EKTA CO. OP. HSG. SOC. Prop
LapsedGreater Mumbai (M Corp.) (Part) (802794), Mumbai Suburban 400097 |Promoter: Poonam Housecon Pvt. Ltd.
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Lapsed
- Buildings
- 2
- Land area for this project
- 3,808 sq m (40,987 sq ft)
- Permissible built-up area
- 21,500 sq m (2,31,424 sq ft)
- Sanctioned built-up area
- 15,745 sq m (1,69,476 sq ft)
- Recreational open space
- 291 sq m (3,132 sq ft)
- Address
- C.T.S. No. 581A/3B/1pt, 581A/3B/1/1 to 9, of Village-Malad, Taluka-Borivali, Abdul Gani Compound, Rani Sati Marg, Malad East, Mumbai-400097, Rani Sati Marg, Malad EastPIN 400097
- Designated bank account
- Indian Bank
- Litigation declared by promoter
- None declared
- Financial encumbrance declared
- None declared
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 6 months
The latest completion date on record passed 1 year and 4 months ago.
- Registered
- 27 Jan 2020
- Promised
- 30 Dec 2024
- Revised
- 30 Jun 2025
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51800024202 | 27 Jan 2020 | 30 Dec 2024 | 30 Jun 2025 | Poonam Housecon Pvt. Ltd. | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building (P51800024202) | — | — |
| Vaishno Heights | 27 | — |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 units registered
Parking
| Type | Two-wheeler | Four-wheeler | Bus | Visitor | Total |
|---|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 0 | 1 |
| Open Space | 0 | 0 | 0 | 0 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Construction progress
Work completed, as the promoter reported it to MahaRERA (Form 1)
Vaishno Heights
Show all 11 activitiesShow fewer activities
Common areas and amenities
Show all 15 activitiesShow fewer activities
Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.
Documents
97 documents held by Deedo, 149 filings listed on MahaRERA's project page
Commencement certificate (4)
Show all 246 documentsShow fewer documents
Form 1 (6)
Allotment letter (13)
- Allotment letter15 Jan 2020ViewSource
- Allotment letter15 Jan 2020ViewSource
- Allotment letter15 Jan 2020ViewSource
- Allotment letter15 Jan 2020ViewSource
- Allotment letter15 Jan 2020ViewSource
- Allotment letter15 Jan 2020ViewSource
- Allotment letter15 Jan 2020ViewSource
- Allotment letter15 Jan 2020ViewSource
- Allotment letter15 Jan 2020ViewSource
- Allotment letter15 Jan 2020ViewSource
- Allotment letter15 Jan 2020ViewSource
- Allotment letter17 Jan 2020ViewSource
- Allotment letterDate not statedViewSource
Form 2 (5)
Form 5 (4)
Other (10)
Form 2A (5)
Layout plan (42)
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
Document library
- Copy of the legal title reportFINAL TITLE.pdf · uploaded 17 Dec 2019View
- Commencement Certificates / NA Order for plotted developmentCC Dt 29112019.pdf · uploaded 17 Dec 2019View
- Copy of Layout Approval (in case of layout)Intimation of approval_compressed.pdf · uploaded 15 Jan 2020View
- Building Plan Approval / NA Order for plotted developmentIntimation of approval_compressed.pdf · uploaded 15 Jan 2020View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate 2.pdf · uploaded 15 Jan 2020View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate.pdf · uploaded 15 Jan 2020View
- Proforma of Allotment letterpg 1-4.pdf · uploaded 15 Jan 2020View
- Proforma of Allotment letterpg 5-8.pdf · uploaded 15 Jan 2020View
- Proforma of Allotment letterpg 9-12.pdf · uploaded 15 Jan 2020View
- Proforma of Allotment letterpg 13-16.pdf · uploaded 15 Jan 2020View
- Proforma of Allotment letterpg 17-20.pdf · uploaded 15 Jan 2020View
- Proforma of Allotment letterPG 21-24.pdf · uploaded 15 Jan 2020View
- Proforma of Allotment letterPG 29-32.pdf · uploaded 15 Jan 2020View
- Proforma of Allotment letterPG 33-36.pdf · uploaded 15 Jan 2020View
- Proforma of Allotment letterPG 33-36.pdf · uploaded 15 Jan 2020View
- Proforma of Allotment letterPG 37-40.pdf · uploaded 15 Jan 2020View
- Proforma of Allotment letterpg 41-44.pdf · uploaded 15 Jan 2020View
- Proforma of Allotment letterpg 45-48.pdf · uploaded 15 Jan 2020View
- Proforma of Allotment letterpg 49-51.pdf · uploaded 15 Jan 2020View
- Declaration in FORM BForm-B affidavit.pdf · uploaded 15 Jan 2020View
- Details of encumbrancesNo Encumbrance certificate.pdf · uploaded 16 Jan 2020View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's certificate.pdf · uploaded 16 Jan 2020View
- Proforma of Allotment letterAllotement Letter.pdf · uploaded 17 Jan 2020View
- OtherPHPL Flat Booking Details.pdf · uploaded 23 Nov 2020View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Rera.pdf · uploaded 23 Nov 2020View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate (2).pdf · uploaded 23 Nov 2020View
- Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 23 Nov 2020View
- Building Plan Approval / NA Order for plotted developmentLOI.pdf · uploaded 23 Nov 2020View
- Copy of Layout Approval (in case of layout)scan plan 13_cpmpressed.pdf · uploaded 8 Feb 2021View
- Copy of Layout Approval (in case of layout)scan letor_compressed FINAL_.pdf · uploaded 8 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 1_compressed_compressed (1).pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 1_compressed_compressed (1).pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 2_compressed_compressed (1).pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 3_compressed_compressed (1).pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 4_compressed_compressed (1).pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 5_compressed_compressed (1).pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 6_compressed_compressed (1).pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 7_compressed_compressed (1).pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 8_compressed_compressed (1).pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 9_compressed_compressed (1).pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 10_compressed_compressed (1).pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 11_compressed_compressed.pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 12_compressed_compressed (1).pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 14_compressed_compressed (1).pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 15_compressed_compressed.pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 16_compressed_compressed.pdf · uploaded 9 Feb 2021View
- Copy of Layout Approval (in case of layout)scan plan 13_compressed_compressed.pdf · uploaded 9 Feb 2021View
- Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5_FY 2019-20.pdf · uploaded 30 May 2022View
- Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5_FY 2020-21.pdf · uploaded 30 May 2022View
- Copy of Layout Approval (in case of layout)1.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)1x1_11zon.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)2_11zon.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)3_11zon.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)4_11zon.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)5_11zon.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)6_11zon.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)7_11zon.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)8_11zon.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)9_11zon.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)10_11zon.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)11 (2)_11zon.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)12_11zon.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)13_11zon.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)14_11zon.pdf · uploaded 23 Feb 2023View
- Copy of Layout Approval (in case of layout)15_11zon.pdf · uploaded 23 Feb 2023View
- Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5.pdf · uploaded 6 Apr 2023View
- Copy of Layout Approval (in case of layout)part 1.pdf · uploaded 7 Apr 2023View
- Copy of Layout Approval (in case of layout)part 2.pdf · uploaded 7 Apr 2023View
- Copy of Layout Approval (in case of layout)part 3.pdf · uploaded 7 Apr 2023View
- Copy of Layout Approval (in case of layout)part 4.pdf · uploaded 7 Apr 2023View
- Copy of Layout Approval (in case of layout)part 5.pdf · uploaded 7 Apr 2023View
- Copy of Layout Approval (in case of layout)part 6.pdf · uploaded 7 Apr 2023View
- Copy of Layout Approval (in case of layout)OC 16_compressed.pdf · uploaded 8 Apr 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)PHPL Architect Certificate.pdf · uploaded 17 Apr 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Amar Singh Engineer Certificate.pdf · uploaded 20 Jun 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 22 Aug 2023View
- Disclosure of sold/ booked inventoryDisclosure of Inventory details.pdf · uploaded 1 Nov 2023View
- Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5.pdf · uploaded 5 Mar 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Rera 310324.pdf · uploaded 3 Dec 2024View
- Commencement Certificates / NA Order for plotted developmentCC Re endorsed ekta chs.pdf · uploaded 3 Dec 2024View
- Building Plan Approval / NA Order for plotted developmentRev LOI .pdf · uploaded 3 Dec 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)PHPL Architect Certificate.pdf · uploaded 3 Dec 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Vaishno Heights Eng Certificate 310324.pdf · uploaded 13 Dec 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Vaishno Heights Eng Certificate 300924.pdf · uploaded 13 Dec 2024View
- Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 13 Dec 2024View
- a Details of encumbrances concerned to Finance1 Details of encumbrances.pdf · uploaded 13 Dec 2024View
- b Details of encumbrances concerned to Legal1 Details of encumbrances.pdf · uploaded 13 Dec 2024View
- Declaration in FORM BAffidavit Cum Declaration.pdf · uploaded 13 Dec 2024View
- Declaration about Commencement CertificateFormat D.pdf · uploaded 13 Dec 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A 19-20.pdf · uploaded 13 Dec 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A 20-21.pdf · uploaded 13 Dec 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 21-22.pdf · uploaded 13 Dec 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 22-23.pdf · uploaded 13 Dec 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 23-24.pdf · uploaded 13 Dec 2024View
- CERSAI detailsCERSAI_Search_Report_200331417977_For_Asset_Based_Search_13_12_2024_15_30_08_872.pdf · uploaded 13 Dec 2024View
- Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 23-24_11zon.pdf · uploaded 14 Dec 2024View
- Declaration about all RERA Designated Bank Accounts (Format A)Format A.pdf · uploaded 19 Dec 2024View
- Disclosure of Interest in Other Real Estate OrganizationsAll DINS.pdf · uploaded 19 Dec 2024View
Promoter documents
Technical documents
- Layout ApprovalIntimation of approval_compressed.pdfView
- Building Plan ApprovalIntimation of approval_compressed.pdfView
- Building Plan ApprovalLOI.pdfView
- Layout Approvalscan plan 1_compressed_compressed (1).pdfView
- Layout Approvalscan plan 1_compressed_compressed (1).pdfView
- Layout Approvalscan plan 2_compressed_compressed (1).pdfView
- Layout Approvalscan plan 3_compressed_compressed (1).pdfView
- Layout Approvalscan plan 4_compressed_compressed (1).pdfView
- Layout Approvalscan plan 13_cpmpressed.pdfView
- Layout Approvalscan letor_compressed FINAL_.pdfView
- Layout Approvalscan plan 13_compressed_compressed.pdfView
- Layout Approvalscan plan 5_compressed_compressed (1).pdfView
- Layout Approvalscan plan 6_compressed_compressed (1).pdfView
- Layout Approvalscan plan 7_compressed_compressed (1).pdfView
- Layout Approvalscan plan 8_compressed_compressed (1).pdfView
- Layout Approvalscan plan 9_compressed_compressed (1).pdfView
- Layout Approvalscan plan 10_compressed_compressed (1).pdfView
- Layout Approvalscan plan 11_compressed_compressed.pdfView
- Layout Approvalscan plan 12_compressed_compressed (1).pdfView
- Layout Approvalscan plan 14_compressed_compressed (1).pdfView
- Layout Approvalscan plan 15_compressed_compressed.pdfView
- Layout Approvalscan plan 16_compressed_compressed.pdfView
- Layout Approval1.pdfView
- Layout Approval1x1_11zon.pdfView
- Layout Approval2_11zon.pdfView
- Layout Approval3_11zon.pdfView
- Layout Approval4_11zon.pdfView
- Layout Approval5_11zon.pdfView
- Layout Approval6_11zon.pdfView
- Layout Approval7_11zon.pdfView
- Layout Approval8_11zon.pdfView
- Layout Approval9_11zon.pdfView
- Layout Approval10_11zon.pdfView
- Layout Approval11 (2)_11zon.pdfView
- Layout Approval12_11zon.pdfView
- Layout Approval13_11zon.pdfView
- Layout Approval14_11zon.pdfView
- Layout Approval15_11zon.pdfView
- Layout ApprovalOC 16_compressed.pdfView
- Layout Approvalpart 1.pdfView
- Layout Approvalpart 2.pdfView
- Layout Approvalpart 3.pdfView
- Layout Approvalpart 4.pdfView
- Layout Approvalpart 5.pdfView
- Layout Approvalpart 6.pdfView
- Building Plan ApprovalRev LOI .pdfView
Other legal documents
- OtherPHPL Flat Booking Details.pdfView
Proforma allotment letter
- Proforma allotment letterpg 9-12.pdfView
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Greater Mumbai (M Corp.) (Part) (802794), Mumbai taluka
Survey, CTS, gat or plot numbers
As published on MahaRERA's project page
C.T.S. No. 581A/3B/1pt,581A/3B/1/1 to 9, of Village-Malad, Taluka-Borivali, Abdul Gani Compound, Rani Sati Marg, Malad East, Mumbai-400097
Boundaries
- North
- 18 m wide R S Marg
- South
- Existing building Gautam Apt
- East
- Existing Slum Structure
- West
- Adjust plot bearing 581A 3B 1 part
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Vishwas Satodia | — |
| Chartered accountant | Sudhir R Shah | — |
| Engineer | Neel Dholia | — |
| Other | Mansukh Ramoliya | — |
Source: MahaRERA project page. Contact details are not shown.