Pramukh Krupa Phase One

Certificate Signed

Mulund, Mumbai Suburban 400080 |Promoter: Pinal Realty LLP

27 Jun 2023Registered with MahaRERA
31 Mar 2025Promised completion
31 Mar 2026Revised completionPushed back 1 year
1Building
25Units registered5 booked (20%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
Office space, Sanskar Dham Hall, Sanskar Dham Tenant, Shop, Tenant Office, Tenant Shop25 units in all
Address
C.T.S. No. 1138, 1138/1 to 22, Junction of M G Road and Ganesh Gawade Road, Mulund West MumbaiPIN 400080
Designated bank account
17
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.17459, 72.95355
Pramukh Krupa Phase One is at latitude 19.17459, longitude 72.95355.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 7 months ago.

Registered
27 Jun 2023
Promised
31 Mar 2025
Revised
31 Mar 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5180005170227 Jun 202331 Mar 202531 Mar 2026Pinal Realty LLPProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
C Wing325

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

5 of 25 units booked (20%), as the promoter reported to MahaRERA

Office space · 7 unitsSanskar Dham Hall · 1 unitSanskar Dham Tenant · 1 unitShop · 1 unitTenant Office · 1 unitTenant Shop · 14 units
TypeCarpet areaUnitsBooked
Office space3.71 sq m · 40 sq ft11
Office space44.13 sq m · 475 sq ft10
Office space51.18 sq m · 551 sq ft10
Office space65.31 sq m · 703 sq ft11
Office space90.02 sq m · 969 sq ft10
Office space122.72 sq m · 1,321 sq ft11
Office space147.06 sq m · 1,583 sq ft10
Sanskar Dham Hall383.6 sq m · 4,129 sq ft11
Show all 18 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Sanskar Dham Tenant185.8 sq m · 2,000 sq ft10
Shop95.78 sq m · 1,031 sq ft11
Tenant Office142.88 sq m · 1,538 sq ft10
Tenant Shop16.71 sq m · 180 sq ft30
Tenant Shop16.72 sq m · 180 sq ft10
Tenant Shop20.53 sq m · 221 sq ft10
Tenant Shop24.06 sq m · 259 sq ft40
Tenant Shop27.22 sq m · 293 sq ft30
Tenant Shop65.22 sq m · 702 sq ft10
Tenant Shop119.57 sq m · 1,287 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 135 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Finance

  • PAN Card1 PAN Card (4).pdf · uploaded 27 Apr 2023Source

Legal

  • Legal Title report1 Copy of the legal title report (1).pdf · uploaded 27 Apr 2023Source
  • Declaration Form B1 Declaration in FORM B (1).pdf · uploaded 27 Apr 2023Source
  • Declaration Form BForm B (Affidavit cum Declaration).pdf · uploaded 24 Mar 2025Source

Migrated

  • 1 PAN Card1 PAN Card (4).pdf · uploaded 27 Apr 2023Source
  • 1 Copy of the legal title report1 Copy of the legal title report (1).pdf · uploaded 27 Apr 2023Source
Show all 137 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)1 page Pramukh Ph 1_11zon.pdf · uploaded 27 Apr 2023Source
  • 1 Commencement Certificates / NA Order for plotted development1 Commencement Certificates _ NA Order for plotted development.pdf · uploaded 27 Apr 2023Source
  • 1 Declaration in FORM B1 Declaration in FORM B (1).pdf · uploaded 27 Apr 2023Source
  • 1 Proforma of Agreement for sale1 Proforma of Agreement for sale (1).pdf · uploaded 27 Apr 2023Source
  • 1 Proforma of Allotment letter1 Proforma of Allotment letter (1).pdf · uploaded 27 Apr 2023Source
  • 1 Building Plan Approval / NA Order for plotted development1-2 pkp1_11zon.pdf · uploaded 16 May 2023Source
  • 1 a Details of encumbrances concerned to FinancePramukh krupa ncumbrance finance.pdf · uploaded 19 May 2023Source
  • 2 a Details of encumbrances concerned to FinancePramukh Krupa Encumbrance legal.pdf · uploaded 19 May 2023Source
  • 1 b Details of encumbrances concerned to LegalPramukh krupa ncumbrance finance.pdf · uploaded 19 May 2023Source
  • 2 b Details of encumbrances concerned to LegalPramukh Krupa Encumbrance legal.pdf · uploaded 19 May 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentPage 3 Pramukh_merged_compressed.pdf · uploaded 19 May 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentPage 5 Pramukh_merged_11zon.pdf · uploaded 19 May 2023Source
  • 4 Building Plan Approval / NA Order for plotted development4 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 19 May 2023Source
  • 1 Declaration about Commencement CertificateFormat D(32) Pramukh Krupa Ph 1.pdf · uploaded 19 May 2023Source
  • 1 CERSAI details1 CERSAI details (1) (1).pdf · uploaded 19 May 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3 of Pramukh Krupa Phase 1.pdf · uploaded 19 May 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure -A-merged_11zon.pdf · uploaded 19 May 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat-A_11zon.pdf · uploaded 19 May 2023Source
  • 1 Deviation Report with respect to Allotment letterPramukh krupa Deviation report-allotment letter_11zon.pdf · uploaded 19 May 2023Source
  • 1 Deviation Report with respect to model copy of AgreementPramukh krupa deviation AFS_11zon.pdf · uploaded 19 May 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Pramukh Krupa PHASE ONE as on September 2023.pdf · uploaded 5 Dec 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Pramukh Krupa PHASE ONE as on June 2023.pdf · uploaded 8 Dec 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Pramukh Krupa PH 1 as on Dec 2023.pdf · uploaded 6 Jan 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Pramukh Krupa Phase One as on June 2023.pdf · uploaded 17 Jan 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Pramukh Krupa Phase One as on Sept 2023.pdf · uploaded 17 Jan 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Pramukh Krupa Phase One as on Dec 2023.pdf · uploaded 17 Jan 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Pramukh Krupa Phase One as on June 2023.pdf · uploaded 17 Jan 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Pramukh Krupa Phase One as on 30th Sept 23.pdf · uploaded 17 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Pramukh Krupa Phase One as on 31st December 23.pdf · uploaded 17 Jan 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 -June 2023.pdf · uploaded 1 Feb 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Sept 2023.pdf · uploaded 1 Feb 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Dec 2023.pdf · uploaded 1 Feb 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - June 2023.pdf · uploaded 1 Feb 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Sept 2023.pdf · uploaded 1 Feb 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Dec 2023.pdf · uploaded 1 Feb 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - June 2023.pdf · uploaded 1 Feb 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Sept 2023.pdf · uploaded 1 Feb 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Dec 2023.pdf · uploaded 1 Feb 2024Source
  • 2 Copy of Layout Approval (in case of layout)approval.pdf · uploaded 12 Mar 2024Source
  • 5 Building Plan Approval / NA Order for plotted development1_2_3_4_merged.pdf · uploaded 12 Mar 2024Source
  • 6 Building Plan Approval / NA Order for plotted development5_6_7_merged.pdf · uploaded 12 Mar 2024Source
  • 7 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 12 Mar 2024Source
  • 1 Disclosure of sold/ booked inventoryCIRCULAR 29 PRAMUKH KRUPA PHASE ONE.pdf · uploaded 15 Mar 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Pramukh Krupa Phase One as on March 2024.pdf · uploaded 10 Apr 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Pramukh Krupa Phase One as on March 2024.pdf · uploaded 12 Apr 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Pramukh Krupa Phase One as on 31st March 24.pdf · uploaded 12 Apr 2024Source
  • 2 Disclosure of sold/ booked inventoryCIRCULAR 29 PRAMUKH KRUPA PHASE ONE.pdf · uploaded 23 May 2024Source
  • 1 Home Buyer /Allottee Grievance Redressal CellDeclaration of Allottee Grievance Redressal Cell Pramukh Krupa Phase One.pdf · uploaded 27 Jun 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Pramukh Krupa Phase One as on June 2024.pdf · uploaded 10 Jul 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Pramukh Krupa Phase One as on 30th June 24.pdf · uploaded 10 Jul 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Pramukh Krupa Phase One as on June 2024 (1).pdf · uploaded 13 Jul 2024Source
  • 3 Disclosure of sold/ booked inventoryCIRCULAR 29 PRAMUKH KRUPA PHASE ONE.pdf · uploaded 24 Jul 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Pramukh Krupa Phase One as on Sept 2024.pdf · uploaded 13 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Pramukh Krupa Phase One as on Sept 2024.pdf · uploaded 13 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Pramukh Krupa Phase One as on 20th September 24.pdf · uploaded 13 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Pramukh Krupa Phase One as on Sept 2024.pdf · uploaded 13 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Pramukh Krupa Phase One as on Sept 2024.pdf · uploaded 13 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Pramukh Krupa Phase One as on 20th September 24.pdf · uploaded 13 Oct 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Pramukh Krupa Phase One as on Sept 2024.pdf · uploaded 13 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Pramukh Krupa Phase One as on Sept 2024.pdf · uploaded 13 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Pramukh Krupa Phase One Sep 2024 (1).pdf · uploaded 14 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Pramukh Krupa Phase One Sep 2024 (1).pdf · uploaded 14 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Pramukh Krupa Phase one for FY 2023-24.pdf · uploaded 21 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Pramukh Krupa Phase one for FY 2023-24.pdf · uploaded 21 Nov 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Pramukh Krupa Phase One as on Sept 2024.pdf · uploaded 9 Dec 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Pramukh Krupa Phase One - 1st December 2024.pdf · uploaded 9 Dec 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Pramukh Krupa Phase One as on Dec 2024.pdf · uploaded 13 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Pramukh Krupa Phase One as on Dec 2024.pdf · uploaded 13 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Pramukh Krupa Phase One as on Dec 2024.pdf · uploaded 13 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 2023-24 Pramukh Krupa Phase One.pdf · uploaded 5 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Dec 2024 Pramukh Krupa Phase One.pdf · uploaded 6 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Phase one.pdf · uploaded 6 Mar 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Pramukh Krupa Phase One as on Dec 2024 (1).pdf · uploaded 6 Mar 2025Source
  • 1 Disclosure of sold/ booked inventoryCircular 29 - Pramukh Krupa Phase One as on Dec-24.pdf · uploaded 6 Mar 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 (FY 2023-24).pdf · uploaded 6 Mar 2025Source
  • 1 Declaration in FORM BForm B (Affidavit cum Declaration).pdf · uploaded 24 Mar 2025Source
  • 1 Disclosure of sold/ booked inventoryCircular 29 - Pramukh Krupa Phase.pdf · uploaded 24 Mar 2025Source
  • 1 Other – TechnicalProject PERT Overview (16).pdf · uploaded 24 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Pramukh Krupa Phase One as on March 2025.pdf · uploaded 18 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Pramukh Krupa Phase One as on March 2025.pdf · uploaded 18 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Pramukh Krupa Phase One as on March 2025.pdf · uploaded 18 Apr 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentPRAMUKH KRUPA CC 16TH UPPER FLOOR.pdf · uploaded 8 May 2025Source
  • 1 Copy of Layout Approval (in case of layout)Plan 1_11zon.pdf · uploaded 12 May 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentPRAMUKH KRUPA CC 16TH UPPER FLOOR.pdf · uploaded 12 May 2025Source
  • Form 1Form 1 - Pramukh Krupa Phase One as on June 2025.pdf · uploaded 6 Sep 2025Source
  • Form 2Form 2 - Pramukh Krupa Phase One as on June 2025.pdf · uploaded 6 Sep 2025Source
  • Form 3Form 3 - Pramukh Krupa Phase One as on June 2025.pdf · uploaded 6 Sep 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Pramukh Krupa Phase One on June 2025.pdf · uploaded 6 Sep 2025Source
  • Form 1Form 1 - Pramukh Krupa Phase One as on Sep 2025.pdf · uploaded 14 Oct 2025Source
  • Form 2Form 2 - Pramukh Krupa Phase One as on Sep 2025.pdf · uploaded 14 Oct 2025Source
  • Form 3Form 3 - Pramukh Krupa Phase One as on Sep 2025.pdf · uploaded 14 Oct 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Pramukh Krupa Phase One as on Sep 2025.pdf · uploaded 14 Oct 2025Source
  • Form 1Form 1 - Pramukh Krupa Phase One as on Dec 2025.pdf · uploaded 23 Jan 2026Source
  • Form 2Form 2 - Pramukh Krupa Phase One as on Dec 2025.pdf · uploaded 23 Jan 2026Source
  • Form 3Form 3 - Pramukh Krupa Phase One as on Dec 2025.pdf · uploaded 23 Jan 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Pramukh Krupa Phase One as on Dec 2025.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 1Form 1 - Pramukh Krupa Phase One June 2026.pdf · uploaded 18 Aug 2026Source
  • Withdrawal Update Form 2Form 2 - Pramukh Krupa Phase One June 2026.pdf · uploaded 18 Aug 2026Source
  • Withdrawal Update Form 3Form 3 - Pramukh Krupa Phase One June 2026.pdf · uploaded 18 Aug 2026Source
  • Form 2A (FY 2023-2024)Form 2A 2023-24 Pramukh Krupa Phase One.pdf · uploaded 18 Aug 2026Source
  • Form 2A (FY 2024-2025)Form 2A 2023-24 Pramukh Krupa Phase One.pdf · uploaded 18 Aug 2026Source
  • Form 2A (FY 2025-2026)Form 2A 2023-24 Pramukh Krupa Phase One.pdf · uploaded 18 Aug 2026Source
  • Form 5 (FY 2023-2024)Form 5 - Pramukh Krupa Phase one for FY 2023-24.pdf · uploaded 18 Aug 2026Source
  • Form 5 (FY 2024-2025)Form 5 - Pramukh Krupa Phase one for FY 2023-24.pdf · uploaded 18 Aug 2026Source
  • Form 5 (FY 2025-2026)Form 5 - Pramukh Krupa Phase one for FY 2023-24.pdf · uploaded 18 Aug 2026Source

Technical

  • Document1 page Pramukh Ph 1_11zon.pdf · uploaded 27 Apr 2023Source
  • Document1-2 pkp1_11zon.pdf · uploaded 16 May 2023Source
  • DocumentPage 3 Pramukh_merged_compressed.pdf · uploaded 19 May 2023Source
  • DocumentPage 5 Pramukh_merged_11zon.pdf · uploaded 19 May 2023Source
  • Document4 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 19 May 2023Source
  • Documentapproval.pdf · uploaded 12 Mar 2024Source
  • Document1_2_3_4_merged.pdf · uploaded 12 Mar 2024Source
  • Document5_6_7_merged.pdf · uploaded 12 Mar 2024Source
  • Document8.pdf · uploaded 12 Mar 2024Source
  • Other – TechnicalProject PERT Overview (16).pdf · uploaded 24 Mar 2025Source
  • DocumentPlan 1_11zon.pdf · uploaded 12 May 2025Source

Technical (Architect)

  • DocumentForm 1 Pramukh Krupa Phase One Sep 2024 (1).pdf · uploaded 14 Oct 2024Source
  • DocumentForm 1 Pramukh Krupa Phase One Sep 2024 (1).pdf · uploaded 14 Oct 2024Source
  • DocumentForm 1 - Pramukh Krupa Phase One as on Sept 2024.pdf · uploaded 9 Dec 2024Source
  • DocumentForm 1 - Dec 2024 Pramukh Krupa Phase One.pdf · uploaded 6 Mar 2025Source
  • DocumentForm 1 - Pramukh Krupa Phase One as on March 2025.pdf · uploaded 18 Apr 2025Source
  • DocumentForm 1 - Pramukh Krupa Phase One June 2026.pdf · uploaded 18 Aug 2026Source

Technical (Engineer)

  • DocumentForm 2 - Pramukh Krupa Phase One as on Sept 2024.pdf · uploaded 13 Oct 2024Source
  • DocumentForm 2 - Pramukh Krupa Phase One as on Sept 2024.pdf · uploaded 13 Oct 2024Source
  • DocumentForm 2 - Pramukh Krupa Phase One as on Dec 2024.pdf · uploaded 13 Jan 2025Source
  • DocumentForm 2 - Pramukh Krupa Phase One as on Dec 2024.pdf · uploaded 13 Jan 2025Source
  • DocumentForm 2 - Pramukh Krupa Phase One as on Dec 2024 (1).pdf · uploaded 6 Mar 2025Source
  • DocumentForm 2 - Pramukh Krupa Phase One as on March 2025.pdf · uploaded 18 Apr 2025Source
  • DocumentForm 2 - Pramukh Krupa Phase One June 2026.pdf · uploaded 18 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Mulund, Kurla taluka

Survey, CTS, gat or plot numbers

1138/1 to 22C.T.S. No. 1138

Boundaries

North
Ganesh Gawade Road
South
CTS No -1160
East
MG Road
West
CTS No -1139

Source: registration certificates and MahaRERA's project page, as stated there.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology