Skip to content

Chandrika

Completed

Kurla, Mumbai Suburban 400071 |Promoter: Shree Krishna Properties

Residential / Group HousingRERAP51800024241
29 Jan 2020Registered with MahaRERA
30 Sep 2022Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
684 sq m (7,357 sq ft)
Permissible built-up area
1,845 sq m (19,864 sq ft)
Sanctioned built-up area
1,845 sq m (19,864 sq ft)
Address
Cts No 1338, 1338/1 To 4, Ss III 9th Road, ChemburPIN 400071
Designated bank account
Karur Vysya Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Chandrika is at latitude 0.00000, longitude 0.00000.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Sep 2022

The latest completion date on record passed 4 years and 1 month ago.

Registered
29 Jan 2020
Promised
30 Sep 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5180002424129 Jan 202030 Sep 2022—Shree Krishna PropertiesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Chandrika13—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Chandrika

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyB MC0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)DEVELOPER0%
  • Storm Water DrainsDEVELOPER0%
  • Landscaping & Tree PlantingDEVELOPER0%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingDEVELOPER0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsDEVELOPER0%
  • Electrical meter room, sub-station, receiving stationDEVELOPER0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

18 documents held by Deedo, 21 filings listed on MahaRERA's project page

Title report

Encumbrance details

Form B

Commencement certificate (2)

Form 1

Form 2

Registration certificate

Show all 39 documentsShow fewer documents

Occupancy / completion certificate

  • Occupancy / completion certificate23 Apr 2022ViewSource

Form 4

Other (2)

Form 5 (3)

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportChandrika Titile Certificate.pdf · uploaded 13 Jun 2019View
  • Details of encumbrancesChandrika Declaration of no legal encumbrances.pdf · uploaded 13 Jun 2019View
  • Declaration in FORM BChandrika Form B_.pdf · uploaded 13 Jun 2019View
  • Proforma of Allotment letterPROFORMA ALLOTMENT LEETER.pdf · uploaded 13 Jun 2019View
  • Copy of Layout Approval (in case of layout)LAYOUT APPROVAL.pdf · uploaded 21 Nov 2019View
  • Commencement Certificates / NA Order for plotted developmentBMC APPROVAL.pdf · uploaded 21 Nov 2019View
  • Building Plan Approval / NA Order for plotted developmentAPPROVED BUILDING PLAN.pdf · uploaded 21 Nov 2019View
  • Commencement Certificates / NA Order for plotted developmentChandrika CC.pdf · uploaded 14 Jan 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech CHANDRIKA_.pdf · uploaded 24 Aug 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer CHANDRIKA_.pdf · uploaded 24 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentchandrika OC.pdf · uploaded 23 Apr 2022View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4 - CHANDRIKA.pdf · uploaded 23 Apr 2022View
  • Status of Formation of Legal Entity (Society/Co Op etc.)CHANDRIKA.pdf · uploaded 14 Jun 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)SKP-Chandrika 19-20.pdf · uploaded 7 Aug 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)SKP-Chandrika 20-21.pdf · uploaded 7 Aug 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)SKP-CHANDRIKA 21-22.pdf · uploaded 7 Aug 2023View

Promoter documents

  • Declaration Form BChandrika Form B_.pdf · uploaded 13 Jun 2019View
  • Legal Title reportChandrika Titile Certificate.pdf · uploaded 13 Jun 2019View

Technical documents

  • Layout ApprovalLAYOUT APPROVAL.pdfView
  • Building Plan ApprovalAPPROVED BUILDING PLAN.pdfView

Proforma allotment letter

  • Proforma allotment letterPROFORMA ALLOTMENT LEETER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kurla, Kurla taluka

Survey, CTS, gat or plot numbers

1338/1 TO 4CTS NO 1338

As published on MahaRERA's project page

CTS NO 1338, 1338/1 TO 4

Boundaries

North
9th Road
South
Plot No 392
East
Plot No379
West
Plot No381

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectUjas Patel—
Chartered accountantHeena Momaya—
EngineerTejas Bhagwandas Patel—
OtherG P Enterprise—

Source: MahaRERA project page. Contact details are not shown.

Data through12 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology