Kurla, Mumbai Suburban 400080 |Promoter: Alag Property Constructions Pvt. Ltd.

9 May 2019Registered with MahaRERA
30 Jun 2024Promised completion
31 Dec 2026Revised completionPushed back 2 years and 6 months
3Buildings
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Active
Buildings
3
Land area for this project
3,658 sq m (39,379 sq ft)
Permissible built-up area
13,000 sq m (1,39,931 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
732 sq m (7,876 sq ft)
Address
Cts No.661/1 Part, 661/2, Mulund Goregaon Link Road, Mulund WestPIN 400080
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.16136, 72.94569
Alag Capital is at latitude 19.16136, longitude 72.94569.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 2 years and 6 months

Registered
9 May 2019
Promised
30 Jun 2024
Revised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P518000207739 May 201930 Jun 202431 Dec 2026Alag Property Constructions Pvt. Ltd.Project page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Alag Capital 1a20—
Alag Capital 1b20—
Alag Capital 1c4—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Alag Capital 1aClosed/Covered000020
Alag Capital 1aOpen Space00000
Alag Capital 1bClosed/Covered000030
Alag Capital 1bOpen Space00000
Alag Capital 1cClosed/Covered000019
Alag Capital 1cOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Alag Capital 1a

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)60%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Alag Capital 1b

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)50%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Alag Capital 1c

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyFrom M.C.G.M0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)From M.C.G.M0%
  • Storm Water DrainsAs Per SWC NOC0%
  • Landscaping & Tree PlantingAs Per Tree NOC0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalAs Per SWC NOC50%
  • Water conservation /Rain water harvestingBEFORE OC0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAs Per CFO NOC0%
  • Electrical meter room, sub-station, receiving stationBEFORE OC0%
  • Aggregate area of recreational Open SpaceBEFORE OC0%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

104 documents held by Deedo, 195 filings listed on MahaRERA's project page

Others

Registration certificate

Extension certificate

Document library

  • Details of encumbrancesNon Encumbrance Certificate.pdf · uploaded 4 May 2019View
  • Declaration in FORM BForm B.pdf · uploaded 4 May 2019View
  • Commencement Certificates / NA Order for plotted development2210669_FirstCC_signed.pdf · uploaded 4 May 2019View
  • Building Plan Approval (IOD)IOD NEW.pdf · uploaded 4 May 2019View
  • Proforma of Allotment letterDRAFT ALLOTMENT LETTER.pdf · uploaded 4 May 2019View
  • Copy of the legal title reportTITLE CERTIFICATE_p008.pdf · uploaded 4 May 2019View
  • Copy of Layout Approval (in case of layout)FINAL CONCESSION PLAN_p016-017.pdf · uploaded 4 May 2019View
  • Copy of the legal title reportTITLE CERTIFICATE_p001.pdf · uploaded 28 Jun 2019View
  • Copy of the legal title reportTITLE CERTIFICATE_p002.pdf · uploaded 28 Jun 2019View
  • Copy of the legal title reportTITLE CERTIFICATE_p003.pdf · uploaded 28 Jun 2019View
  • Copy of the legal title reportTITLE CERTIFICATE_p004.pdf · uploaded 28 Jun 2019View
  • Copy of the legal title reportTITLE CERTIFICATE_p005.pdf · uploaded 28 Jun 2019View
  • Copy of the legal title reportTITLE CERTIFICATE_p006.pdf · uploaded 28 Jun 2019View
  • Copy of the legal title reportTITLE CERTIFICATE_p007.pdf · uploaded 28 Jun 2019View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Society certificate.pdf · uploaded 3 Jul 2019View
  • Status of ConveyanceDEED OF CONVEYANCE 1.pdf · uploaded 4 Jul 2019View
  • Status of ConveyanceDEED OF CONVEYANCE 2.pdf · uploaded 4 Jul 2019View
  • Status of ConveyanceDEED OF CONVEYANCE 3.pdf · uploaded 4 Jul 2019View
  • Status of ConveyanceDEED OF CONVEYANCE 4.pdf · uploaded 4 Jul 2019View
  • Status of ConveyanceDEED OF CONVEYANCE 5.pdf · uploaded 4 Jul 2019View
  • Status of ConveyanceDEED OF CONVEYANCE 6.pdf · uploaded 4 Jul 2019View
  • Status of ConveyanceDEED OF CONVEYANCE 7.pdf · uploaded 4 Jul 2019View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Ceritificate from Architec dated 27092019.pdf · uploaded 22 Nov 2019View
  • Copy of Layout Approval (in case of layout)1683- alag capital - Plan Deole-1-2.pdf · uploaded 22 Nov 2019View
  • Copy of Layout Approval (in case of layout)1683- alag capital - Plan Deole-3-5-1-2.pdf · uploaded 22 Nov 2019View
  • Copy of Layout Approval (in case of layout)1683- alag capital - Plan Deole-3-5-3.pdf · uploaded 22 Nov 2019View
  • Copy of Layout Approval (in case of layout)1683- alag capital - Plan Deole-6-8-1-2.pdf · uploaded 22 Nov 2019View
  • Copy of Layout Approval (in case of layout)1683- alag capital - Plan Deole-6-8-3.pdf · uploaded 22 Nov 2019View
  • Copy of Layout Approval (in case of layout)1683- alag capital - Plan Deole-9-11-1-2.pdf · uploaded 22 Nov 2019View
  • Copy of Layout Approval (in case of layout)1683- alag capital - Plan Deole-9-11-3.pdf · uploaded 22 Nov 2019View
  • Copy of Layout Approval (in case of layout)1683- alag capital - Plan Deole-12-15-1-2.pdf · uploaded 22 Nov 2019View
  • Copy of Layout Approval (in case of layout)1683- alag capital - Plan Deole-12-15-3-4.pdf · uploaded 22 Nov 2019View
  • Copy of Layout Approval (in case of layout)1683- alag capital - Plan Deole-16-17.pdf · uploaded 22 Nov 2019View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Ceritificate - Alag Capital - Form 2.pdf · uploaded 20 Jan 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A - Capital - 300919.pdf · uploaded 27 Feb 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A - Capital - 311219.pdf · uploaded 27 Feb 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Alag Capital - 201819 - Form 5.pdf · uploaded 6 Mar 2020View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0001-0001.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0002-0002.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0003-0003.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0004-0004.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0005-0005.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0006-0006.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0007-0007.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0008-0008.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0009-0009.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0010-0010.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0011-0011.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0012-0012.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0013-0013.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0014-0014.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0015-0015.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0016-0016.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0017-0017.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0018-0018.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0019-0019.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0020-0020.pdf · uploaded 13 Jun 2023View
  • Copy of Layout Approval (in case of layout)concession plan (1)_0021-0021.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0001-0001.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0002-0002.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0003-0003.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0004-0004.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0005-0005.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0006-0006.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0007-0007.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0008-0008.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0009-0009.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0010-0010.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0011-0011.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0012-0012.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0013-0013.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0014-0014.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0015-0015.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0016-0016.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0017-0017.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0018-0018.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0019-0019.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0020-0020.pdf · uploaded 13 Jun 2023View
  • Building Plan Approval (IOD)concession plan (1)_0021-0021.pdf · uploaded 13 Jun 2023View
  • Commencement Certificates / NA Order for plotted developmentFurtherCC.pdf · uploaded 13 Jun 2023View
  • Declaration about Commencement CertificateDeclaration for Commencement Certificate.pdf · uploaded 22 Jun 2023View
  • Declaration in FORM BFORM -B.pdf · uploaded 18 Dec 2024View
  • Declaration about Commencement CertificateFORMAT D (32).pdf · uploaded 18 Dec 2024View
  • CERSAI detailsDECLARATION of Cersai.pdf · uploaded 18 Dec 2024View
  • Declaration about all RERA Designated Bank Accounts (Format A)Format A - Seperate Bank Account Details.pdf · uploaded 18 Dec 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Format N.pdf · uploaded 18 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2024.pdf · uploaded 4 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Alag Capital as on June 2024.pdf · uploaded 4 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Alag Capital as on March 2024.pdf · uploaded 4 Jan 2025View
  • Disclosure of sold/ booked inventoryCIRCULAR 29 Final.pdf · uploaded 4 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Alag Capital as on September 2024.pdf · uploaded 4 Jan 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 of Alag capital as on 31-03-2020.pdf · uploaded 4 Jan 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 of Alag capital as on 31-03-2021.pdf · uploaded 4 Jan 2025View
  • CERSAI detailsDECLARATION of Cersai.pdf · uploaded 4 Jan 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 of Alag capital as on 31-03-2022.pdf · uploaded 4 Jan 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 of Alag capital as on 31-03-2023.pdf · uploaded 4 Jan 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 of Alag capital as on 31-03-2024.pdf · uploaded 4 Jan 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM2A_20-21.pdf · uploaded 6 Jan 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM2A_21-22.pdf · uploaded 6 Jan 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM2A_22-23.pdf · uploaded 6 Jan 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM2A_23-24.pdf · uploaded 6 Jan 2025View
  • Copy of Layout Approval (in case of layout)Drawing (2).pdf · uploaded 21 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Alag Capital as on March 2023.pdf · uploaded 24 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Alag Capital as on June 2023.pdf · uploaded 24 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Alag Capital as on March 2024.pdf · uploaded 24 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Alag Capital as on Dec 2023.pdf · uploaded 24 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Alag Capital as on Sep 2023.pdf · uploaded 24 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Alag Capital as on Dec 2024.pdf · uploaded 24 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Alag Capital as on September 2024.pdf · uploaded 24 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Alag Capital as on June 2024.pdf · uploaded 24 Jan 2025View
  • Disclosure of sold/ booked inventoryCIRCULAR 29.pdf · uploaded 24 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2023.pdf · uploaded 24 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2023.pdf · uploaded 24 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 2023.pdf · uploaded 24 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2024.pdf · uploaded 24 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2024.pdf · uploaded 24 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2024.pdf · uploaded 24 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 MAr 2024.pdf · uploaded 24 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2023.pdf · uploaded 24 Jan 2025View
  • Copy of Layout Approval (in case of layout)1-2.pdf · uploaded 3 Feb 2025View
  • Building Plan Approval (IOD)3-4.pdf · uploaded 3 Feb 2025View
  • Building Plan Approval (IOD)5-6.pdf · uploaded 3 Feb 2025View
  • Building Plan Approval (IOD)7-8.pdf · uploaded 3 Feb 2025View
  • Building Plan Approval (IOD)9-11.pdf · uploaded 3 Feb 2025View

Promoter documents

  • Declaration Form BForm B.pdf · uploaded 4 May 2019View
  • Legal Title reportTITLE CERTIFICATE_p008.pdf · uploaded 4 May 2019View
  • Legal Title reportTITLE CERTIFICATE_p001.pdf · uploaded 28 Jun 2019View
  • Legal Title reportTITLE CERTIFICATE_p002.pdf · uploaded 28 Jun 2019View
  • Legal Title reportTITLE CERTIFICATE_p003.pdf · uploaded 28 Jun 2019View
  • Legal Title reportTITLE CERTIFICATE_p004.pdf · uploaded 28 Jun 2019View
  • Legal Title reportTITLE CERTIFICATE_p005.pdf · uploaded 28 Jun 2019View
  • Legal Title reportTITLE CERTIFICATE_p006.pdf · uploaded 28 Jun 2019View
  • Legal Title reportTITLE CERTIFICATE_p007.pdf · uploaded 28 Jun 2019View
  • Declaration Form BFORM -B.pdf · uploaded 18 Dec 2024View

Technical documents

  • Layout Approval1683- alag capital - Plan Deole-1-2.pdfView
  • Layout Approval1683- alag capital - Plan Deole-3-5-1-2.pdfView
  • Layout Approval1683- alag capital - Plan Deole-3-5-3.pdfView
  • Layout Approval1683- alag capital - Plan Deole-6-8-1-2.pdfView
  • Layout Approval1683- alag capital - Plan Deole-6-8-3.pdfView
  • Layout Approval1683- alag capital - Plan Deole-9-11-1-2.pdfView
  • Layout Approval1683- alag capital - Plan Deole-9-11-3.pdfView
  • Layout Approval1683- alag capital - Plan Deole-12-15-1-2.pdfView
  • Layout Approval1683- alag capital - Plan Deole-12-15-3-4.pdfView
  • Layout Approval1683- alag capital - Plan Deole-16-17.pdfView
  • Layout Approvalconcession plan (1)_0014-0014.pdfView
  • Layout Approvalconcession plan (1)_0015-0015.pdfView
  • Layout Approvalconcession plan (1)_0016-0016.pdfView
  • Layout Approvalconcession plan (1)_0017-0017.pdfView
  • Layout Approvalconcession plan (1)_0018-0018.pdfView
  • Layout Approvalconcession plan (1)_0019-0019.pdfView
  • Layout Approvalconcession plan (1)_0020-0020.pdfView
  • Layout Approvalconcession plan (1)_0021-0021.pdfView
  • Building Plan Approvalconcession plan (1)_0001-0001.pdfView
  • Building Plan Approvalconcession plan (1)_0002-0002.pdfView
  • Building Plan Approvalconcession plan (1)_0003-0003.pdfView
  • Building Plan Approvalconcession plan (1)_0004-0004.pdfView
  • Building Plan Approvalconcession plan (1)_0005-0005.pdfView
  • Building Plan Approvalconcession plan (1)_0006-0006.pdfView
  • Building Plan Approvalconcession plan (1)_0007-0007.pdfView
  • Building Plan Approvalconcession plan (1)_0008-0008.pdfView
  • Building Plan Approvalconcession plan (1)_0009-0009.pdfView
  • Building Plan Approvalconcession plan (1)_0010-0010.pdfView
  • Building Plan Approvalconcession plan (1)_0011-0011.pdfView
  • Building Plan Approvalconcession plan (1)_0012-0012.pdfView
  • Building Plan Approvalconcession plan (1)_0013-0013.pdfView
  • Building Plan Approvalconcession plan (1)_0014-0014.pdfView
  • Building Plan Approvalconcession plan (1)_0015-0015.pdfView
  • Building Plan Approvalconcession plan (1)_0016-0016.pdfView
  • Building Plan Approvalconcession plan (1)_0017-0017.pdfView
  • Building Plan Approvalconcession plan (1)_0018-0018.pdfView
  • Building Plan Approvalconcession plan (1)_0019-0019.pdfView
  • Building Plan Approvalconcession plan (1)_0020-0020.pdfView
  • Building Plan Approvalconcession plan (1)_0021-0021.pdfView
  • Layout Approvalconcession plan (1)_0005-0005.pdfView
  • Layout Approvalconcession plan (1)_0006-0006.pdfView
  • Layout Approvalconcession plan (1)_0007-0007.pdfView
  • Layout Approvalconcession plan (1)_0008-0008.pdfView
  • Layout Approvalconcession plan (1)_0009-0009.pdfView
  • Layout Approvalconcession plan (1)_0010-0010.pdfView
  • Layout Approvalconcession plan (1)_0011-0011.pdfView
  • Layout Approvalconcession plan (1)_0012-0012.pdfView
  • Layout Approvalconcession plan (1)_0013-0013.pdfView
  • Layout Approvalconcession plan (1)_0001-0001.pdfView
  • Layout Approvalconcession plan (1)_0002-0002.pdfView
  • Layout Approvalconcession plan (1)_0003-0003.pdfView
  • Layout Approvalconcession plan (1)_0004-0004.pdfView
  • Building Plan ApprovalIOD NEW.pdfView
  • Layout ApprovalFINAL CONCESSION PLAN_p016-017.pdfView
  • Layout ApprovalDrawing (2).pdfView
  • Layout Approval1-2.pdfView
  • Building Plan Approval3-4.pdfView
  • Building Plan Approval5-6.pdfView
  • Building Plan Approval7-8.pdfView
  • Building Plan Approval9-11.pdfView

Proforma allotment letter

  • Proforma allotment letterDRAFT ALLOTMENT LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kurla, Kurla taluka

Survey, CTS, gat or plot numbers

661/2CTS NO.661/1 PART

As published on MahaRERA's project page

CTS NO.661/1 PART, 661/2

Boundaries

North
30 Feet Internal Road
South
Mulund Goregaon Link Road
East
Niranjan Chs Ltd
West
J N Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDeole Bros—
Chartered accountantTwinkle Nishar—
OtherVivek Ravani—

Source: MahaRERA project page. Contact details are not shown.