Shraddha Paradise

Active

Magathane, Mumbai Suburban 400092 |Promoter: Shraddha Prime Projects Limited

Residential / Group HousingRERAP51800052244
2 Aug 2023Registered with MahaRERA
31 Dec 2028Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
1
Land area for this project
8,114 sq m (87,343 sq ft)
Permissible built-up area
26,165 sq m (2,81,637 sq ft)
Sanctioned built-up area
26,148 sq m (2,81,456 sq ft)
Planning authority
MCGM
Address
63/2, 3(pt.), 4, 5, 7, 10(pt.), Kosamgo Nagar Road, BorivaliPIN 400092
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.22058, 72.85366
Shraddha Paradise is at latitude 19.22058, longitude 72.85366.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2028

Registered
2 Aug 2023
Promised
31 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P518000522442 Aug 202331 Dec 2028—Shraddha Prime Projects LimitedProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A and Wing B35—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered035000350
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Wing A and Wing B

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor30%
  • Slabs of Super Structure30%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises8%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyConnection from MCGM after completion0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)STP tank provided0%
  • Storm Water DrainsAs per approved plan0%
  • Landscaping & Tree PlantingAs per approved plan0%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterIn later scope of work0%
  • Solid Waste Management And DisposalIn later scope of work0%
  • Water conservation /Rain water harvestingAs per approved plan0%
  • Energy managemcntAs per approved plan0%
  • Fire protection and fire safety requirementsFire tank to be provided as per CFO NOC0%
  • Electrical meter room, sub-station, receiving stationElectric Meter Room and Sub Station0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

93 documents held by Deedo, 95 filings listed on MahaRERA's project page

Other (92)

Show all 188 documentsShow fewer documents

Other (92)

Registration certificate

Document library

  • Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 28 Jun 2023View
  • a Details of encumbrances concerned to FinanceEncumbrance Letter - Finance.pdf · uploaded 28 Jun 2023View
  • a Details of encumbrances concerned to FinanceEncumbrance Letter - Legal.pdf · uploaded 28 Jun 2023View
  • b Details of encumbrances concerned to LegalEncumbrance Letter - Finance.pdf · uploaded 28 Jun 2023View
  • b Details of encumbrances concerned to LegalEncumbrance Letter - Legal.pdf · uploaded 28 Jun 2023View
  • Declaration about Commencement CertificateFormat D.pdf · uploaded 28 Jun 2023View
  • Declaration in FORM BFORM -B (Promoter).pdf · uploaded 28 Jun 2023View
  • CERSAI detailsDECLARATION of Cersai.pdf · uploaded 28 Jun 2023View
  • Deviation Report with respect to Allotment letterDEVIATION REPORT - Allotment.pdf · uploaded 28 Jun 2023View
  • Deviation Report with respect to model copy of AgreementDEVIATION REPORT - AFS.pdf · uploaded 28 Jun 2023View
  • Copy of the legal title reportShort Title - Shraddha Paradise.pdf · uploaded 12 Jul 2023View
  • Proforma of Agreement for saleAFS_Shraddha paradise11072023.pdf · uploaded 12 Jul 2023View
  • Proforma of Allotment letterAL_Shraddha paradise11072023.pdf · uploaded 12 Jul 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 12 Jul 2023View
  • Copy of Layout Approval (in case of layout)Approved IOD Layout 04052023.pdf · uploaded 12 Jul 2023View
  • Building Plan Approval / NA Order for plotted developmentApproved IOD Layout 04052023.pdf · uploaded 12 Jul 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A_11zon.pdf · uploaded 27 Jul 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 of Shraddha Paradise as on Sept 2023.pdf · uploaded 4 Dec 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Shraddha Paradise as on Sep 2023.pdf · uploaded 7 Dec 2023View
  • Copy of Layout Approval (in case of layout)2389609Amendletter_signed.pdf · uploaded 15 Dec 2023View
  • Building Plan Approval / NA Order for plotted developmentDrawingF.pdf · uploaded 15 Dec 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 of Shraddha Paradise as on Dec 2023.pdf · uploaded 20 Jan 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Shraddha Paradise as on Dec 2023.pdf · uploaded 1 Feb 2024View
  • Proforma of Agreement for salePARADISE_AFS.pdf · uploaded 23 Feb 2024View
  • Commencement Certificates / NA Order for plotted development2399833_FirstCC_signed.pdf · uploaded 6 Mar 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (7).pdf · uploaded 20 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (9).pdf · uploaded 20 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Shraddha Paradise as on March 2024.pdf · uploaded 31 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 of Shraddha Paradise as on June 2024.pdf · uploaded 18 Jul 2024View
  • Commencement Certificates / NA Order for plotted developmentCC - Shraddha Paradise.pdf · uploaded 27 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Shraddha Paradise as on March 2024.pdf · uploaded 7 Aug 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Shraddha Paradise as on June 2024.pdf · uploaded 7 Aug 2024View
  • a Details of encumbrances concerned to FinanceShraddha Paradise_RERA.pdf · uploaded 11 Oct 2024View
  • b Details of encumbrances concerned to LegalShraddha Paradise_RERA.pdf · uploaded 11 Oct 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Shraddha Paradise FY 2023-24.pdf · uploaded 30 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Shraddha Paradise as on Sep 2024.pdf · uploaded 9 Nov 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Shraddha Paradise as on Sep 2024.pdf · uploaded 23 Nov 2024View
  • Disclosure of sold/ booked inventorysh paradise_0001_5_11zon.pdf · uploaded 10 Dec 2024View
  • Proforma of Agreement for saleDRAFT_AFS_PARADISE.pdf · uploaded 31 Dec 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Shraddha Paradise as on Dec 2024.pdf · uploaded 14 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Shraddha Paradise as on March 2025.pdf · uploaded 10 May 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Shraddha Paradise as on March 2025.pdf · uploaded 10 May 2025View
  • Form 1Form 1 - Shraddha Paradise as on June 2025.pdf · uploaded 11 Sep 2025View
  • Form 2Form 2 - Shraddha Paradise as on June 2025.pdf · uploaded 11 Sep 2025View
  • Disclosure of Sold and Booked InventoryCircular 29 - Shraddha Paradise as on June 2025.pdf · uploaded 11 Sep 2025View
  • Withdrawal Update Form 1Form 1 - Shraddha Paradise as on Sept 2025.pdf · uploaded 12 Jan 2026View
  • Withdrawal Update Form 2Form 2 - Shraddha Paradise as on Sept 2025.pdf · uploaded 12 Jan 2026View
  • Withdrawal Update Form 1Form 1 of Shraddha Paradise as on Dec 2025.pdf · uploaded 25 Feb 2026View
  • Withdrawal Update Form 2Form 2 - Shraddha Paradise as on Dec 2025.pdf · uploaded 25 Feb 2026View
  • Form 5 (FY 2023-2024)Form 5 Shraddha Paradise FY 2023-24.pdf · uploaded 5 Mar 2026View
  • Form 5 (FY 2024-2025)Form 5 - Shraddha Paradise for FY 2024-25.pdf · uploaded 11 Mar 2026View
  • Withdrawal Update Form 1Form 1 - Shraddha Paradise as on March 2026.pdf · uploaded 23 May 2026View
  • Withdrawal Update Form 2Form 2 - Shraddha Paradise as on March 2026.pdf · uploaded 23 May 2026View
  • Form 2A (FY 2023-2024)Form 2A - Shraddha Paradise for FY 2023-24.pdf · uploaded 18 Jun 2026View
  • Form 2A (FY 2024-2025)Form 2A - Shraddha Paradise for FY 2024-25.pdf · uploaded 18 Jun 2026View
  • Form 2A (FY 2025-2026)FORM 2A FY 25-26 SHRADDHA PARADISE.pdf · uploaded 2 Jul 2026View
  • Withdrawal Update Form 1Form - 1 Shraddha Paradise June 2026.pdf · uploaded 14 Aug 2026View
  • Withdrawal Update Form 2Form 2 - Shraddha Paradise June 2026.pdf · uploaded 14 Aug 2026View

Promoter documents

  • Declaration Form BFORM -B (Promoter).pdf · uploaded 28 Jun 2023View
  • Legal Title reportShort Title - Shraddha Paradise.pdf · uploaded 12 Jul 2023View

Technical documents

  • Layout Approval2389609Amendletter_signed.pdfView
  • Building Plan ApprovalDrawingF.pdfView
  • Layout ApprovalApproved IOD Layout 04052023.pdfView
  • Building Plan ApprovalApproved IOD Layout 04052023.pdfView
  • Layout ApprovalLayout.pdfView
  • Building Plan ApprovalLayout.pdfView
  • Building Plan Approval3 Podiums.pdfView
  • Building Plan Approval1st 2nd and 3rd Floor.pdfView
  • Building Plan Approval4th (Refuge) and 5th Floor.pdfView
  • Building Plan Approval6th 7th and 8th Floors.pdfView
  • Building Plan Approval9th 10th 12th to 17th 19th to 24th 26th to 30th and 31st.pdfView
  • Building Plan Approval11th 18th and 25th Refuge Floors.pdfView
  • Building Plan Approval8th page.pdfView
  • Building Plan Approval9th Page.pdfView
  • Building Plan Approval10th Page.pdfView
  • Building Plan Approval11th Page.pdfView
  • Building Plan Approval12th Page.pdfView
  • Building Plan Approval13th Page.pdfView
  • Building Plan Approval14th Page.pdfView
  • Layout ApprovalBorivali Amended IOD Drawing 18 09 2023-1.pdfView
  • Building Plan ApprovalBorivali Amended IOD Drawing 18 09 2023-2.pdfView
  • Building Plan ApprovalBorivali Amended IOD Drawing 18 09 2023-3.pdfView
  • Building Plan ApprovalBorivali Amended IOD Drawing 18 09 2023-4.pdfView
  • Building Plan ApprovalBorivali Amended IOD Drawing 18 09 2023-5.pdfView
  • Building Plan ApprovalBorivali Amended IOD Drawing 18 09 2023-6.pdfView
  • Building Plan ApprovalBorivali Amended IOD Drawing 18 09 2023-7.pdfView
  • Building Plan ApprovalBorivali Amended IOD Drawing 18 09 2023-8.pdfView
  • Building Plan ApprovalBorivali Amended IOD Drawing 18 09 2023-9.pdfView
  • Building Plan ApprovalBorivali Amended IOD Drawing 18 09 2023-10.pdfView
  • Building Plan ApprovalBorivali Amended IOD Drawing 18 09 2023-11.pdfView
  • Building Plan ApprovalBorivali Amended IOD Drawing 18 09 2023-12.pdfView
  • Building Plan ApprovalBorivali Amended IOD Drawing 18 09 2023-13.pdfView
  • Building Plan ApprovalBorivali Amended IOD Drawing 18 09 2023-14.pdfView

Commencement certificates and NA orders

  • Commencement certificate / NA orderSource

Proforma allotment letter

  • Proforma allotment letterAL_Shraddha paradise11072023.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Magathane, Borivali taluka

Survey, CTS, gat or plot numbers

10(pt.)3(pt.)4563/27

As published on MahaRERA's project page

63/2,3(pt.),4,5,7,10(pt.)

Boundaries

North
13 Meter Wide Sanctioned RL by AE Survey Road
South
Hari Om Nagar
East
Western Railway DT4 Railway Yards-Tracks
West
18 Meter DP Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSagar Makhela—
Chartered accountantNB Sayed & Associates—
Chartered accountantRutuja Narsingh & Associates—
EngineerRajendra Bankar—
EngineerSK Consultants & Engineers—

Source: MahaRERA project page. Contact details are not shown.