Ghatkopar, Mumbai Suburban 400075 |Promoter: Shree Dham Developers

Residential / Group HousingRERAP51800052215
31 Jul 2023Registered with MahaRERA
30 Jun 2027Promised completion
1Building
75Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
1
Unit types
1BHK, 2BHK, 3BHK75 units in all
Land area for this project
777 sq m (8,369 sq ft)
Permissible built-up area
5,680 sq m (61,137 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Address
184 Pt, Pant Nagar, Ghatkopar EastPIN 400075
Designated bank account
Bharat Cooperative Bank Mumbai Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
90 Nirvaana is at latitude 0.00000, longitude 0.00000.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2027

Registered
31 Jul 2023
Promised
30 Jun 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5180005221531 Jul 202330 Jun 2027—Shree Dham DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
90 Nirvaana1675

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

75 units registered

1BHK · 42 units2BHK · 32 units3BHK · 1 unit
TypeCarpet areaUnits
1BHK40.24 sq m · 433 sq ft28
1BHK42.74 sq m · 460 sq ft14
2BHK51.76 sq m · 557 sq ft4
2BHK59.09 sq m · 636 sq ft15
2BHK61.32 sq m · 660 sq ft13
3BHK65.89 sq m · 709 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

90 Nirvaana

  • Excavation95%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor40%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises5%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER NORMS0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER NORMS0%
  • Storm Water DrainsAS PER NORMS0%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER NORMS0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAS PER NORMS0%
  • Electrical meter room, sub-station, receiving stationAS PER NORMS0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

29 documents held by Deedo, 32 filings listed on MahaRERA's project page

Encumbrance details (3)

Allotment letter (2)

Other (9)

Show all 61 documentsShow fewer documents

Other (9)

Form B

Title report

Commencement certificate (2)

Registration certificate

Form 2A

Form 1 (5)

Form 2

Layout plan

Building plan (2)

Document library

  • Building Plan Approval / NA Order for plotted developmentbldg no 90.pdf · uploaded 20 May 2023View
  • Building Plan Approval / NA Order for plotted developmentHPSC0289_compressed.pdf · uploaded 27 May 2023View
  • Copy of Layout Approval (in case of layout)ilovepdf_merged (16).pdf · uploaded 27 May 2023View
  • Proforma of Allotment letterALLOTMENT LETTER DRAFT.pdf · uploaded 27 May 2023View
  • a Details of encumbrances concerned to Financeencum.pdf · uploaded 29 May 2023View
  • b Details of encumbrances concerned to Legalencum.pdf · uploaded 29 May 2023View
  • Deviation Report with respect to Allotment letterallot deviation.pdf · uploaded 29 May 2023View
  • Deviation Report with respect to model copy of Agreementafs devition.pdf · uploaded 29 May 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration About Separate Bank Account For Rera Project .pdf · uploaded 10 Jun 2023View
  • Declaration in FORM BAffidavit cum declaration shreedham devepers (1).pdf · uploaded 16 Jun 2023View
  • Copy of the legal title reportTC (3).pdf · uploaded 17 Jun 2023View
  • Proforma of Agreement for saleAgreement for sale (1).pdf · uploaded 28 Jun 2023View
  • Disclosure of Interest in Other Real Estate Organizationsdisclosure of interest.pdf · uploaded 28 Jun 2023View
  • a Details of encumbrances concerned to FinanceENCUM CER.pdf · uploaded 4 Jul 2023View
  • b Details of encumbrances concerned to LegalENCUM CER.pdf · uploaded 4 Jul 2023View
  • Declaration about Commencement CertificateCommencement certificate .pdf · uploaded 4 Jul 2023View
  • CERSAI details1_merged.pdf · uploaded 4 Jul 2023View
  • Commencement Certificates / NA Order for plotted developmentCC 90.pdf · uploaded 27 Jul 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 July-Sept PN90.pdf · uploaded 14 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)DocScanner May 14, 2024 1-22 PM.pdf · uploaded 14 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)DocScanner May 14, 2024 1-21 PM.pdf · uploaded 14 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)DocScanner May 14, 2024 1-18 PM.pdf · uploaded 14 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - PN_90__RV.pdf · uploaded 14 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 (11).pdf · uploaded 14 Feb 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (1).pdf · uploaded 19 Feb 2025View
  • Disclosure of sold/ booked inventorySOLD UPDTAED.pdf · uploaded 19 Feb 2025View

Promoter documents

  • Declaration Form BAffidavit cum declaration shreedham devepers (1).pdf · uploaded 16 Jun 2023View
  • Legal Title reportTC (3).pdf · uploaded 17 Jun 2023View

Technical documents

  • Building Plan Approvalbldg no 90.pdfView
  • Building Plan ApprovalHPSC0289_compressed.pdfView
  • Layout Approvalilovepdf_merged (16).pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER DRAFT.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Ghatkopar, Kurla taluka

Survey, CTS, gat or plot numbers

184 PT

As published on MahaRERA's project page

184 PT

Boundaries

North
R-7 Patra Chawl
South
Building No 92
East
40 Feet Wide Road
West
Building No 91

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRitesh Thakur—
Chartered accountantpiyush bolia and associated—
EngineerAssociated Structural Engineers LLP—

Source: MahaRERA project page. Contact details are not shown.

Data through12 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology