 1 Q2 of FY 2025-26.pdf · uploaded 30 Mar 2026Source
- Withdrawal Update Form 26_Form 2 Q2 of FY 2025-26 .pdf · uploaded 30 Mar 2026Source
- Withdrawal Update Form 26_Form 2 Q2 of FY 2025-26 .pdf · uploaded 30 Mar 2026Source
- Withdrawal Update Form 36_Form 3 Q2 of FY 2025-26.pdf · uploaded 30 Mar 2026Source
- Withdrawal Update Form 36_Form 3 Q2 of FY 2025-26.pdf · uploaded 30 Mar 2026Source
- Withdrawal Update Form 17_Form 1 Q3 of FY 2025-26.pdf · uploaded 31 Mar 2026Source
- Withdrawal Update Form 27_Form 2 Q3 of FY 2025-26.pdf · uploaded 31 Mar 2026Source
- Withdrawal Update Form 3Form 3 Q3 of FY 2025-26.pdf · uploaded 31 Mar 2026Source
- Withdrawal Update Form 1form-1 Q4.pdf · uploaded 17 Aug 2026Source
- Withdrawal Update Form 2form 2 Q4.pdf · uploaded 17 Aug 2026Source
- Withdrawal Update Form 3Form 3-Q4 FY 2025-26 (1).pdf · uploaded 17 Aug 2026Source
- Withdrawal Update Form 1Form 1-Q1 FY 2026-27_Saraswati Paradise.pdf · uploaded 20 Aug 2026Source
- Withdrawal Update Form 2Form 2-Q1 FY 2026-27_Saraswati Paradise.pdf · uploaded 20 Aug 2026Source
- Withdrawal Update Form 3Form 3-Q1 FY 2026-27_Saraswati Paradise (1).pdf · uploaded 20 Aug 2026Source
- Withdrawal Update Form 1Form 1-Q1 FY 2026-27_Saraswati Paradise.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 1Form 1 March 2026.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 2Form 2-Q1 FY 2026-27_Saraswati Paradise.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 2Form 2 March 2026.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 3Form 3 March 2026.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 3Form 3 March 2026.pdf · uploaded 21 Aug 2026Source
Technical
- DocumentGetUserDocumentFileContent.pdf · uploaded 11 Mar 2023Source
- Document1_Page_Highlighted.pdf · uploaded 16 Jun 2023Source
- Document2 (2)-compressed.pdf · uploaded 16 Jun 2023Source
- Document3 (3)-compressed.pdf · uploaded 16 Jun 2023Source
- Document4 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- Document5 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- Document6 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- Document7 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- Document8-compressed.pdf · uploaded 16 Jun 2023Source
- Document9 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- Document10 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- Document11 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- Document12 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- Document13 (1)-compressed.pdf · uploaded 16 Jun 2023Source
- Other – TechnicalFSI 160623-compressed.pdf · uploaded 16 Jun 2023Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Mulund, Kurla taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- P K Road
- South
- Cts 1162 And Cts 1169
- East
- Rrt Road
- West
- Zaver Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Speco Architect | — |
| Architect | Xar Workshop LLP | — |
| Chartered accountant | Amit bothra | — |
| Chartered accountant | Arvind Hemraj Nagda | — |
| Chartered accountant | Gopal Harsh Harsh | — |
| Engineer | Deepak Yadav | — |
| Engineer | John Abraham | — |
| Other | Mahimtura Consultants Pvt Ltd | — |
| Other | Shekhar Vaidya | — |
| Other | Shree Build Tech | — |
Source: MahaRERA project page. Contact details are not shown.