Certificate SignedKurla, Mumbai Suburban 400080 |Promoter: Prestige Mulund Realty Private Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- RERA registrations
- 2
- Phases
- 2
- Buildings
- 2
- Unit types
- 2BHK, 3BHK, Duplex, GardenVilla1,636 units in all
- Address
- 19/5 (Part), Adishakti Marg Near Veena Nagar off LBS Marg, Mulund WestPIN 400080
- Designated bank account
- 171
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Also registered as
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
P51800045339- Registered
- 12 May 2022
- Promised
- 31 Dec 2026
- Revised
- 30 Apr 2027
Completion pushed back 4 months
P51800046488- Registered
- 6 Aug 2022
- Promised
- 30 Jun 2027
- Revised
- 30 Oct 2027
2 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51800045339 | 12 May 2022 | 31 Dec 2026 | 30 Apr 2027 | Prestige Mulund Realty Private Limited | Project page |
| P51800046488 | 6 Aug 2022 | 30 Jun 2027 | 30 Oct 2027 | Prestige Mulund Realty Private Limited | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Bellanza Phase 1 - Wing A, B, C at The Prestige City | 52 | 837 |
| Bellanza Phase 2 - Wing D, E, F at The Prestige City | 53 | 799 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 of 1,636 units booked (0%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 2BHK | 65.31 sq m · 703 sq ft | 4 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 2BHK | 65.31 sq m · 703 sq ft | 90 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 2BHK | 68.38 sq m · 736 sq ft | 12 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 2BHK | 68.38 sq m · 736 sq ft | 108 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 2BHK | 69.4 sq m · 747 sq ft | 84 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 2BHK | 70.51 sq m · 759 sq ft | 78 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 3BHK | 75.72 sq m · 815 sq ft | 4 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 3BHK | 76.18 sq m · 820 sq ft | 36 | 0 |
Show all 53 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 3BHK | 76.18 sq m · 820 sq ft | 88 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 3BHK | 77.39 sq m · 833 sq ft | 28 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 3BHK | 78.22 sq m · 842 sq ft | 26 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 3BHK | 87.61 sq m · 943 sq ft | 14 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 3BHK | 88.07 sq m · 948 sq ft | 74 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 3BHK | 88.72 sq m · 955 sq ft | 28 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 3BHK | 89.19 sq m · 960 sq ft | 60 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 3BHK | 89.93 sq m · 968 sq ft | 44 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 3BHK | 90.3 sq m · 972 sq ft | 42 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 3BHK | 94.76 sq m · 1,020 sq ft | 1 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | 3BHK | 98.76 sq m · 1,063 sq ft | 1 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | Duplex | 148.27 sq m · 1,596 sq ft | 5 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | Duplex | 149.48 sq m · 1,609 sq ft | 4 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | Duplex | 151.15 sq m · 1,627 sq ft | 4 | 0 |
| P51800045339 | Bellanza Phase 1 - Wing A, B, C at The Prestige City | Duplex | 152.55 sq m · 1,642 sq ft | 2 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 2BHK | 68.28 sq m · 735 sq ft | 116 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 2BHK | 68.65 sq m · 739 sq ft | 32 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 2BHK | 69.31 sq m · 746 sq ft | 84 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 2BHK | 69.77 sq m · 751 sq ft | 28 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 2BHK | 70.42 sq m · 758 sq ft | 78 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 2BHK | 70.88 sq m · 763 sq ft | 26 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 3BHK | 75.72 sq m · 815 sq ft | 6 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 3BHK | 76.18 sq m · 820 sq ft | 58 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 3BHK | 76.83 sq m · 827 sq ft | 22 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 3BHK | 77.11 sq m · 830 sq ft | 22 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 3BHK | 77.29 sq m · 832 sq ft | 28 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 3BHK | 78.04 sq m · 840 sq ft | 26 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 3BHK | 88.72 sq m · 955 sq ft | 24 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 3BHK | 89.19 sq m · 960 sq ft | 86 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 3BHK | 89.84 sq m · 967 sq ft | 44 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 3BHK | 90.12 sq m · 970 sq ft | 43 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 3BHK | 90.39 sq m · 973 sq ft | 28 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 3BHK | 91.14 sq m · 981 sq ft | 26 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | 3BHK | 95.78 sq m · 1,031 sq ft | 1 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | Duplex | 125.88 sq m · 1,355 sq ft | 2 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | Duplex | 126.63 sq m · 1,363 sq ft | 2 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | Duplex | 127.74 sq m · 1,375 sq ft | 1 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | Duplex | 149.48 sq m · 1,609 sq ft | 2 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | Duplex | 149.48 sq m · 1,609 sq ft | 2 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | Duplex | 150.69 sq m · 1,622 sq ft | 2 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | Duplex | 150.78 sq m · 1,623 sq ft | 2 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | Duplex | 151.71 sq m · 1,633 sq ft | 2 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | GardenVilla | 140.56 sq m · 1,513 sq ft | 4 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | GardenVilla | 280.84 sq m · 3,023 sq ft | 1 | 0 |
| P51800046488 | Bellanza Phase 2 - Wing D, E, F at The Prestige City | GardenVilla | 336.96 sq m · 3,627 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 336 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
Show all 338 documentsShow fewer documents
Legal
- OtherP51800045339 · DOA P2.pdf · uploaded 9 May 2022Source
- OtherP51800045339 · DOA P3.pdf · uploaded 9 May 2022Source
- OtherP51800045339 · DOA P4.pdf · uploaded 9 May 2022Source
- OtherP51800045339 · DOA P5.pdf · uploaded 9 May 2022Source
- OtherP51800045339 · DOA P6.pdf · uploaded 9 May 2022Source
- OtherP51800045339 · DOA P7.pdf · uploaded 9 May 2022Source
- Declaration Form BP51800046488 · 4168_001.pdf · uploaded 22 Jul 2022Source
- Other – LegalP51800046488 · Undertaking on RERA Compliance.pdf · uploaded 3 Aug 2022Source
- Legal Title reportP51800046488 · Bellanza Title Certificate August 2,2022_compressed.pdf · uploaded 3 Aug 2022Source
Migrated
- 1 PAN CardP51800045339 · Ariisto - Pan Card.pdf · uploaded 7 May 2022Source
- 1 Copy of the legal title reportP51800045339 · Title Certificate_compressed.pdf · uploaded 7 May 2022Source
- 1 Details of encumbrancesP51800045339 · Encumbrance Certificate.pdf · uploaded 7 May 2022Source
- 1 Copy of Layout Approval (in case of layout)P51800045339 · Layout Approval Plans dt 24 03 2022 compressed.pdf · uploaded 7 May 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP51800045339 · IOA P1.pdf · uploaded 7 May 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentP51800045339 · IOA P2.pdf · uploaded 7 May 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentP51800045339 · IOA P3.pdf · uploaded 7 May 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentP51800045339 · IOA P4.pdf · uploaded 7 May 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentP51800045339 · IOA P5.pdf · uploaded 7 May 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentP51800045339 · IOA P6.pdf · uploaded 7 May 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentP51800045339 · IOA P7.pdf · uploaded 7 May 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentP51800045339 · IOA P8.pdf · uploaded 7 May 2022Source
- 9 Building Plan Approval / NA Order for plotted developmentP51800045339 · IOA P9.pdf · uploaded 7 May 2022Source
- 10 Building Plan Approval / NA Order for plotted developmentP51800045339 · IOA P10.pdf · uploaded 7 May 2022Source
- 11 Building Plan Approval / NA Order for plotted developmentP51800045339 · IOA P11.pdf · uploaded 7 May 2022Source
- 12 Building Plan Approval / NA Order for plotted developmentP51800045339 · IOA P12.pdf · uploaded 7 May 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP51800045339 · CC 13 Apr 2022_compressed.pdf · uploaded 7 May 2022Source
- 1 Declaration about Commencement CertificateP51800045339 · 3204_001.pdf · uploaded 7 May 2022Source
- 1 Declaration in FORM BP51800045339 · GM.pdf · uploaded 7 May 2022Source
- 2 Declaration in FORM BP51800045339 · MM.pdf · uploaded 7 May 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800045339 · 3206_001.pdf · uploaded 7 May 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800045339 · 3207_001.pdf · uploaded 7 May 2022Source
- 1 CERSAI detailsP51800045339 · 3196_001.pdf · uploaded 7 May 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800045339 · Form 3 compressed .pdf · uploaded 7 May 2022Source
- 1 Proforma of Allotment letterP51800045339 · Undertaking.pdf · uploaded 7 May 2022Source
- 2 Proforma of Allotment letterP51800045339 · Bellanza Allotment Letter format .pdf · uploaded 7 May 2022Source
- 1 OtherP51800045339 · DOA P1.pdf · uploaded 9 May 2022Source
- 2 OtherP51800045339 · DOA P2.pdf · uploaded 9 May 2022Source
- 3 OtherP51800045339 · DOA P3.pdf · uploaded 9 May 2022Source
- 4 OtherP51800045339 · DOA P4.pdf · uploaded 9 May 2022Source
- 5 OtherP51800045339 · DOA P5.pdf · uploaded 9 May 2022Source
- 6 OtherP51800045339 · DOA P6.pdf · uploaded 9 May 2022Source
- 7 OtherP51800045339 · DOA P7.pdf · uploaded 9 May 2022Source
- 3 Proforma of Allotment letterP51800045339 · Allotment draft.pdf · uploaded 15 Jul 2022Source
- 4 Proforma of Allotment letterP51800045339 · AFS draft comp.pdf · uploaded 15 Jul 2022Source
- 2 Details of encumbrancesP51800045339 · No Encumbrance Certificate 18 Jul 22.pdf · uploaded 18 Jul 2022Source
- 2 CERSAI detailsP51800045339 · CERSAI 18 Jul 22.pdf · uploaded 18 Jul 2022Source
- 1 PAN CardP51800046488 · Prestige Mulund Realty Pvt Ltd PAN - New_compressed 2.pdf · uploaded 21 Jul 2022Source
- 1 a Details of encumbrances concerned to FinanceP51800046488 · No Encumbrance 18 Jul 22.pdf · uploaded 21 Jul 2022Source
- 1 Copy of Layout Approval (in case of layout)P51800046488 · Layout Approval Plans dt 24 03 2022 (1 to 6)_compressed.pdf · uploaded 21 Jul 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP51800046488 · IOA-Sale 2- 1 July 2022.pdf · uploaded 21 Jul 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP51800046488 · CC-Sale 2- 1 July 2022.pdf · uploaded 21 Jul 2022Source
- 1 Declaration about Commencement CertificateP51800046488 · 0250_220721115332_001.pdf · uploaded 21 Jul 2022Source
- 1 b Details of encumbrances concerned to LegalP51800046488 · 0264_220722213819_001.pdf · uploaded 22 Jul 2022Source
- 1 Declaration in FORM BP51800046488 · 4168_001.pdf · uploaded 22 Jul 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800046488 · 0254_220722113637_001 compressed.pdf · uploaded 22 Jul 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800046488 · 4167_001.pdf · uploaded 22 Jul 2022Source
- 1 CERSAI detailsP51800046488 · 0258_220722191719_001.pdf · uploaded 22 Jul 2022Source
- 1 Status of ConveyanceP51800046488 · DOA P1.pdf · uploaded 22 Jul 2022Source
- 2 Status of ConveyanceP51800046488 · DOA P2.pdf · uploaded 22 Jul 2022Source
- 3 Status of ConveyanceP51800046488 · DOA P3.pdf · uploaded 22 Jul 2022Source
- 4 Status of ConveyanceP51800046488 · DOA P4.pdf · uploaded 22 Jul 2022Source
- 5 Status of ConveyanceP51800046488 · DOA P5.pdf · uploaded 22 Jul 2022Source
- 6 Status of ConveyanceP51800046488 · DOA P6.pdf · uploaded 22 Jul 2022Source
- 7 Status of ConveyanceP51800046488 · DOA P7.pdf · uploaded 22 Jul 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentP51800046488 · 1_compressed.pdf · uploaded 2 Aug 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentP51800046488 · 2_compressed.pdf · uploaded 2 Aug 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentP51800046488 · 3_compressed.pdf · uploaded 2 Aug 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentP51800046488 · 4_compressed.pdf · uploaded 2 Aug 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentP51800046488 · 5_compressed.pdf · uploaded 2 Aug 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentP51800046488 · 6_compressed.pdf · uploaded 2 Aug 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentP51800046488 · 7_compressed.pdf · uploaded 2 Aug 2022Source
- 9 Building Plan Approval / NA Order for plotted developmentP51800046488 · 8_compressed.pdf · uploaded 2 Aug 2022Source
- 10 Building Plan Approval / NA Order for plotted developmentP51800046488 · 9_compressed.pdf · uploaded 2 Aug 2022Source
- 11 Building Plan Approval / NA Order for plotted developmentP51800046488 · 10_compressed.pdf · uploaded 2 Aug 2022Source
- 12 Building Plan Approval / NA Order for plotted developmentP51800046488 · 11_compressed.pdf · uploaded 2 Aug 2022Source
- 13 Building Plan Approval / NA Order for plotted developmentP51800046488 · 12_compressed.pdf · uploaded 2 Aug 2022Source
- 14 Building Plan Approval / NA Order for plotted developmentP51800046488 · 13_compressed.pdf · uploaded 2 Aug 2022Source
- 15 Building Plan Approval / NA Order for plotted developmentP51800046488 · 14_compressed.pdf · uploaded 2 Aug 2022Source
- 16 Building Plan Approval / NA Order for plotted developmentP51800046488 · 15_compressed.pdf · uploaded 2 Aug 2022Source
- 17 Building Plan Approval / NA Order for plotted developmentP51800046488 · 16_compressed.pdf · uploaded 2 Aug 2022Source
- 18 Building Plan Approval / NA Order for plotted developmentP51800046488 · 17_compressed.pdf · uploaded 2 Aug 2022Source
- 19 Building Plan Approval / NA Order for plotted developmentP51800046488 · 18_compressed.pdf · uploaded 2 Aug 2022Source
- 20 Building Plan Approval / NA Order for plotted developmentP51800046488 · 19_compressed.pdf · uploaded 2 Aug 2022Source
- 21 Building Plan Approval / NA Order for plotted developmentP51800046488 · 20_compressed.pdf · uploaded 2 Aug 2022Source
- 22 Building Plan Approval / NA Order for plotted developmentP51800046488 · 21_compressed.pdf · uploaded 2 Aug 2022Source
- 23 Building Plan Approval / NA Order for plotted developmentP51800046488 · 22_compressed.pdf · uploaded 2 Aug 2022Source
- 24 Building Plan Approval / NA Order for plotted developmentP51800046488 · 23_compressed.pdf · uploaded 2 Aug 2022Source
- 25 Building Plan Approval / NA Order for plotted developmentP51800046488 · 24_compressed.pdf · uploaded 2 Aug 2022Source
- 26 Building Plan Approval / NA Order for plotted developmentP51800046488 · 25_compressed.pdf · uploaded 2 Aug 2022Source
- 27 Building Plan Approval / NA Order for plotted developmentP51800046488 · 26_compressed.pdf · uploaded 2 Aug 2022Source
- 28 Building Plan Approval / NA Order for plotted developmentP51800046488 · 27_compressed.pdf · uploaded 2 Aug 2022Source
- 29 Building Plan Approval / NA Order for plotted developmentP51800046488 · 28_compressed.pdf · uploaded 2 Aug 2022Source
- 2 CERSAI detailsP51800046488 · CERSAI_Asset_Based_Search_Report.pdf · uploaded 2 Aug 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · CA Certificate 1 of 5.pdf · uploaded 2 Aug 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51800046488 · 0295_220802124826_001.pdf · uploaded 2 Aug 2022Source
- 1 Copy of the legal title reportP51800046488 · Bellanza Title Certificate August 2,2022_compressed.pdf · uploaded 3 Aug 2022Source
- 1 Deviation Report with respect to Allotment letterP51800046488 · 0322_220803142500_001_compressed.pdf · uploaded 3 Aug 2022Source
- 1 Deviation Report with respect to model copy of AgreementP51800046488 · 0322_220803142500_001_compressed.pdf · uploaded 3 Aug 2022Source
- 1 Other – LegalP51800046488 · Undertaking on RERA Compliance.pdf · uploaded 3 Aug 2022Source
- 1 Other – TechnicalP51800046488 · 0260_220722201052_001.pdf · uploaded 3 Aug 2022Source
- 1 Proforma of Allotment letterP51800046488 · AFS Draft PDF_compressed.pdf · uploaded 4 Aug 2022Source
- 2 Proforma of Allotment letterP51800046488 · Payment Plan.pdf · uploaded 4 Aug 2022Source
- 3 Proforma of Allotment letterP51800046488 · Allotment Draft PDF.pdf · uploaded 4 Aug 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · CA Certificate 2 of 5.pdf · uploaded 5 Aug 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · CA Certificate 3 of 5.pdf · uploaded 5 Aug 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · CA Certificate 4 of 5.pdf · uploaded 5 Aug 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · CA Certificate 5 of 5.pdf · uploaded 5 Aug 2022Source
- 2 Other – TechnicalP51800046488 · 0335_220805164353_001.pdf · uploaded 5 Aug 2022Source
- 3 Other – TechnicalP51800046488 · Block Plan Bellanza 5 Aug 22.pdf · uploaded 5 Aug 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800045339 · Form 1 (1Architect)-30 Jun 22 (Wing ABC).pdf · uploaded 16 Aug 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800045339 · Bellanza Ph-1 Form-02- Q2 22 Comp.pdf · uploaded 16 Aug 2022Source
- 2 Declaration about Commencement CertificateP51800045339 · Form D_Declaration about CC_Bellanza Phase I.pdf · uploaded 12 Jan 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800045339 · Form 1_Architect_Q2 Bellanza (Phase 1).pdf · uploaded 12 Jan 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800045339 · Form 2_Engineer_Q2 Bellanza (Phase 1).pdf · uploaded 12 Jan 2023Source
- 1 Disclosure of sold/ booked inventoryP51800045339 · Sold_Unsold_Q2_Bellanza Phase 1.pdf · uploaded 12 Jan 2023Source
- 2 Disclosure of sold/ booked inventoryP51800045339 · Parking_Garages Q2_Bellanza Phase 1.pdf · uploaded 12 Jan 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800045339 · Form 3_CA_Q2_Bellanza_Phase 1.pdf · uploaded 12 Jan 2023Source
- 2 Declaration about Commencement CertificateP51800046488 · Form D - Declaration about CC_Bellanza_Phase II_161222.pdf · uploaded 21 Jan 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800046488 · Form 1_Architect_Q2 Bellanza (Phase 2).pdf · uploaded 21 Jan 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800046488 · Form 2_Engineer_Q2 Bellanza (Phase 2).pdf · uploaded 21 Jan 2023Source
- 1 Disclosure of sold/ booked inventoryP51800046488 · Sold_Unsold_ Q2_Bellanza Phase 2.pdf · uploaded 21 Jan 2023Source
- 2 Disclosure of sold/ booked inventoryP51800046488 · Parking_Garages Q2_Bellanza Phase 2.pdf · uploaded 21 Jan 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · Form 3_CA_Q2 Bellanza (Phase 2).pdf · uploaded 21 Jan 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800045339 · Q3- Form 1.pdf · uploaded 27 Sep 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800045339 · Q4- Form 1.pdf · uploaded 27 Sep 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800045339 · Q1- Form 1.pdf · uploaded 27 Sep 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800045339 · Q3- Form 2.pdf · uploaded 27 Sep 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800045339 · Q4- Form 2.pdf · uploaded 27 Sep 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800045339 · Q1- Form 2.pdf · uploaded 27 Sep 2023Source
- 3 Disclosure of sold/ booked inventoryP51800045339 · Q1- List of Sold-Unsold.pdf · uploaded 27 Sep 2023Source
- 4 Disclosure of sold/ booked inventoryP51800045339 · Q3- List of Sold-Unsold.pdf · uploaded 27 Sep 2023Source
- 5 Disclosure of sold/ booked inventoryP51800045339 · Q4- List of Sold-Unsold.pdf · uploaded 27 Sep 2023Source
- 6 Disclosure of sold/ booked inventoryP51800045339 · Q1- List of Sold-Unsold.pdf · uploaded 27 Sep 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800045339 · Q1- Form 3.pdf · uploaded 27 Sep 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800045339 · Q3- Form 3.pdf · uploaded 27 Sep 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800045339 · Q4- Form 3.pdf · uploaded 27 Sep 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800045339 · Q1- Form 3.pdf · uploaded 27 Sep 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800046488 · Form 1.pdf · uploaded 10 Oct 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800046488 · Form 1.pdf · uploaded 10 Oct 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800046488 · Form 1.pdf · uploaded 10 Oct 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800046488 · Form 2.pdf · uploaded 10 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800046488 · Form 2.pdf · uploaded 10 Oct 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800046488 · Form 2.pdf · uploaded 10 Oct 2023Source
- 3 Disclosure of sold/ booked inventoryP51800046488 · List of Sold-Unsold.pdf · uploaded 10 Oct 2023Source
- 4 Disclosure of sold/ booked inventoryP51800046488 · List of Sold-Unsold.pdf · uploaded 10 Oct 2023Source
- 5 Disclosure of sold/ booked inventoryP51800046488 · List of Sold-Unsold.pdf · uploaded 10 Oct 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · Form 3.pdf · uploaded 10 Oct 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · Form 3.pdf · uploaded 10 Oct 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · Form 3.pdf · uploaded 10 Oct 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800045339 · Form 1.pdf · uploaded 7 Nov 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800045339 · Form 2.pdf · uploaded 7 Nov 2023Source
- 7 Disclosure of sold/ booked inventoryP51800045339 · List of Sold - Unsold.pdf · uploaded 7 Nov 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800045339 · Form 3.pdf · uploaded 7 Nov 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800046488 · Form 1.pdf · uploaded 7 Nov 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800046488 · Form 2.pdf · uploaded 7 Nov 2023Source
- 6 Disclosure of sold/ booked inventoryP51800046488 · List of Sold - Unsold.pdf · uploaded 7 Nov 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · Form 3.pdf · uploaded 7 Nov 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800045339 · Form 1 Ballanza Phase 1.pdf · uploaded 3 Apr 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800045339 · Form - 2 - Bellanza Ph 1.pdf · uploaded 3 Apr 2024Source
- 8 Disclosure of sold/ booked inventoryP51800045339 · List sold unsold q2 2022-23_compressed_compressed.pdf · uploaded 3 Apr 2024Source
- 9 Disclosure of sold/ booked inventoryP51800045339 · Bellanza Phase I RERA Q3 - FY-23-24.pdf · uploaded 3 Apr 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800045339 · Bellanza Phase 1 - CA Certificate - form 3.pdf · uploaded 3 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51800045339 · Form 5.pdf · uploaded 3 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800046488 · Form 1 Bellanza Phase 2.pdf · uploaded 3 Apr 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800046488 · Form - 2 - Bellanza Ph 2.pdf · uploaded 3 Apr 2024Source
- 7 Disclosure of sold/ booked inventoryP51800046488 · Bellanza Phase II RERA Q3 - FY-23-24.pdf · uploaded 3 Apr 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · Bellanza Phase 2 - CA Certificate - Form 3.pdf · uploaded 3 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51800046488 · Form 5.pdf · uploaded 3 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51800045339 · FORM 2 A BALLANAZA PHASE 1.pdf · uploaded 7 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51800046488 · Form 2A BALLANZA pHASE 2.pdf · uploaded 7 Apr 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800045339 · Form 1 - Bellanza Phase -1 - Q4.pdf · uploaded 2 May 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800045339 · Form 2 - Bellanza Phase 1 - Q4.pdf · uploaded 2 May 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800045339 · Form 2 - Bellanza Phase 1 - Q4.pdf · uploaded 2 May 2024Source
- 10 Disclosure of sold/ booked inventoryP51800045339 · Q4 -Bellanza Phase I - FY23-24.pdf · uploaded 2 May 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800045339 · Ballanza Phase 1- Q4.pdf · uploaded 2 May 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800046488 · Form 1 - Bellanza Phase -2 - Q4.pdf · uploaded 2 May 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800046488 · Form 2 - Bellanza Phase 2 - Q4.pdf · uploaded 2 May 2024Source
- 8 Disclosure of sold/ booked inventoryP51800046488 · Q4-Bellanza Phase II - FY23-24.pdf · uploaded 2 May 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · Ballanza Phase 2- Q4.pdf · uploaded 2 May 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800045339 · Form 1 - Bellanza - Phase I.pdf · uploaded 14 Aug 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800045339 · Bellanza Phase I - Form 2.pdf · uploaded 14 Aug 2024Source
- 11 Disclosure of sold/ booked inventoryP51800045339 · Bellanza Phase 1 Sold unsold Q1.pdf · uploaded 14 Aug 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800045339 · Bellanza Phase 1 Form 3.pdf · uploaded 14 Aug 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800046488 · Form 1 - Bellanza - Phase II.pdf · uploaded 14 Aug 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800046488 · Bellanza Phase II - Form 2.pdf · uploaded 14 Aug 2024Source
- 9 Disclosure of sold/ booked inventoryP51800046488 · Bellanza Phase 2 TPCM sold unsold.pdf · uploaded 14 Aug 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · Bellanza Phase 2 form 3.pdf · uploaded 14 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800045339 · Bellanza Ph 1 Form 1 Q2.pdf · uploaded 7 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800045339 · Bellanza Ph 1 Form 3 Q2.pdf · uploaded 7 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800045339 · Bellanza Ph 1 Form 2 Q2.pdf · uploaded 7 Nov 2024Source
- 2 Disclosure of sold/ booked inventoryP51800045339 · Bellanza Ph 1 Sold Unsold Q2.pdf · uploaded 7 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800046488 · Bellanza Ph 2 Form 1 Q2.pdf · uploaded 7 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · Bellanza Ph 2 Form 3 Q2.pdf · uploaded 7 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800046488 · Bellanza Ph 2 Form 2 Q2.pdf · uploaded 7 Nov 2024Source
- 3 Disclosure of sold/ booked inventoryP51800046488 · Bellanza Ph 1 Sold Unsold Q2.pdf · uploaded 7 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51800045339 · Bellanza 1.pdf · uploaded 20 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51800045339 · Form 2 A Bellanza Ph1.pdf · uploaded 20 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51800045339 · Form 2 A Bellanza Ph1.pdf · uploaded 20 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51800045339 · Bellanza 1.pdf · uploaded 20 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51800046488 · Bellanza 2.pdf · uploaded 20 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51800046488 · Form 2 A Bellanza Ph 2.pdf · uploaded 20 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51800046488 · Form 2 A Bellanza Ph 2.pdf · uploaded 20 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51800046488 · Bellanza 2.pdf · uploaded 20 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800045339 · Bellanza Ph 1 Form 1 Q3.pdf · uploaded 29 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800045339 · Bellanza Ph 1 Form 3 Q3.pdf · uploaded 29 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800045339 · Bellanza Ph 1 Form 2 Q3.pdf · uploaded 29 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP51800045339 · Bellanza Ph 1 Sold Unsold Q3.pdf · uploaded 29 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800046488 · Bellanza Ph 1 Form 1 Q3.pdf · uploaded 29 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800046488 · Bellanza Ph 2 Form 1 Q3.pdf · uploaded 29 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · Bellanza Ph 2 Form 3 Q3.pdf · uploaded 29 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800046488 · Bellanza Ph 1 Form 2 Q3.pdf · uploaded 29 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800046488 · Bellanza Ph 2 Form 2 Q3.pdf · uploaded 29 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP51800046488 · Bellanza Ph 2 Sold Unsold Q2 (2).pdf · uploaded 29 Jan 2025Source
- 2 Disclosure of sold/ booked inventoryP51800046488 · Bellanza Ph 2 Sold Unsold Q3.pdf · uploaded 29 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800045339 · Form 1 Bellanza Ph 1 Q4.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800045339 · Form 3 Bellanza Ph 1.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800045339 · Form 2 Bellanza Ph 1 Q4.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP51800045339 · Sold Unsold Bellanza Ph 1 Q4.pdf · uploaded 19 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800046488 · Form 1 Bellanza Ph 2 Q4.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · Form 3 Bellanza Ph 2 Q4.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800046488 · Form 2 Bellanza Ph 2 Q4.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP51800046488 · Sold Unsold Bellanza Ph 2 Q4.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800045339 · Form 3 - Bellenza Ph 1 (Annexure 1)_11zon.pdf · uploaded 7 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800046488 · Form 3 -Bellenza Ph 2 (Annexure 1).pdf · uploaded 7 May 2025Source
- Form 1P51800045339 · Form 1.pdf · uploaded 23 Jan 2026Source
- Form 2P51800045339 · Form 2.pdf · uploaded 23 Jan 2026Source
- Form 3P51800045339 · Form 3.pdf · uploaded 23 Jan 2026Source
- Disclosure of Sold and Booked InventoryP51800045339 · Sold Unsold.pdf · uploaded 23 Jan 2026Source
- Form 1P51800045339 · Q2_Form 1.pdf · uploaded 23 Jan 2026Source
- Form 2P51800045339 · Q2 Form 2.pdf · uploaded 23 Jan 2026Source
- Form 3P51800045339 · Q2 Form 3.pdf · uploaded 23 Jan 2026Source
- Disclosure of Sold and Booked InventoryP51800045339 · Q2 sold unsold.pdf · uploaded 23 Jan 2026Source
- Form 1P51800045339 · Q3 Form 1.pdf · uploaded 23 Jan 2026Source
- Form 2P51800045339 · Q3 Form 2.pdf · uploaded 23 Jan 2026Source
- Form 3P51800045339 · Q3 Form 3.pdf · uploaded 23 Jan 2026Source
- Disclosure of Sold and Booked InventoryP51800045339 · Q3 Sold Unsold.pdf · uploaded 23 Jan 2026Source
- Form 1P51800046488 · Q1 Form 1.pdf · uploaded 23 Jan 2026Source
- Form 1P51800046488 · Q3 Form 1.pdf · uploaded 23 Jan 2026Source
- Form 1P51800046488 · Q2 Form 1.pdf · uploaded 23 Jan 2026Source
- Form 2P51800046488 · Q1 Form 2.pdf · uploaded 23 Jan 2026Source
- Form 2P51800046488 · Q3 Form 2.pdf · uploaded 23 Jan 2026Source
- Form 2P51800046488 · Q2 Form 2.pdf · uploaded 23 Jan 2026Source
- Form 3P51800046488 · Q1 Form 3.pdf · uploaded 23 Jan 2026Source
- Form 3P51800046488 · Q3 Form 3.pdf · uploaded 23 Jan 2026Source
- Form 3P51800046488 · Q2 Form 3.pdf · uploaded 23 Jan 2026Source
- Disclosure of Sold and Booked InventoryP51800046488 · Q1 Sold Unsold.pdf · uploaded 23 Jan 2026Source
- Disclosure of Sold and Booked InventoryP51800046488 · Q3 Sold Unsold.pdf · uploaded 23 Jan 2026Source
- Disclosure of Sold and Booked InventoryP51800046488 · Q2 _sold unsold.pdf · uploaded 23 Jan 2026Source
- Form 1P51800045339 · Qtr 4_Form 1_Bellanza Ph 1 Wing A B and C.pdf · uploaded 20 Apr 2026Source
- Form 2P51800045339 · Qtr 4_Form 2_Bellanza Ph 1 Wing A_B_C.pdf · uploaded 20 Apr 2026Source
- Form 3P51800045339 · Form 3_Bellanza Phase 1.pdf · uploaded 20 Apr 2026Source
- Disclosure of Sold and Booked InventoryP51800045339 · Q4_Bellanza Phase 1_Sold Unsold.pdf · uploaded 20 Apr 2026Source
- Form 1P51800046488 · Qtr 4_Form 1_Bellanza Ph 2 Wing DE F.pdf · uploaded 20 Apr 2026Source
- Form 2P51800046488 · Qtr 4_Form 2_Bellanza Ph 2 Wing D_E_ F.pdf · uploaded 20 Apr 2026Source
- Form 3P51800046488 · Form 3_Bellanza Phase 2.pdf · uploaded 20 Apr 2026Source
- Disclosure of Sold and Booked InventoryP51800046488 · Q4_Bellanza Phase 2_Sold Unsold.pdf · uploaded 20 Apr 2026Source
- Form 1P51800045339 · Q1 Form 1 Bellanza Ph 1.pdf · uploaded 20 Jul 2026Source
- Form 2P51800045339 · Q1 Form 2 Bellanza Ph1.pdf · uploaded 20 Jul 2026Source
- Form 3P51800045339 · Q1 Form 3 Bellanza PH 1.pdf · uploaded 20 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51800045339 · Q1 Sold Unsold Bellanza PH 1.pdf · uploaded 20 Jul 2026Source
- Form 1P51800046488 · Q1 Form 1 Bellanza Ph 2.pdf · uploaded 20 Jul 2026Source
- Form 2P51800046488 · Q1 Form 2 Bellanza Ph2.pdf · uploaded 20 Jul 2026Source
- Form 3P51800046488 · Q1 Form 3 Bellanza Ph 2.pdf · uploaded 20 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51800046488 · Q1 Sold Unsold Bellanza Ph 2.pdf · uploaded 20 Jul 2026Source
- Form 5 (FY 2025-2026)P51800045339 · Form 5 Bellanza Phase 1 FY 25-26 Signed.pdf · uploaded 1 Oct 2026Source
- Form 5 (FY 2025-2026)P51800046488 · Form 5 Bellanza Phase 2 FY 2025-26 Signed.pdf · uploaded 1 Oct 2026Source
Technical
- DocumentP51800045339 · Layout Approval Plans dt 24 03 2022 compressed.pdf · uploaded 7 May 2022Source
- DocumentP51800045339 · IOA P1.pdf · uploaded 7 May 2022Source
- DocumentP51800045339 · IOA P2.pdf · uploaded 7 May 2022Source
- DocumentP51800045339 · IOA P3.pdf · uploaded 7 May 2022Source
- DocumentP51800045339 · IOA P4.pdf · uploaded 7 May 2022Source
- DocumentP51800045339 · IOA P5.pdf · uploaded 7 May 2022Source
- DocumentP51800045339 · IOA P6.pdf · uploaded 7 May 2022Source
- DocumentP51800045339 · IOA P7.pdf · uploaded 7 May 2022Source
- DocumentP51800045339 · IOA P8.pdf · uploaded 7 May 2022Source
- DocumentP51800045339 · IOA P9.pdf · uploaded 7 May 2022Source
- DocumentP51800045339 · IOA P10.pdf · uploaded 7 May 2022Source
- DocumentP51800045339 · IOA P11.pdf · uploaded 7 May 2022Source
- DocumentP51800045339 · IOA P12.pdf · uploaded 7 May 2022Source
- DocumentP51800046488 · Layout Approval Plans dt 24 03 2022 (1 to 6)_compressed.pdf · uploaded 21 Jul 2022Source
- DocumentP51800046488 · IOA-Sale 2- 1 July 2022.pdf · uploaded 21 Jul 2022Source
- DocumentP51800046488 · 1_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 2_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 3_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 4_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 5_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 6_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 7_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 8_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 9_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 10_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 11_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 12_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 13_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 14_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 15_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 16_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 17_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 18_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 19_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 20_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 21_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 22_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 23_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 24_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 25_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 26_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 27_compressed.pdf · uploaded 2 Aug 2022Source
- DocumentP51800046488 · 28_compressed.pdf · uploaded 2 Aug 2022Source
- Other – TechnicalP51800046488 · 0260_220722201052_001.pdf · uploaded 3 Aug 2022Source
- Other – TechnicalP51800046488 · 0335_220805164353_001.pdf · uploaded 5 Aug 2022Source
- Other – TechnicalP51800046488 · Block Plan Bellanza 5 Aug 22.pdf · uploaded 5 Aug 2022Source
Technical (Architect)
- DocumentP51800045339 · Form 1 - Bellanza - Phase I.pdf · uploaded 14 Aug 2024Source
- DocumentP51800046488 · Form 1 - Bellanza - Phase II.pdf · uploaded 14 Aug 2024Source
- DocumentP51800045339 · Bellanza Ph 1 Form 1 Q2.pdf · uploaded 7 Nov 2024Source
- DocumentP51800046488 · Bellanza Ph 2 Form 1 Q2.pdf · uploaded 7 Nov 2024Source
- DocumentP51800045339 · Bellanza Ph 1 Form 1 Q3.pdf · uploaded 29 Jan 2025Source
- DocumentP51800046488 · Bellanza Ph 1 Form 1 Q3.pdf · uploaded 29 Jan 2025Source
- DocumentP51800046488 · Bellanza Ph 2 Form 1 Q3.pdf · uploaded 29 Jan 2025Source
- DocumentP51800045339 · Form 1 Bellanza Ph 1 Q4.pdf · uploaded 19 Apr 2025Source
- DocumentP51800046488 · Form 1 Bellanza Ph 2 Q4.pdf · uploaded 19 Apr 2025Source
Technical (Engineer)
- DocumentP51800045339 · Bellanza Phase I - Form 2.pdf · uploaded 14 Aug 2024Source
- DocumentP51800046488 · Bellanza Phase II - Form 2.pdf · uploaded 14 Aug 2024Source
- DocumentP51800045339 · Bellanza Ph 1 Form 2 Q2.pdf · uploaded 7 Nov 2024Source
- DocumentP51800046488 · Bellanza Ph 2 Form 2 Q2.pdf · uploaded 7 Nov 2024Source
- DocumentP51800045339 · Bellanza Ph 1 Form 2 Q3.pdf · uploaded 29 Jan 2025Source
- DocumentP51800046488 · Bellanza Ph 1 Form 2 Q3.pdf · uploaded 29 Jan 2025Source
- DocumentP51800046488 · Bellanza Ph 2 Form 2 Q3.pdf · uploaded 29 Jan 2025Source
- DocumentP51800045339 · Form 2 Bellanza Ph 1 Q4.pdf · uploaded 19 Apr 2025Source
- DocumentP51800046488 · Form 2 Bellanza Ph 2 Q4.pdf · uploaded 19 Apr 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Kurla, Kurla taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- By CTS No 18 D
- South
- By 13 point 40 m wide DP Road
- East
- By CTS No 19-6 and SU Motors
- West
- By 13 point 40m wide proposed DP Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Chartered accountant | Muniyal Padmanabha Bhat | — | P51800046488 |
| Chartered accountant | Muniyal Padmanabha Bhat | — | P51800045339 |
Source: MahaRERA project page. Contact details are not shown.