NCLT insolvency listingKurla, Maharashtra 400022 |Promoter: Snehanjali and S.B.Developers Pvt.Ltd.
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 6
- Unit types
- 2BHK, 3BHK310 units in all
- Address
- C S No 475pt, Null, NullPIN 400022
- Designated bank account
- 109
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 3 years and 9 months
The latest completion date on record passed 7 months ago.
- Registered
- 19 Aug 2017
- Promised
- 30 Jun 2022
- Revised
- 4 Mar 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51800008513 | 19 Aug 2017 | 30 Jun 2022 | 4 Mar 2026 | Snehanjali and S.B.Developers Pvt.Ltd. | Project page |
6 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| O2 Wing A | 19 | 62 |
| O2 Wing B | 19 | 32 |
| O2 Wing C | 19 | 61 |
| O2 Wing D | 19 | 61 |
| O2 Wing E | 19 | 32 |
| O2 Wing F | 19 | 62 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
297 of 310 units booked (96%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| O2 Wing A | 2BHK | 63.75 sq m · 686 sq ft | 4 | 4 |
| O2 Wing A | 2BHK | 64.72 sq m · 697 sq ft | 3 | 3 |
| O2 Wing A | 2BHK | 64.8 sq m · 698 sq ft | 25 | 25 |
| O2 Wing A | 2BHK | 74.27 sq m · 799 sq ft | 3 | 3 |
| O2 Wing A | 2BHK | 76.23 sq m · 821 sq ft | 13 | 13 |
| O2 Wing A | 2BHK | 76.54 sq m · 824 sq ft | 14 | 14 |
| O2 Wing B | 2BHK | 94.9 sq m · 1,021 sq ft | 13 | 13 |
| O2 Wing B | 3BHK | 93.53 sq m · 1,007 sq ft | 2 | 2 |
Show all 31 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| O2 Wing B | 3BHK | 95.18 sq m · 1,025 sq ft | 17 | 17 |
| O2 Wing C | 2BHK | 69.11 sq m · 744 sq ft | 6 | 6 |
| O2 Wing C | 2BHK | 69.62 sq m · 749 sq ft | 10 | 8 |
| O2 Wing C | 2BHK | 69.88 sq m · 752 sq ft | 13 | 12 |
| O2 Wing C | 2BHK | 74.27 sq m · 799 sq ft | 2 | 2 |
| O2 Wing C | 2BHK | 76.23 sq m · 821 sq ft | 13 | 13 |
| O2 Wing C | 2BHK | 76.33 sq m · 822 sq ft | 16 | 16 |
| O2 Wing C | 2BHK | 76.54 sq m · 824 sq ft | 1 | 1 |
| O2 Wing D | 2BHK | 64.8 sq m · 698 sq ft | 1 | 1 |
| O2 Wing D | 2BHK | 69.11 sq m · 744 sq ft | 5 | 5 |
| O2 Wing D | 2BHK | 69.62 sq m · 749 sq ft | 13 | 9 |
| O2 Wing D | 2BHK | 69.88 sq m · 752 sq ft | 11 | 8 |
| O2 Wing D | 2BHK | 74.27 sq m · 799 sq ft | 2 | 2 |
| O2 Wing D | 2BHK | 76.23 sq m · 821 sq ft | 15 | 15 |
| O2 Wing D | 2BHK | 76.33 sq m · 822 sq ft | 14 | 14 |
| O2 Wing E | 2BHK | 94.9 sq m · 1,021 sq ft | 13 | 12 |
| O2 Wing E | 2BHK | 95.18 sq m · 1,025 sq ft | 18 | 16 |
| O2 Wing E | 3BHK | 93.53 sq m · 1,007 sq ft | 1 | 1 |
| O2 Wing F | 2BHK | 63.75 sq m · 686 sq ft | 2 | 2 |
| O2 Wing F | 2BHK | 64.8 sq m · 698 sq ft | 30 | 30 |
| O2 Wing F | 2BHK | 74.27 sq m · 799 sq ft | 3 | 3 |
| O2 Wing F | 2BHK | 76.23 sq m · 821 sq ft | 13 | 13 |
| O2 Wing F | 2BHK | 76.54 sq m · 824 sq ft | 14 | 14 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 307 filings listed on MahaRERA's project page
Finance
Legal
Show all 309 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 28 Jul 2017Source
- 1 Building Plan Approval (IOD)IOD.pdf · uploaded 28 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 28 Jul 2017Source
- 1 Proforma of Allotment letterDeclaration O2.pdf · uploaded 28 Jul 2017Source
- 1 Details of encumbrancesEn O2.pdf · uploaded 30 Jul 2017Source
- 1 Declaration in FORM BO2.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)O2 Arct Cert 12345.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 sale engg.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of CA (Form 3)Form 3 CA Certificate for RERA Registration - O2 Project_001.pdf · uploaded 30 Jul 2017Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)O2 (.pdf · uploaded 17 Nov 2017Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Rehab.pdf · uploaded 17 Nov 2017Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Sale.pdf · uploaded 17 Nov 2017Source
- 2 Certificates of CA (Form 3)O2 (.pdf · uploaded 17 Nov 2017Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)S B DEVELOPERS.pdf · uploaded 17 Feb 2018Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Rehab.pdf · uploaded 17 Feb 2018Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Sale.pdf · uploaded 17 Feb 2018Source
- 3 Certificates of CA (Form 3)O2 Compress.pdf · uploaded 17 Feb 2018Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)O2.pdf · uploaded 17 May 2018Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 - REHAB.pdf · uploaded 17 May 2018Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 - Sale.pdf · uploaded 17 May 2018Source
- 4 Certificates of CA (Form 3)O2 March,18.pdf · uploaded 17 May 2018Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate O2.pdf · uploaded 20 Aug 2018Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Project - Rehab Bldg.pdf · uploaded 20 Aug 2018Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Project - Sale Bldg.pdf · uploaded 20 Aug 2018Source
- 5 Certificates of CA (Form 3)O2.pdf · uploaded 20 Aug 2018Source
- 2 Proforma of Allotment letterO2-AFS.pdf · uploaded 1 Sep 2018Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)S B Developers.pdf · uploaded 26 Nov 2018Source
- 6 Certificates of CA (Form 3)O2 - Sept,18.pdf · uploaded 26 Nov 2018Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Project - Rehab.pdf · uploaded 4 Dec 2018Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Project Sale.pdf · uploaded 4 Dec 2018Source
- 1 Certificates of CA (Form 5)FORM 5 - O2.pdf · uploaded 5 Feb 2019Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 - Rehab Building.pdf · uploaded 28 Feb 2019Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 - Sale Building.pdf · uploaded 28 Feb 2019Source
- 7 Certificates of CA (Form 3)O2 Dec 18.pdf · uploaded 6 Mar 2019Source
- 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Rehab Project.pdf · uploaded 14 May 2019Source
- 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Sale Project.pdf · uploaded 14 May 2019Source
- 8 Certificates of CA (Form 3)O2.pdf · uploaded 13 Jun 2019Source
- 2 Certificates of CA (Form 5)O2 - Mar - 19.pdf · uploaded 20 Jun 2019Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate SB Developers.pdf · uploaded 30 Aug 2019Source
- 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Rehab.pdf · uploaded 16 Sep 2019Source
- 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Sale.pdf · uploaded 16 Sep 2019Source
- 9 Certificates of CA (Form 3)CA Certificate O2.pdf · uploaded 16 Sep 2019Source
- 10 Certificates of CA (Form 3)CA Certificate O2.pdf · uploaded 11 Dec 2019Source
- 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Rehab.pdf · uploaded 18 Dec 2019Source
- 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Sale.pdf · uploaded 18 Dec 2019Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Snehanjali n SB Developers.pdf · uploaded 18 Feb 2020Source
- 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 - Rehab.pdf · uploaded 7 Mar 2020Source
- 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 - Sale.pdf · uploaded 7 Mar 2020Source
- 11 Certificates of CA (Form 3)CA Certificate O2.pdf · uploaded 11 Mar 2020Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2_O2 - RERA Architect Certificate.pdf · uploaded 12 Feb 2021Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2_O2 - RERA Architect Certificate - June,20.pdf · uploaded 12 Feb 2021Source
- 12 Certificates of CA (Form 3)O2 March 20.pdf · uploaded 12 Feb 2021Source
- 13 Certificates of CA (Form 3)O2 - June20.pdf · uploaded 13 Feb 2021Source
- 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Rehab - March 20.pdf · uploaded 16 Feb 2021Source
- 23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Sale - March 20.pdf · uploaded 16 Feb 2021Source
- 24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Sale - June20.pdf · uploaded 16 Feb 2021Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)O2 - Architect Certificate - Dec20.pdf · uploaded 25 Feb 2021Source
- 14 Certificates of CA (Form 3)O2 SEP 2020.pdf · uploaded 16 Mar 2021Source
- 15 Certificates of CA (Form 3)O2 DEC 2020.pdf · uploaded 16 Mar 2021Source
- 25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Rehab Sept 20.pdf · uploaded 30 Mar 2021Source
- 26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Sale Sept 20.pdf · uploaded 30 Mar 2021Source
- 27 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Rehab Dec 20.pdf · uploaded 30 Mar 2021Source
- 28 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 sale Dec 20.pdf · uploaded 30 Mar 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5-O2 PROJECT.pdf · uploaded 2 Apr 2021Source
- 2 PAN CardSnehanjali S B Developers_PAN.pdf · uploaded 25 May 2021Source
- 2 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 25 May 2021Source
- 2 Building Plan Approval (IOD)IOD Plan.pdf · uploaded 25 May 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 25 May 2021Source
- 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2_O2 - RERA Architect Certificate March21.pdf · uploaded 25 May 2021Source
- 29 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Rehab.pdf · uploaded 21 Jun 2021Source
- 30 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)O2 Sale.pdf · uploaded 21 Jun 2021Source
- 16 Certificates of CA (Form 3)O2 Project Form3.pdf · uploaded 25 Jun 2021Source
- 3 Building Plan Approval (IOD)IOD.pdf · uploaded 29 Jun 2021Source
- 2 Details of encumbrancesO2- Details of Encumbrance-5.pdf · uploaded 1 Jul 2021Source
- 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2_O2 - RERA Architect Certificate.pdf · uploaded 10 Aug 2021Source
- 31 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Rehab Bldg - June-21.pdf · uploaded 13 Aug 2021Source
- 32 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Sale Bldg - June-21.pdf · uploaded 13 Aug 2021Source
- 17 Certificates of CA (Form 3)Form 3 CA Certificate for RERA Compliance - O2 Project - June 21.pdf · uploaded 13 Aug 2021Source
- 3 Certificates of CA (Form 5)FORM 5 O2.pdf · uploaded 21 Sep 2021Source
- 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)O2- RERA Architect Certificate.pdf · uploaded 6 Oct 2021Source
- 33 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Sale Bldg -Sep-21.pdf · uploaded 6 Oct 2021Source
- 34 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Rehab Bldg - Sep-21.pdf · uploaded 6 Oct 2021Source
- 18 Certificates of CA (Form 3)Form 3 CA Certificate for RERA Compliance - O2 Project September 21.pdf · uploaded 7 Oct 2021Source
- 3 Details of encumbrancesEncumbrance Certificate of O2 project.pdf · uploaded 20 Dec 2021Source
- 35 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Sale Bldg -Dec-21.pdf · uploaded 7 Jan 2022Source
- 36 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Rehab Bldg - Dec-21.pdf · uploaded 7 Jan 2022Source
- 19 Certificates of CA (Form 3)Form 3 CA Certificate for RERA Compliance - O2 Project December 21.pdf · uploaded 7 Jan 2022Source
- 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)O2- RERA Architect Certificate.pdf · uploaded 6 Apr 2022Source
- 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)O2- RERA Architect Certificate.pdf · uploaded 6 Apr 2022Source
- 37 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Sale Bldg -Mar 22.pdf · uploaded 7 Apr 2022Source
- 38 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Rehab Bldg - Mar 22.pdf · uploaded 7 Apr 2022Source
- 20 Certificates of CA (Form 3)Form 3 CA Certificate for RERA Compliance - O2 Project March 22.pdf · uploaded 7 Apr 2022Source
- 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)O2- Architect Certificate.pdf · uploaded 7 Jul 2022Source
- 39 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Sale Bldg - June 22.pdf · uploaded 7 Jul 2022Source
- 40 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Rehab Bldg - June 22.pdf · uploaded 7 Jul 2022Source
- 21 Certificates of CA (Form 3)Form 3 CA Certificate for RERA Compliance - O2 Project June 22.pdf · uploaded 7 Jul 2022Source
- 4 Certificates of CA (Form 5)RERA Certificate Form no 5 of FY 2021-22 - O2 Project.pdf · uploaded 28 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)RERA Certificate Form no 5 of FY 2020-21 - O2 Project.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)RERA Certificate Form no 5 of FY 2021-22 - O2 Project.pdf · uploaded 30 Sep 2022Source
- 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)O2.pdf · uploaded 6 Oct 2022Source
- 41 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Sale Bldg - Sep 22.pdf · uploaded 7 Oct 2022Source
- 42 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Rehab Bldg - Sep 22.pdf · uploaded 7 Oct 2022Source
- 22 Certificates of CA (Form 3)Form 3 CA Certificate for RERA Compliance - O2 Project Sept 22.pdf · uploaded 7 Oct 2022Source
- 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)O2- RERA Architect Certifcate.pdf · uploaded 5 Jan 2023Source
- 4 a Details of encumbrances concerned to FinanceEncumbrance .pdf · uploaded 6 Jan 2023Source
- 1 b Details of encumbrances concerned to LegalEncumbrance .pdf · uploaded 6 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality .pdf · uploaded 6 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality .pdf · uploaded 6 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality .pdf · uploaded 6 Jan 2023Source
- 1 CERSAI detailsCERSAI_Search_Report_200256936312_For_Asset_Based_Search_06_01_2023_16_34_18_568.pdf · uploaded 6 Jan 2023Source
- 1 Proforma of Agreement for saleAFS - Draft HTC O2.pdf · uploaded 6 Jan 2023Source
- 43 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Sale Bldg - Dec 22.pdf · uploaded 7 Jan 2023Source
- 44 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Rehab Bldg - Dec 22.pdf · uploaded 7 Jan 2023Source
- 23 Certificates of CA (Form 3)Form 3 CA Certificate for RERA Compliance - O2 Project Dec 22.pdf · uploaded 7 Jan 2023Source
- 1 Declaration about Commencement CertificateDeclaration about CC .pdf · uploaded 9 Jan 2023Source
- 1 Disclosure of sold/ booked inventoryDisclosure .pdf · uploaded 9 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure .pdf · uploaded 9 Jan 2023Source
- 2 Disclosure of sold/ booked inventorysold and Unsold Inventory.pdf · uploaded 10 Jan 2023Source
- 3 Proforma of Allotment letterRERA Allotment Letter New - O2.pdf · uploaded 10 Mar 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Sheet Allotment Letter - O2.pdf · uploaded 10 Mar 2023Source
- 4 Proforma of Allotment letterRevised RERA Proposed Allotment Letter O2.pdf · uploaded 21 Mar 2023Source
- 2 Deviation Report with respect to Allotment letterRevised Deviation Sheet Allotment Letter O2.pdf · uploaded 21 Mar 2023Source
- 45 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Sale Bldg - Mar 23.pdf · uploaded 6 Apr 2023Source
- 46 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Rehab Bldg - Mar 23.pdf · uploaded 6 Apr 2023Source
- 24 Certificates of CA (Form 3)Form 3 CA Certificate for RERA Compliance - O2 Project Mar 23.pdf · uploaded 7 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)O2123.pdf · uploaded 17 Apr 2023Source
- 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)O2.pdf · uploaded 19 Apr 2023Source
- 47 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Sale Bldg - Jun 23.pdf · uploaded 7 Jul 2023Source
- 48 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Rehab Bldg - Jun 23.pdf · uploaded 7 Jul 2023Source
- 25 Certificates of CA (Form 3)Form 3 CA Certificate for RERA Compliance - O2 Project Jun 23.pdf · uploaded 7 Jul 2023Source
- 5 Certificates of CA (Form 5)RERA Certificate Form no 5 of FY 2022-23 - O2 Project.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)RERA Certificate Form no 5 of FY 2022-23 - O2 Project.pdf · uploaded 29 Sep 2023Source
- 49 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Sale Bldg - Sep 23.pdf · uploaded 7 Oct 2023Source
- 50 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Rehab Bldg - Sep 23.pdf · uploaded 7 Oct 2023Source
- 26 Certificates of CA (Form 3)Form 3 CA Certificate for RERA Compliance - O2 Project Sept 23.pdf · uploaded 7 Oct 2023Source
- 51 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Sale Bldg - Dec 23.pdf · uploaded 6 Jan 2024Source
- 52 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Rehab Bldg - Dec 23.pdf · uploaded 6 Jan 2024Source
- 53 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Sale Bldg - Mar 24.pdf · uploaded 20 Apr 2024Source
- 54 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - O2 Project - Rehab Bldg - Mar 24.pdf · uploaded 20 Apr 2024Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 1Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 2Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Form 3Rera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Disclosure of Sold and Booked InventoryRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
- Self-declaration of Quarterly ProgressRera Declaration-O2.pdf · uploaded 13 Jan 2026Source
Technical
Technical (Architect)
- DocumentO2.pdf · uploaded 19 Apr 2023Source
Technical (Engineer)
- DocumentEngineer Certificate - O2 Project - Rehab Bldg - Mar 24.pdf · uploaded 20 Apr 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.
- Listed as an NCLT insolvency projectMatched by RERA number
Listed as NCLT project: O2
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Kurla, Kurla taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Cts No 475
- South
- V N Purav Marg
- East
- Cts No 475
- West
- Cts No 474 And 476
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Shyam J Hemrajani | — |
| Engineer | Sahil Manoj Payer | — |
Source: MahaRERA project page. Contact details are not shown.