Kurla, Mumbai Suburban 400070 |Promoter: Shreeji Properties

Residential / Group HousingRERAP51800023174
5 Dec 2019Registered with MahaRERA
30 Dec 2026Promised completion
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
2
Land area for this project
2,215 sq m (23,844 sq ft)
Permissible built-up area
8,280 sq m (89,121 sq ft)
Sanctioned built-up area
8,280 sq m (89,121 sq ft)
Planning authority
SLUM REHABILITATION AUTHORITY
Address
82, 82 1 to 49, Hutatma Kelaskar Marg, Kurla, Behind New Mall CompoundPIN 400070
Designated bank account
Kotak Mahindra Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.07235, 72.87731
BKC Crown is at latitude 19.07235, longitude 72.87731.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2026

Registered
5 Dec 2019
Promised
30 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P518000231745 Dec 201930 Dec 2026—Shreeji PropertiesProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A and B, BKC Crown13—
Wing C, Ashtvinayak SRA CHSL13—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Wing A and B, BKC CrownClosed/Covered000092
Wing A and B, BKC CrownOpen Space00000
Wing C, Ashtvinayak SRA CHSLClosed/Covered00008
Wing C, Ashtvinayak SRA CHSLOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Wing A and B, BKC Crown

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Wing C, Ashtvinayak SRA CHSL

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises—
  • Sanitary Fittings within the flats / premises50%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyWill be provided before completion0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Will be provided before completion30%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingWill be provided before completion0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWill be provided before completion0%
  • Energy managemcntWill be provided before completion0%
  • Fire protection and fire safety requirementsWill be provided before completion90%
  • Electrical meter room, sub-station, receiving stationWill be provided before completion40%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

89 documents held by Deedo, 116 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Details of encumbrancesNo Encumbrance.pdf · uploaded 6 Nov 2019View
  • Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 6 Nov 2019View
  • Declaration in FORM BFORM B - Affidavit cum Declaration FNL.pdf · uploaded 6 Nov 2019View
  • Proforma of Allotment letterLetter of Allotment -1.pdf · uploaded 6 Nov 2019View
  • Copy of the legal title reportTitle Certificate.pdf · uploaded 6 Nov 2019View
  • Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 7 Nov 2019View
  • Proforma of Allotment letterAgreement -BKC Crown.pdf · uploaded 8 Nov 2019View
  • Building Plan Approval / NA Order for plotted developmentIOA.pdf · uploaded 27 Nov 2019View
  • Building Plan Approval / NA Order for plotted development01 BKC Crown-1st to 6th Floors Build Plan.pdf · uploaded 3 Dec 2019View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Site Supervisor Cerificate.pdf · uploaded 7 Jan 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 2019-2020.pdf · uploaded 17 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 2020-2021.pdf · uploaded 17 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 2021-2022.pdf · uploaded 17 Feb 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 Architect Certificate 06-02-2023.pdf · uploaded 17 Feb 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Engineers Certificate 06-2-2023.pdf · uploaded 17 Feb 2023View
  • Building Plan Approval / NA Order for plotted developmentRevised LOI Ashtvinayak 14-01-2023.pdf · uploaded 17 Feb 2023View
  • Building Plan Approval / NA Order for plotted developmentAshtavinayak - 1st Ammended Plans Issue Letter - 23012023.pdf · uploaded 17 Feb 2023View
  • Copy of Layout Approval (in case of layout)Ashtavinayak - 1st Ammended Plans - Page 2 of 5 - 2312023.pdf · uploaded 17 Feb 2023View
  • CERSAI detailsCERDAI Undertaking With Report FNL.pdf · uploaded 22 Feb 2023View
  • Disclosure of sold/ booked inventorySold booked Inventory-BKC Crown.pdf · uploaded 22 Feb 2023View
  • Commencement Certificates / NA Order for plotted developmentShreeji CC.pdf · uploaded 12 May 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Engineers Certificate 31-03-2023.pdf · uploaded 14 Oct 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Engineers Certificate 30-06-2023.pdf · uploaded 14 Oct 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 01-04-2022 to 31-03-2023.pdf · uploaded 14 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1 31-03-2023.pdf · uploaded 14 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1 30-06-2023.pdf · uploaded 14 Oct 2023View
  • Copy of Layout Approval (in case of layout)01.pdf · uploaded 29 Feb 2024View
  • Copy of Layout Approval (in case of layout)02.pdf · uploaded 29 Feb 2024View
  • Copy of Layout Approval (in case of layout)03.pdf · uploaded 29 Feb 2024View
  • Copy of Layout Approval (in case of layout)04.pdf · uploaded 29 Feb 2024View
  • Copy of Layout Approval (in case of layout)05.pdf · uploaded 29 Feb 2024View
  • Commencement Certificates / NA Order for plotted developmentFurther CC Ashtvinayak 29-02-2024.pdf · uploaded 29 Feb 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Engineers Certificate 30-09-2023.pdf · uploaded 22 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Engineers Certificate 31-12-2023.pdf · uploaded 22 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1 30-09-2023.pdf · uploaded 22 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1 31-12-2023.pdf · uploaded 22 Apr 2024View
  • Disclosure of sold/ booked inventorySold Unsold 09-05-2024.pdf · uploaded 9 May 2024View
  • Proforma of Agreement for saleBKC Crown - Sale Agreement Draft.pdf · uploaded 14 Aug 2024View
  • Commencement Certificates / NA Order for plotted developmentCC 29-10-2024 A,B - Upto 10th, C - 10th.pdf · uploaded 16 Nov 2024View
  • Commencement Certificates / NA Order for plotted developmentCC 29-10-2024 A,B - Upto 10th, C - 10th.pdf · uploaded 16 Nov 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate 31-03-2024.pdf · uploaded 8 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate 30-06-2024.pdf · uploaded 8 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate 30-09-2024.pdf · uploaded 8 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Engineers Certificate 31-03-2024.pdf · uploaded 8 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Engineers Certificate 30-06-2024.pdf · uploaded 8 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Engineers Certificate 30-09-2024.pdf · uploaded 8 Jan 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 BKC Crown 23-24.pdf · uploaded 8 Jan 2025View
  • Commencement Certificates / NA Order for plotted developmentCC 26-12-2024.pdf · uploaded 8 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer 30-09-2024.pdf · uploaded 13 Jan 2025View
  • Form 5 (FY 2019-2020)FORM 5 19-20 Bkc Crown.pdf · uploaded 6 May 2026View
  • Form 5 (FY 2020-2021)FORM 5 20-21 Bkc Crown.pdf · uploaded 6 May 2026View
  • Form 5 (FY 2021-2022)FORM 5 21-22 Bkc Crown.pdf · uploaded 6 May 2026View
  • Form 5 (FY 2023-2024)FORM 5 23-24 Bkc Crown.pdf · uploaded 6 May 2026View
  • Form 5 (FY 2024-2025)FORM 5 24-25 Bkc Crown.pdf · uploaded 6 May 2026View
  • Withdrawal Update Form 1Form 1 Q1 25-26 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Withdrawal Update Form 2FORM 2 Q1 25-26 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Form 1Form 1 Q4 19-20 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Form 2Form 2 Q4 19-20 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory Q4 19-20 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Form 1Form 1 Q4 20-21 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Form 2Form 2 Q4 20-21 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory Q4 20-21 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Form 1Form 1 Q4 21-22 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Form 2Form 2 Q4 21-22 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory Q4 21-22 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Form 1Form 1 Q4 23-24 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Form 2Form 2 Q4 23-24 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory Q4 23-24 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Form 5 (FY 2022-2023)FORM 5 22-23 Bkc Crown.pdf · uploaded 1 Sep 2026View
  • Form 1Form 1 Q4 22-23 Bkc Crown.pdf · uploaded 7 Sep 2026View
  • Form 2Form 2 Q4 22-23 Bkc Crown.pdf · uploaded 7 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory Q4 22-23 Bkc Crown.pdf · uploaded 7 Sep 2026View
  • Withdrawal Update Form 1Form 1 Q2 25-26 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Withdrawal Update Form 2FORM 2 Q2 25-26 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 1Form 1 Q1 23-24 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 2Form 2 Q1 23-24 Bkc Crown New.pdf · uploaded 8 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory Q1 23-24 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 1Form 1 Q2 23-24 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 2Form 2 Q2 23-24 Bkc Crown New.pdf · uploaded 8 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory Q2 23-24 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 1Form 1 Q3 23-24 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 2Form 2 Q3 23-24 Bkc Crown New.pdf · uploaded 8 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory Q3 23-24 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 1Form 1 Q1 24-25 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 2Form 2 Q1 24-25 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory Q1 24-25 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 1Form 1 Q2 24-25 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 2Form 2 Q2 24-25 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory Q2 24-25 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 1Form 1 Q3 24-25 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 2FORM 2 Q3 24-25 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory Q3 24-25 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 1Form 1 Q4 24-25 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 2FORM 2 Q4 24-25 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Disclosure of Sold and Booked InventoryInventory Q4 24-25 Bkc Crown.pdf · uploaded 8 Sep 2026View
  • Form 2A (FY 2019-2020)Form 2A 19-20 Bkc Crown.pdf · uploaded 28 Sep 2026View
  • Form 2A (FY 2020-2021)Form 2A 20-21 Bkc Crown.pdf · uploaded 28 Sep 2026View
  • Form 2A (FY 2021-2022)Form 2A 21-22 Bkc Crown.pdf · uploaded 28 Sep 2026View
  • Form 2A (FY 2022-2023)Form 2A 22-23 Bkc Crown.pdf · uploaded 28 Sep 2026View
  • Form 2A (FY 2023-2024)Form 2A 23-24 Bkc Crown.pdf · uploaded 29 Sep 2026View
  • Form 2A (FY 2024-2025)Form 2A 24-25 Bkc Crown.pdf · uploaded 29 Sep 2026View
  • Form 2A (FY 2025-2026)Form 2A 25-26 Bkc Crown.pdf · uploaded 29 Sep 2026View

Promoter documents

  • Declaration Form BFORM B - Affidavit cum Declaration FNL.pdf · uploaded 6 Nov 2019View
  • Legal Title reportTitle Certificate.pdf · uploaded 6 Nov 2019View

Technical documents

  • Layout ApprovalLayout Plan.pdfView
  • Layout ApprovalAshtavinayak - 1st Ammended Plans - Page 2 of 5 - 2312023.pdfView
  • Layout Approval01.pdfView
  • Layout Approval02.pdfView
  • Layout Approval03.pdfView
  • Layout Approval04.pdfView
  • Layout Approval05.pdfView
  • Building Plan ApprovalIOA.pdfView
  • Building Plan Approval01 BKC Crown-1st to 6th Floors Build Plan.pdfView
  • Building Plan ApprovalRevised LOI Ashtvinayak 14-01-2023.pdfView
  • Building Plan ApprovalAshtavinayak - 1st Ammended Plans Issue Letter - 23012023.pdfView

Proforma allotment letter

  • Proforma allotment letterLetter of Allotment -1.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kurla, Kurla taluka

Survey, CTS, gat or plot numbers

8282 1 to 49

As published on MahaRERA's project page

82,82 1 to 49

Boundaries

North
CTS 27 and 77
South
Cts 83
East
Road
West
Cts 83

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDalvi & Associates—
Chartered accountantHingora & Co.—
Chartered accountantLahory & Company—
EngineerAmir Firoz Karimi—
EngineerHanware Consultants—
OtherInternational Construction Co—
OtherKunal Jain—
OtherMs Vision Design—

Source: MahaRERA project page. Contact details are not shown.

Data through12 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology