Samara
Certificate SignedKurla, Maharashtra 400071 |Promoter: Charisma Builders Ltd
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1BHK, 2BHK, Office space, Shop 1, Shop 2, Shop 3, Shop4, Shop5, Shop654 units in all
- Address
- Plot No. 10, CTS No. 368 pt, 369, 369/1-2, Village Chembur, V. N. Purav Marg, Mumbai - 400071, V. N. Purav Marg, Chembur, MumbaiPIN 400071
- Designated bank account
- 171
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 7 months
The latest completion date on record passed 2 years ago.
- Registered
- 15 May 2019
- Promised
- 30 Mar 2024
- Revised
- 31 Oct 2024
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51800020854 | 15 May 2019 | 30 Mar 2024 | 31 Oct 2024 | Charisma Builders Ltd | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Resi and commercial building | 15 | 54 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
54 of 54 units booked (100%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 778.52 sq m · 8,380 sq ft | 20 | 20 |
| 2BHK | 1,867.15 sq m · 20,098 sq ft | 26 | 26 |
| Office space | 73.19 sq m · 788 sq ft | 1 | 1 |
| Office space | 73.19 sq m · 788 sq ft | 1 | 1 |
| Shop 1 | 69.85 sq m · 752 sq ft | 1 | 1 |
| Shop 2 | 31.8 sq m · 342 sq ft | 1 | 1 |
| Shop 3 | 31.01 sq m · 334 sq ft | 1 | 1 |
| Shop4 | 27.62 sq m · 297 sq ft | 1 | 1 |
| Shop5 | 27.19 sq m · 293 sq ft | 1 | 1 |
| Shop6 | 27.97 sq m · 301 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 149 filings listed on MahaRERA's project page
Finance
- PAN CardCBL PAN.pdf · uploaded 18 Apr 2019Source
Legal
Migrated
- 1 PAN CardCBL PAN.pdf · uploaded 18 Apr 2019Source
Show all 151 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportCertificate -On -Title2.pdf · uploaded 18 Apr 2019Source
- 1 Building Plan Approval (IOD)IOD.pdf · uploaded 18 Apr 2019Source
- 2 Building Plan Approval (IOD)IOD.pdf · uploaded 18 Apr 2019Source
- 1 Details of encumbrancesEncumbrance Certificate.pdf · uploaded 24 Apr 2019Source
- 1 Copy of Layout Approval (in case of layout)Declaration on Layout.pdf · uploaded 24 Apr 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentFirstCC_signed.pdf · uploaded 24 Apr 2019Source
- 1 Declaration in FORM BForm B.pdf · uploaded 24 Apr 2019Source
- 1 Certificates of CA (Form 3)samara form 3.pdf · uploaded 7 May 2019Source
- 1 Proforma of Allotment letterDraft ALLOTMENT LETTER.pdf · uploaded 7 May 2019Source
- 2 Proforma of Allotment letterDraft AGREEMENT FOR SALE.pdf · uploaded 7 May 2019Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect's Certificate 30-06-19.pdf · uploaded 7 Aug 2019Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2 Engineer's Certificate 30-06-19.pdf · uploaded 7 Aug 2019Source
- 2 Certificates of CA (Form 3)Form-3.pdf · uploaded 10 Aug 2019Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Form-1.pdf · uploaded 11 Nov 2019Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form-2.pdf · uploaded 11 Nov 2019Source
- 3 Certificates of CA (Form 3)RERA Form-3.pdf · uploaded 11 Nov 2019Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)RERA Form-2A.pdf · uploaded 18 Jan 2020Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement Certificate of samara upto 6th floor.pdf · uploaded 8 Feb 2020Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Commencement Certificate of samara upto 6th floor.pdf · uploaded 8 Feb 2020Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Dec 19.pdf · uploaded 15 Feb 2020Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Dec-2019.pdf · uploaded 15 Feb 2020Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Dec-2019.pdf · uploaded 15 Feb 2020Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2 Dec-2019.pdf · uploaded 15 Feb 2020Source
- 4 Certificates of CA (Form 3)Form 3 Dec19.pdf · uploaded 15 Feb 2020Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)SAMARA RERA Form1 Mar2020.pdf · uploaded 11 Aug 2020Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)SAMARA RERA Form2 Mar20.pdf · uploaded 11 Aug 2020Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)SAMARA RERA Form2A Mar20.pdf · uploaded 11 Aug 2020Source
- 5 Certificates of CA (Form 3)SAMARA RERA Form3 Mar2020.pdf · uploaded 11 Aug 2020Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)SAMARA RERA Form1.pdf · uploaded 28 Sep 2020Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form2 Jun20.pdf · uploaded 28 Sep 2020Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Jun20.pdf · uploaded 28 Sep 2020Source
- 6 Certificates of CA (Form 3)Form 3 Jun2020 (1).pdf · uploaded 28 Sep 2020Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1_Sep20.pdf · uploaded 30 Jan 2021Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form - 2.pdf · uploaded 30 Jan 2021Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form - 2 A.pdf · uploaded 30 Jan 2021Source
- 7 Certificates of CA (Form 3)SAMARA RERA Form-3 30-09-20.pdf · uploaded 2 Feb 2021Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect's Certificate Form - 1.pdf · uploaded 27 Feb 2021Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)fORM 2.pdf · uploaded 27 Feb 2021Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)fORM 2A.pdf · uploaded 27 Feb 2021Source
- 8 Certificates of CA (Form 3)Form 3 final.pdf · uploaded 27 Feb 2021Source
- 1 Declaration about Commencement CertificateCC dated 31052021.pdf · uploaded 28 Jun 2021Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 28 Jun 2021Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_compressed.pdf · uploaded 28 Jun 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 28 Jun 2021Source
- 9 Certificates of CA (Form 3)Final RERA Form3 Mar21.pdf · uploaded 28 Jun 2021Source
- 1 Disclosure of sold/ booked inventoryProject Status as of Mar-21.pdf · uploaded 29 Jun 2021Source
- 3 Commencement Certificates / NA Order for plotted developmentCC dated 31052021.pdf · uploaded 11 Aug 2021Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form-1 Jun21 Quarter.pdf · uploaded 11 Aug 2021Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2.pdf · uploaded 11 Aug 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form-2A.pdf · uploaded 11 Aug 2021Source
- 10 Certificates of CA (Form 3)Form-3.pdf · uploaded 11 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5.pdf · uploaded 5 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)form 5 for 2020-2021_compressed.pdf · uploaded 5 Oct 2021Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 18 Oct 2021Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 18 Oct 2021Source
- 7 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A.pdf · uploaded 18 Oct 2021Source
- 11 Certificates of CA (Form 3)Form-3.pdf · uploaded 18 Oct 2021Source
- 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 9 Mar 2022Source
- 12 Certificates of CA (Form 3)FORM - 3 Dec-21_compressed (2).pdf · uploaded 9 Mar 2022Source
- 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 10 Mar 2022Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 10 Mar 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 10 Mar 2022Source
- 2 Disclosure of sold/ booked inventoryDisclousre as on Dec 2021.pdf · uploaded 24 Jun 2022Source
- 3 Disclosure of sold/ booked inventoryDisclousre AS on Mar 2022.pdf · uploaded 24 Jun 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)CBL letter to SICH.pdf · uploaded 24 Jun 2022Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)Letter Received From SICHS.pdf · uploaded 24 Jun 2022Source
- 13 Certificates of CA (Form 3)FORM 3 Mar 22.pdf · uploaded 25 Jun 2022Source
- 14 Certificates of CA (Form 3)FORM 3 Mar 22.pdf · uploaded 25 Jun 2022Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 29 Jun 2022Source
- 1 CERSAI detailsUndertaking 2022.pdf · uploaded 29 Jun 2022Source
- 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form-1.pdf · uploaded 30 Aug 2022Source
- 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2.pdf · uploaded 30 Aug 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 30 Aug 2022Source
- 4 Disclosure of sold/ booked inventoryDisclosure Jun-22.pdf · uploaded 30 Aug 2022Source
- 15 Certificates of CA (Form 3)Form-3_compressed (2).pdf · uploaded 30 Aug 2022Source
- 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Sep-22.pdf · uploaded 22 Nov 2022Source
- 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Sep-22.pdf · uploaded 22 Nov 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A.pdf · uploaded 22 Nov 2022Source
- 5 Disclosure of sold/ booked inventoryDisclosure Sept 2022.pdf · uploaded 22 Nov 2022Source
- 16 Certificates of CA (Form 3)Form 3 Sep-22_compressed.pdf · uploaded 22 Nov 2022Source
- 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate ( Form 1 ).pdf · uploaded 6 Feb 2023Source
- 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Dec-22.pdf · uploaded 6 Feb 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Dec-22.pdf · uploaded 6 Feb 2023Source
- 6 Disclosure of sold/ booked inventoryDisclosure Dec-22.pdf · uploaded 6 Feb 2023Source
- 17 Certificates of CA (Form 3)Form 3 Dec-22 compressed.pdf · uploaded 6 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 FY 2021 22.pdf · uploaded 18 Mar 2023Source
- 1 Proforma of Agreement for saleDraft AGREEMENT FOR SALE.pdf · uploaded 18 Mar 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in other RERA Projects.pdf · uploaded 10 Apr 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration of Separate Bank Account.pdf · uploaded 11 Apr 2023Source
- 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Mar 23.pdf · uploaded 17 May 2023Source
- 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Mar 23.pdf · uploaded 17 May 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Mar-23.pdf · uploaded 17 May 2023Source
- 7 Disclosure of sold/ booked inventoryDisclosure 31-03-2023.pdf · uploaded 17 May 2023Source
- 18 Certificates of CA (Form 3)Form 3 Mar23.pdf · uploaded 17 May 2023Source
- 3 Building Plan Approval (IOD)Approved Drawing_11zon_11zon.pdf · uploaded 29 Jul 2023Source
- 4 Building Plan Approval (IOD)Approved Amended Letter.pdf · uploaded 29 Jul 2023Source
- 4 Commencement Certificates / NA Order for plotted development2386725_FurtherCC_signed (1).pdf · uploaded 29 Jul 2023Source
- 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 29 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 29 Jul 2023Source
- 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 31 Jul 2023Source
- 8 Disclosure of sold/ booked inventoryDisclosure June 23.pdf · uploaded 31 Jul 2023Source
- 19 Certificates of CA (Form 3)Form 3 compressed.pdf · uploaded 2 Aug 2023Source
- 20 Certificates of CA (Form 3)Form-3 Sep 23.pdf · uploaded 6 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5.pdf · uploaded 5 Jan 2024Source
- 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1.pdf · uploaded 29 Jan 2024Source
- 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2 Sep 23.pdf · uploaded 29 Jan 2024Source
- 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 29 Jan 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form-2A Sep 23.pdf · uploaded 29 Jan 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 29 Jan 2024Source
- 9 Disclosure of sold/ booked inventoryDisclosure Sep 23.pdf · uploaded 29 Jan 2024Source
- 10 Disclosure of sold/ booked inventoryDisclosure Dec-23.pdf · uploaded 29 Jan 2024Source
- 21 Certificates of CA (Form 3)Form 3.pdf · uploaded 29 Jan 2024Source
- 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1 Mar-24.pdf · uploaded 2 Apr 2024Source
- 11 Disclosure of sold/ booked inventoryDisclosure Mar-24.pdf · uploaded 2 Apr 2024Source
- 5 Building Plan Approval (IOD)Approved Drawing 1.pdf · uploaded 13 Apr 2024Source
- 6 Building Plan Approval (IOD)Approved Drawing 2 and 3.pdf · uploaded 13 Apr 2024Source
- 2 Declaration about Commencement CertificateForm D.pdf · uploaded 13 Apr 2024Source
- 2 Declaration in FORM BForm B.pdf · uploaded 13 Apr 2024Source
- 22 Certificates of CA (Form 3)Samara RERA From-3.pdf · uploaded 12 Jun 2024Source
- 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Mar-24.pdf · uploaded 18 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Mar-24.pdf · uploaded 18 Jun 2024Source
- 3 Declaration about Commencement CertificateForm D.pdf · uploaded 8 Aug 2024Source
- 3 Declaration in FORM BForm B.pdf · uploaded 8 Aug 2024Source
- 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Jun-24.pdf · uploaded 8 Aug 2024Source
- 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Jun24.pdf · uploaded 8 Aug 2024Source
- 12 Disclosure of sold/ booked inventoryDisclousre Jun 2024.pdf · uploaded 8 Aug 2024Source
- 23 Certificates of CA (Form 3)Form 3 compressed.pdf · uploaded 8 Aug 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Jun-24.pdf · uploaded 21 Jan 2025Source
- 1 Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 21 Jan 2025Source
- 1 Certificates of CA (Form 3)Form 3 Sep-24.pdf · uploaded 21 Jan 2025Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC 120924.pdf · uploaded 21 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure Sep-24.pdf · uploaded 21 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5.pdf · uploaded 21 Jan 2025Source
Technical
- DocumentIOD.pdf · uploaded 18 Apr 2019Source
- DocumentIOD.pdf · uploaded 18 Apr 2019Source
- DocumentDeclaration on Layout.pdf · uploaded 24 Apr 2019Source
- DocumentApproved Drawing_11zon_11zon.pdf · uploaded 29 Jul 2023Source
- DocumentApproved Amended Letter.pdf · uploaded 29 Jul 2023Source
- DocumentApproved Drawing 1.pdf · uploaded 13 Apr 2024Source
- DocumentApproved Drawing 2 and 3.pdf · uploaded 13 Apr 2024Source
Technical (Architect)
Technical (Engineer)
- DocumentForm 2 Jun24.pdf · uploaded 8 Aug 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Kurla, Kurla taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Ekvira Highschool
- South
- 36 mtr V N Purav Marg
- East
- Chembur Ganesh Society
- West
- 12 mtr wide internal road
Source: registration certificates and MahaRERA's project page, as stated there.