Ostwal Gala Kunj

Certificate Signed

Mulund, Mumbai Suburban 400080 |Promoter: Shree Ostwal Builders Ltd

Residential / Group HousingRERAP51800077808
7 Nov 2024Registered with MahaRERA
31 Dec 2029Promised completion
30 Apr 2030Revised completionPushed back 4 months
1Building
114Units registered0 booked (0%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK, 3BHK, Ptc, REHAB 1BHK, REHAB 2BHK, REHAB 3BHK, REHAB 4BHK, Rehab commercial, Shop114 units in all
Address
Cts No. 1327 And 1327/1 To 5, Dr Babasaheb Ambedkar Road, Mulud (West)PIN 400080
Designated bank account
76
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.17179, 72.95128
Ostwal Gala Kunj is at latitude 19.17179, longitude 72.95128.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
7 Nov 2024
Promised
31 Dec 2029
Revised
30 Apr 2030

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P518000778087 Nov 202431 Dec 202930 Apr 2030Shree Ostwal Builders LtdProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Mulund Galakunj Apartment Chsl16114

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 of 114 units booked (0%), as the promoter reported to MahaRERA

1BHK · 6 units2BHK · 6 units3BHK · 14 unitsPtc · 55 unitsREHAB 1BHK · 2 unitsREHAB 2BHK · 6 unitsREHAB 3BHK · 9 unitsREHAB 4BHK · 1 unitRehab commercial · 14 unitsShop · 1 unit
TypeCarpet areaUnitsBooked
1BHK43.36 sq m · 467 sq ft30
1BHK52.56 sq m · 566 sq ft30
2BHK50.57 sq m · 544 sq ft10
2BHK60.5 sq m · 651 sq ft30
2BHK70.3 sq m · 757 sq ft20
3BHK77.29 sq m · 832 sq ft50
3BHK77.46 sq m · 834 sq ft30
3BHK79.17 sq m · 852 sq ft40
Show all 37 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
3BHK95.02 sq m · 1,023 sq ft20
Ptc27.89 sq m · 300 sq ft50
Ptc27.92 sq m · 301 sq ft150
Ptc27.93 sq m · 301 sq ft100
Ptc27.94 sq m · 301 sq ft50
Ptc27.97 sq m · 301 sq ft50
Ptc27.99 sq m · 301 sq ft100
Ptc28 sq m · 301 sq ft50
REHAB 1BHK37.97 sq m · 409 sq ft20
REHAB 2BHK47.85 sq m · 515 sq ft10
REHAB 2BHK50.57 sq m · 544 sq ft10
REHAB 2BHK52.56 sq m · 566 sq ft10
REHAB 2BHK70.3 sq m · 757 sq ft30
REHAB 3BHK70.43 sq m · 758 sq ft10
REHAB 3BHK71.8 sq m · 773 sq ft20
REHAB 3BHK77.29 sq m · 832 sq ft20
REHAB 3BHK120.41 sq m · 1,296 sq ft20
REHAB 3BHK120.41 sq m · 1,296 sq ft20
REHAB 4BHK77.29 sq m · 832 sq ft10
Rehab commercial20.48 sq m · 220 sq ft10
Rehab commercial33.55 sq m · 361 sq ft40
Rehab commercial35.53 sq m · 382 sq ft20
Rehab commercial35.61 sq m · 383 sq ft20
Rehab commercial40.79 sq m · 439 sq ft10
Rehab commercial44.37 sq m · 478 sq ft10
Rehab commercial63.35 sq m · 682 sq ft10
Rehab commercial80.93 sq m · 871 sq ft10
Rehab commercial97.31 sq m · 1,047 sq ft10
Shop18.67 sq m · 201 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 108 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardSOBL New Pan Card.pdf · uploaded 25 Jun 2024Source
  • Other – FinanceSELF CERTIFICATION_OSTWAL GALA KUNJ_31122024.pdf · uploaded 14 Jan 2025Source
  • OthersFinance Encrumbrance Declaration.pdf · uploaded 14 Jun 2025Source

Legal

  • Legal Title reportTitle Certificate Dipti Nagda 09 02 2024.pdf · uploaded 25 Jun 2024Source
  • Declaration Form BForm B SOBL.pdf · uploaded 25 Jun 2024Source
  • Legal Title reportTitle Certificate 18082024.pdf · uploaded 10 Oct 2024Source
  • OthersTITLE CERTIFICATE 07-05-2025.pdf · uploaded 14 Jun 2025Source
Show all 109 documentsShow fewer documents

Legal

  • OthersRevised Draft Agreement.pdf · uploaded 22 Jul 2025Source

Migrated

  • 1 PAN CardSOBL New Pan Card.pdf · uploaded 25 Jun 2024Source
  • 1 Copy of the legal title reportTitle Certificate Dipti Nagda 09 02 2024.pdf · uploaded 25 Jun 2024Source
  • 1 a Details of encumbrances concerned to FinanceFinancial Encrumbrance Certificate.pdf · uploaded 25 Jun 2024Source
  • 2 a Details of encumbrances concerned to FinanceLegal and Litigation Encrumbrance.pdf · uploaded 25 Jun 2024Source
  • 1 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 25 Jun 2024Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 25 Jun 2024Source
  • 1 Declaration in FORM BForm B SOBL.pdf · uploaded 25 Jun 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM -1 ARCHITECT CERTIFICATE_Signed.pdf · uploaded 25 Jun 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Eng Certificate Gala Kunj.pdf · uploaded 25 Jun 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC Plinth level 18 12 2023.pdf · uploaded 25 Jun 2024Source
  • 7 Building Plan Approval / NA Order for plotted developmentPlan No 8.pdf · uploaded 25 Jun 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentPlan No 2.pdf · uploaded 25 Jun 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentPlan No 3.pdf · uploaded 25 Jun 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentPlan No 4.pdf · uploaded 25 Jun 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentPlan No 5.pdf · uploaded 25 Jun 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentPlan No 6.pdf · uploaded 25 Jun 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentPlan No 7.pdf · uploaded 25 Jun 2024Source
  • 8 Building Plan Approval / NA Order for plotted developmentTemprary Plan Site Godown.pdf · uploaded 25 Jun 2024Source
  • 1 Declaration about Commencement CertificateDeclaration about Commencement Certificate.pdf · uploaded 25 Jun 2024Source
  • 1 CERSAI detailsCERSAI_Search_Report_200311346910_For_Asset_Based_Search_25_06_2024_14_11_45_946.pdf · uploaded 25 Jun 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A_Separate Bank Account.pdf · uploaded 25 Jun 2024Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report_Allotment Letter.pdf · uploaded 25 Jun 2024Source
  • 2 b Details of encumbrances concerned to LegalLegal and Litigation Encrumbrance.pdf · uploaded 25 Jun 2024Source
  • 1 b Details of encumbrances concerned to LegalFinancial Encrumbrance Certificate.pdf · uploaded 25 Jun 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report_Agr for Sale.pdf · uploaded 25 Jun 2024Source
  • 1 Proforma of Agreement for saleDraft Agreement_11zon.pdf · uploaded 25 Jun 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSER OF INTEREST.pdf · uploaded 25 Jun 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_11zon.pdf · uploaded 13 Aug 2024Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samePromoter BANK letterhead_gala kunj.pdf · uploaded 13 Aug 2024Source
  • 1 Other – TechnicalOrder_57_Amenities.pdf · uploaded 13 Aug 2024Source
  • 2 Other – TechnicalOrdeNo54 .pdf · uploaded 13 Aug 2024Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Bank letter_Galakunj (1).pdf · uploaded 13 Aug 2024Source
  • 1 Disclosure for secured/unsecured finance availed for the projectDisclosure of Secured Unsecured.pdf · uploaded 13 Aug 2024Source
  • 2 Copy of the legal title reportTitle Certificate 18082024.pdf · uploaded 10 Oct 2024Source
  • 3 a Details of encumbrances concerned to FinanceFinancial Encrumbrance Certificate New.pdf · uploaded 10 Oct 2024Source
  • 2 Proforma of Allotment letterAllotment Letter New.pdf · uploaded 10 Oct 2024Source
  • 2 CERSAI detailsCersai Undertaking.pdf · uploaded 10 Oct 2024Source
  • 3 b Details of encumbrances concerned to LegalFinancial Encrumbrance Certificate New.pdf · uploaded 10 Oct 2024Source
  • 3 Other – TechnicalAnnexure A_DEclaration Cum Undertaking.pdf · uploaded 10 Oct 2024Source
  • 2 Proforma of Agreement for saleDraft Agreement New.pdf · uploaded 10 Oct 2024Source
  • 2 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B_from Bank.pdf · uploaded 10 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 _GALA KUNJ 13082024.pdf · uploaded 14 Oct 2024Source
  • 3 CERSAI detailsGetUserDocumentFileContent.pdf · uploaded 14 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 22102024.pdf · uploaded 22 Oct 2024Source
  • 4 CERSAI detailsCERSAI UNDERTAKING 22102024.pdf · uploaded 22 Oct 2024Source
  • 3 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Bank Letter Head Format B 22102024.pdf · uploaded 22 Oct 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 22102024 REVISED.pdf · uploaded 29 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD_OSTWAL GALAKUNJ_31122024.pdf · uploaded 14 Jan 2025Source
  • 1 Other – FinanceSELF CERTIFICATION_OSTWAL GALA KUNJ_31122024.pdf · uploaded 14 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A_OSTWAL GALA KUNJ_31122024.pdf · uploaded 14 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A_March-25_Galakunj.pdf · uploaded 16 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold_31032025-Gala Kunj.pdf · uploaded 17 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Self Certification Form-3 _31032025 _Gala Kunj.pdf · uploaded 18 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 30092024-GALA KUNJ .pdf · uploaded 21 Apr 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 31122024-GALA KUNJ .pdf · uploaded 21 Apr 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 31032025-GALA KUNJ .pdf · uploaded 21 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30092024- GALA KUNJ.pdf · uploaded 21 Apr 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31122024- GALA KUNJ.pdf · uploaded 21 Apr 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31032025- GALA KUNJ.pdf · uploaded 21 Apr 2025Source
  • Withdrawal Update Form 1FORM 1 _ 30062025.pdf · uploaded 22 Sep 2025Source
  • Withdrawal Update Form 2Form-2_30062025_Gala Kunj.pdf · uploaded 22 Sep 2025Source
  • Withdrawal Update Form 3Form 3 30062025_Galakunj.pdf · uploaded 22 Sep 2025Source
  • Withdrawal Update Form 1FORM 1 _ 30062025.pdf · uploaded 26 Sep 2025Source
  • Withdrawal Update Form 2Form-2_30062025_Gala Kunj.pdf · uploaded 26 Sep 2025Source
  • Withdrawal Update Form 3Form 3 30062025_Galakunj.pdf · uploaded 26 Sep 2025Source
  • Form 5 (FY 2024-2025)FORM 5 GALAKUNJ-2024-2025.pdf · uploaded 29 Sep 2025Source
  • Withdrawal Update Form 1FORM-1_OSTWAL GALAKUNJ_30092025.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 2FORM-2_OSTWAL GALAKUNJ_30092025.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 3Form-3_Ostwal Galakunj_30092025.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 1Form 1_Ostwal Galakunj_31122025.pdf · uploaded 22 Apr 2026Source
  • Withdrawal Update Form 2FORM-2_GALAKUNJ_31122025.pdf · uploaded 22 Apr 2026Source
  • Withdrawal Update Form 3Form 3_GalaKunj_31122025.pdf · uploaded 22 Apr 2026Source
  • Withdrawal Update Form 1Form 1_Galakunj_31032026.pdf · uploaded 11 Aug 2026Source
  • Withdrawal Update Form 2Form 2_Galakunj_31032026.pdf · uploaded 11 Aug 2026Source
  • Withdrawal Update Form 3Form-3_Galakunj_31032026.pdf · uploaded 11 Aug 2026Source
  • Withdrawal Update Form 1Form 1_Galakunj_30062026.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 2Form-2_Galakunj_30062026.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 3Form-3_Galakunj_30062026.pdf · uploaded 12 Aug 2026Source

Technical

  • DocumentTemprary Plan Site Godown.pdf · uploaded 25 Jun 2024Source
  • DocumentPlan No 8.pdf · uploaded 25 Jun 2024Source
  • DocumentPlan No 7.pdf · uploaded 25 Jun 2024Source
  • DocumentPlan No 6.pdf · uploaded 25 Jun 2024Source
  • DocumentPlan No 5.pdf · uploaded 25 Jun 2024Source
  • DocumentPlan No 4.pdf · uploaded 25 Jun 2024Source
  • DocumentPlan No 3.pdf · uploaded 25 Jun 2024Source
  • DocumentPlan No 2.pdf · uploaded 25 Jun 2024Source
  • DocumentLAYOUT.pdf · uploaded 25 Jun 2024Source
  • Other – TechnicalOrdeNo54 .pdf · uploaded 13 Aug 2024Source
  • Other – TechnicalOrder_57_Amenities.pdf · uploaded 13 Aug 2024Source
  • Other – TechnicalAnnexure A_DEclaration Cum Undertaking.pdf · uploaded 10 Oct 2024Source
  • DocumentAnnexure A_DEclaration Cum Undertaking.pdf · uploaded 19 Jun 2025Source
  • DocumentCC upto 16th floor.pdf · uploaded 13 Mar 2026Source

Technical (Architect)

  • DocumentFORM 1 30092024-GALA KUNJ .pdf · uploaded 21 Apr 2025Source
  • DocumentFORM 1 31122024-GALA KUNJ .pdf · uploaded 21 Apr 2025Source
  • DocumentFORM 1 31032025-GALA KUNJ .pdf · uploaded 21 Apr 2025Source
  • DocumentForm 1_Galakunj_30062026.pdf · uploaded 12 Aug 2026Source

Technical (Engineer)

  • DocumentFORM 2 30092024- GALA KUNJ.pdf · uploaded 21 Apr 2025Source
  • DocumentFORM 2 31122024- GALA KUNJ.pdf · uploaded 21 Apr 2025Source
  • DocumentFORM 2 31032025- GALA KUNJ.pdf · uploaded 21 Apr 2025Source
  • DocumentForm-2_Galakunj_30062026.pdf · uploaded 12 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Mulund, Kurla taluka

Survey, CTS, gat or plot numbers

1327/1 TO 5CTS NO. 1327

Boundaries

North
Dr Babasaheb Ambedkar Road
South
Cts No 1348-A
East
Pandit Jawaharlal Nehru Road
West
Cts No 1326 And 1335

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDesign Crest Axiom—
Chartered accountantAbhishek Surana & Co—
Chartered accountantKhurdia Jain & Co—
EngineerBhavesh Bhalchandra Todankar—
EngineerDestech Structural Consultant—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology