Dhoot Pride Residency-Devidayal Apartment
Certificate SignedKurla, Mumbai Suburban 400080 |Promoter: Dhoot Developers Pvt. Ltd.
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 2BHK, 3BHK37 units in all
- Address
- Cts No 894 And Plot No 1016, R.p.road, Mulund WestPIN 400080
- Designated bank account
- 76
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 3 years
- Registered
- 19 Aug 2017
- Promised
- 30 Dec 2023
- Revised
- 31 Dec 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51800008534 | 19 Aug 2017 | 30 Dec 2023 | 31 Dec 2026 | Dhoot Developers Pvt. Ltd. | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Devidayal Apartment CHSL | 21 | 37 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
21 of 37 units booked (57%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 58.7 sq m · 632 sq ft | 2 | 1 |
| 2BHK | 58.71 sq m · 632 sq ft | 3 | 3 |
| 2BHK | 62.26 sq m · 670 sq ft | 4 | 2 |
| 2BHK | 62.55 sq m · 673 sq ft | 7 | 3 |
| 2BHK | 62.98 sq m · 678 sq ft | 4 | 3 |
| 2BHK | 71.86 sq m · 773 sq ft | 1 | 1 |
| 3BHK | 80.82 sq m · 870 sq ft | 4 | 4 |
| 3BHK | 81.4 sq m · 876 sq ft | 6 | 1 |
| 3BHK | 85.66 sq m · 922 sq ft | 6 | 3 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 155 filings listed on MahaRERA's project page
Finance
- PAN CardDDPL PAN CARD.pdf · uploaded 31 Mar 2022Source
Legal
Migrated
- 1 Copy of the legal title reportDevidayal-Title Certificate.pdf · uploaded 14 Aug 2017Source
Show all 157 documentsShow fewer documents
Migrated
- 1 Details of encumbrancesDevidayal Encumbrances.pdf · uploaded 14 Aug 2017Source
- 1 Copy of Layout Approval (in case of layout)Final IOD_Part5_Part2.pdf · uploaded 14 Aug 2017Source
- 2 Copy of Layout Approval (in case of layout)Final IOD_Part6_Part1.pdf · uploaded 14 Aug 2017Source
- 3 Copy of Layout Approval (in case of layout)Final IOD_Part6_Part2.pdf · uploaded 14 Aug 2017Source
- 4 Copy of Layout Approval (in case of layout)Final IOD_Part7.pdf · uploaded 14 Aug 2017Source
- 1 Building Plan Approval (IOD)Final IOD_Part1.pdf · uploaded 14 Aug 2017Source
- 2 Building Plan Approval (IOD)Final IOD_Part2.pdf · uploaded 14 Aug 2017Source
- 3 Building Plan Approval (IOD)Final IOD_Part3.pdf · uploaded 14 Aug 2017Source
- 4 Building Plan Approval (IOD)Final IOD_Part4.pdf · uploaded 14 Aug 2017Source
- 5 Building Plan Approval (IOD)Final IOD_Part5_Part1.pdf · uploaded 14 Aug 2017Source
- 1 Certificates of CA (Form 3)Page 1.pdf · uploaded 14 Aug 2017Source
- 2 Certificates of CA (Form 3)Page 2.pdf · uploaded 14 Aug 2017Source
- 3 Certificates of CA (Form 3)Page 3.pdf · uploaded 14 Aug 2017Source
- 4 Certificates of CA (Form 3)Page 4.pdf · uploaded 14 Aug 2017Source
- 1 Proforma of Allotment letterDevidayal _Allotment Letter.pdf · uploaded 14 Aug 2017Source
- 1 Declaration in FORM BForm B-Devidayal Apartment CHSL.pdf · uploaded 16 Aug 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentDevidayal _ RERA Letter-2018.pdf · uploaded 11 Oct 2018Source
- 5 Certificates of CA (Form 3)Form 3 - 31-03-2018.pdf · uploaded 1 Mar 2022Source
- 6 Certificates of CA (Form 3)Form 3 - 31-03-2019.pdf · uploaded 1 Mar 2022Source
- 7 Certificates of CA (Form 3)Form 3 - 31-03-2020.pdf · uploaded 1 Mar 2022Source
- 8 Certificates of CA (Form 3)Form 3 - 31-03-2021.pdf · uploaded 1 Mar 2022Source
- 9 Certificates of CA (Form 3)Form 3 - 30-06-2021.pdf · uploaded 1 Mar 2022Source
- 10 Certificates of CA (Form 3)Form 3 - 30-09-2021.pdf · uploaded 1 Mar 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Form 5 - 31-03-2018.pdf · uploaded 1 Mar 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 - 31-03-2019.pdf · uploaded 1 Mar 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 - 31-03-2020.pdf · uploaded 1 Mar 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 - 31-03-2021.pdf · uploaded 1 Mar 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Form 1 31032018.pdf · uploaded 25 Mar 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Form 1 31032019.pdf · uploaded 25 Mar 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Form 1 31032020.pdf · uploaded 25 Mar 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 Form 1 31032021.pdf · uploaded 25 Mar 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 Form 1 30062021.pdf · uploaded 25 Mar 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 Form 1 30092021.pdf · uploaded 25 Mar 2022Source
- 1 CERSAI detailsCersai Report.pdf · uploaded 28 Mar 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 march 18.pdf · uploaded 29 Mar 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 19.pdf · uploaded 29 Mar 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 19.pdf · uploaded 29 Mar 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 20.pdf · uploaded 29 Mar 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 21.pdf · uploaded 29 Mar 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 21.pdf · uploaded 29 Mar 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep 21.pdf · uploaded 29 Mar 2022Source
- 1 PAN CardDDPL PAN CARD.pdf · uploaded 31 Mar 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)7 Form 1 31122021.pdf · uploaded 31 Mar 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec'21.pdf · uploaded 1 Apr 2022Source
- 11 Certificates of CA (Form 3)FORM 3_Dec'21_compressed.pdf · uploaded 1 Apr 2022Source
- 6 Building Plan Approval (IOD)IOD dated 14012022.pdf · uploaded 6 Apr 2022Source
- 1 Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 6 Apr 2022Source
- 1 OtherPD Resign letter.pdf · uploaded 7 Apr 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A - 2020.pdf · uploaded 9 Apr 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A - 2021.pdf · uploaded 9 Apr 2022Source
- 2 OtherForm 2A - 2019.pdf · uploaded 9 Apr 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentDD FirstCC_signed.pdf · uploaded 12 Apr 2022Source
- 1 Declaration about Commencement CertificateCC Declaration_Upto Plinth_12042022.pdf · uploaded 13 Apr 2022Source
- 5 Copy of Layout Approval (in case of layout)Layout - 1.pdf · uploaded 18 Apr 2022Source
- 6 Copy of Layout Approval (in case of layout)Drawing for Full CC dtd 06012022 1-3.pdf · uploaded 18 Apr 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)Devidayal Society Registration Certificate.pdf · uploaded 24 May 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Devidayal_31-03-2022.pdf · uploaded 30 Jun 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Devidayal_31-03-2022.pdf · uploaded 30 Jun 2022Source
- 2 Disclosure of sold/ booked inventorySold Unsold devidayal.pdf · uploaded 30 Jun 2022Source
- 12 Certificates of CA (Form 3)Form 3_Devidayal_31-03-2022_compressed.pdf · uploaded 30 Jun 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Devidayal_30062022.pdf · uploaded 4 Aug 2022Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Devidayal_30062022.pdf · uploaded 4 Aug 2022Source
- 3 Disclosure of sold/ booked inventoryDevidayal Sold Unsold.pdf · uploaded 4 Aug 2022Source
- 13 Certificates of CA (Form 3)Form 3_Devidayal_30062022_compressed.pdf · uploaded 4 Aug 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)DEVIDAYAL - FORM 5.pdf · uploaded 30 Sep 2022Source
- 1 b Details of encumbrances concerned to LegalLegal Encumberance Declaration.pdf · uploaded 8 Oct 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sep22.pdf · uploaded 8 Oct 2022Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep22.pdf · uploaded 8 Oct 2022Source
- 4 Disclosure of sold/ booked inventorySold Unold 30092022.pdf · uploaded 8 Oct 2022Source
- 14 Certificates of CA (Form 3)Form-3 Sep-22 Signed copy_compressed.pdf · uploaded 8 Oct 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaraion for separate bank account.pdf · uploaded 8 Oct 2022Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 -Dec 22.pdf · uploaded 16 Jan 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 -Dec 22.pdf · uploaded 16 Jan 2023Source
- 5 Disclosure of sold/ booked inventorySold Unsold Unit 31-12-22.pdf · uploaded 16 Jan 2023Source
- 15 Certificates of CA (Form 3)Form 3 -Dec 22_compressed.pdf · uploaded 16 Jan 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 march 23 compressed.pdf · uploaded 11 Apr 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 march 23.pdf · uploaded 11 Apr 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A march 23.pdf · uploaded 11 Apr 2023Source
- 6 Disclosure of sold/ booked inventorySold unsold inventory.pdf · uploaded 11 Apr 2023Source
- 16 Certificates of CA (Form 3)Form 3 march23 compressed.pdf · uploaded 11 Apr 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentFull CC.pdf · uploaded 14 Jul 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate 30062023.pdf · uploaded 14 Jul 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer's Certificate 30-06-2023.pdf · uploaded 14 Jul 2023Source
- 17 Certificates of CA (Form 3)Form 3 CA Certificate 30-06-2023 Sign Copy.pdf · uploaded 14 Jul 2023Source
- 2 Declaration about Commencement CertificateDeclaration - CC.pdf · uploaded 16 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Dhoot Form 5.pdf · uploaded 5 Sep 2023Source
- 2 CERSAI detailsCERSAI REPORT of DEVIDAYAL APARTMENT.pdf · uploaded 12 Sep 2023Source
- 2 Details of encumbrancesEncrumbrance Devidayal.pdf · uploaded 14 Sep 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 DD 30092023.pdf · uploaded 12 Oct 2023Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 DD 30092023.pdf · uploaded 12 Oct 2023Source
- 18 Certificates of CA (Form 3)Form-3 DD 3009_compressed.pdf · uploaded 12 Oct 2023Source
- 1 Proforma of Agreement for saleAGREEMENT FOR SALE- DEVIDAYAL APARTMENTS ( RERA)-07112023.pdf · uploaded 7 Nov 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Pride.pdf · uploaded 15 Jan 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Pride.pdf · uploaded 15 Jan 2024Source
- 19 Certificates of CA (Form 3)Form 3 - Pride.pdf · uploaded 15 Jan 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Ar Certificate - 31032024 - DD.PDF · uploaded 13 Apr 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)DD - Form 2.pdf · uploaded 13 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A march 23.pdf · uploaded 13 Apr 2024Source
- 20 Certificates of CA (Form 3)Form 3 Devidayal 31032024_compressed.pdf · uploaded 13 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)DD - Form 2A 23-24.pdf · uploaded 31 May 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Pride.pdf · uploaded 15 Jul 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Pride.pdf · uploaded 15 Jul 2024Source
- 21 Certificates of CA (Form 3)Form 3 Pride 30062024.pdf · uploaded 15 Jul 2024Source
- 22 Certificates of CA (Form 3)Form 3 Pride 30062024.pdf · uploaded 15 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 FY 23 - 24 - Pride.pdf · uploaded 8 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Pride - 300924.pdf · uploaded 16 Oct 2024Source
- 2 Certificates of CA (Form 3)Form-3 30092024-compressed.pdf · uploaded 16 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Pride - 300924.pdf · uploaded 16 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)DD form 1 dec 24.pdf · uploaded 9 Jan 2025Source
- 1 Certificates of CA (Form 3)Form-3 31122024 with sign.pdf · uploaded 9 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 devidayal rera dec 24.pdf · uploaded 9 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 DHOOT Pride.pdf · uploaded 14 Apr 2025Source
- 1 Certificates of CA (Form 3)Form 3 Final.pdf · uploaded 14 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)DD - Form 2 Engineer's Certificate 31-03-2025 Final.pdf · uploaded 14 Apr 2025Source
- Form 2A (FY 2024-2025)Form 2A Pride.pdf · uploaded 17 Jul 2025Source
- Withdrawal Update Form 1Form 1 Pride.pdf · uploaded 6 Aug 2025Source
- Withdrawal Update Form 2Form 2 Pride.pdf · uploaded 6 Aug 2025Source
- Withdrawal Update Form 3FORM 3 Devidayal 30062025.pdf · uploaded 6 Aug 2025Source
- Form 5 (FY 2024-2025)DD - Annexure F Form 5.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 1Form 1 Devidayal 30092025.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 2Form 2 Devidayal 30092025.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 3Form 3 Devidayal 30092025.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 1Form 1 Devidayal 31122025.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Form 2 Devidayal 31122025.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3Form 3 Devidayal 31122025.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1Form 1 of Devidayal 31032026.pdf · uploaded 28 Apr 2026Source
- Withdrawal Update Form 2Form 2 of Devidayal 31032026.pdf · uploaded 28 Apr 2026Source
- Withdrawal Update Form 3Form 3 of Devidayal 31032026.pdf · uploaded 28 Apr 2026Source
- Form 2A (FY 2025-2026)Form 2A Devidayal FY 25-26.pdf · uploaded 26 Jun 2026Source
Technical
- DocumentFinal IOD_Part5_Part2.pdf · uploaded 14 Aug 2017Source
- DocumentFinal IOD_Part6_Part1.pdf · uploaded 14 Aug 2017Source
- DocumentFinal IOD_Part6_Part2.pdf · uploaded 14 Aug 2017Source
- DocumentFinal IOD_Part7.pdf · uploaded 14 Aug 2017Source
- DocumentFinal IOD_Part1.pdf · uploaded 14 Aug 2017Source
- DocumentFinal IOD_Part2.pdf · uploaded 14 Aug 2017Source
- DocumentFinal IOD_Part3.pdf · uploaded 14 Aug 2017Source
- DocumentFinal IOD_Part4.pdf · uploaded 14 Aug 2017Source
- DocumentFinal IOD_Part5_Part1.pdf · uploaded 14 Aug 2017Source
- DocumentIOD dated 14012022.pdf · uploaded 6 Apr 2022Source
- DocumentLayout - 1.pdf · uploaded 18 Apr 2022Source
- DocumentDrawing for Full CC dtd 06012022 1-3.pdf · uploaded 18 Apr 2022Source
Technical (Architect)
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Kurla, Kurla taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Petrol Pump
- South
- Road
- East
- Plot No 1017
- West
- Plot No 1014 And 1015
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | R P Asundaria | — |
| Chartered accountant | Dipesh Thakkar | — |
| Chartered accountant | Shashank R Jain & Associates | — |
| Engineer | Kalyanji M. Parmar | — |
| Engineer | Sandeep Sakal | — |
Source: MahaRERA project page. Contact details are not shown.