Veena Smart Homes
Certificate SignedBorivali, Mumbai Suburban 400067 |Promoter: V.D. Infratech Private Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- RERA registrations
- 2
- Phases
- 1
- Buildings
- 3
- Unit types
- 2BHK, Shop, 1BHK328 units in all
- Address
- 3/A/1 part, Babrekar Nagar, Charkop, Kandivali westPIN 400067
- Designated bank account
- 159
- Developed in phases
- Yes
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 6 months
P51800029400The latest completion date on record passed 1 year and 4 months ago.
- Registered
- 29 May 2021
- Promised
- 31 Dec 2024
- Revised
- 30 Jun 2025
Completion promised for 31 Dec 2026
P51800032966- Registered
- 2 Feb 2022
- Promised
- 31 Dec 2026
2 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51800029400 | 29 May 2021 | 31 Dec 2024 | 30 Jun 2025 | V.D. Infratech Private Limited | Project page |
| P51800032966 | 2 Feb 2022 | 31 Dec 2026 | 31 Dec 2026 | V.D. Infratech Private Limited | Project page |
3 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Veena Smart Homes Wing C | 39 | 152 |
| Wing A - Building 2 | 24 | 88 |
| Wing B - Building 2 | 24 | 88 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
264 of 328 units booked (80%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51800032966 | Veena Smart Homes Wing C | 2BHK | 53.05 sq m · 571 sq ft | 39 | 14 |
| P51800032966 | Veena Smart Homes Wing C | 2BHK | 54.44 sq m · 586 sq ft | 37 | 13 |
| P51800032966 | Veena Smart Homes Wing C | 2BHK | 54.63 sq m · 588 sq ft | 38 | 25 |
| P51800032966 | Veena Smart Homes Wing C | 2BHK | 54.81 sq m · 590 sq ft | 34 | 34 |
| P51800032966 | Veena Smart Homes Wing C | Shop | 7.62 sq m · 82 sq ft | 1 | 1 |
| P51800032966 | Veena Smart Homes Wing C | Shop | 10.13 sq m · 109 sq ft | 1 | 1 |
| P51800032966 | Veena Smart Homes Wing C | Shop | 11.98 sq m · 129 sq ft | 1 | 1 |
| P51800032966 | Veena Smart Homes Wing C | Shop | 13.98 sq m · 150 sq ft | 1 | 1 |
Show all 22 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51800029400 | Wing A - Building 2 | 1BHK | 35.49 sq m · 382 sq ft | 22 | 21 |
| P51800029400 | Wing A - Building 2 | 1BHK | 35.86 sq m · 386 sq ft | 22 | 22 |
| P51800029400 | Wing A - Building 2 | 2BHK | 46.92 sq m · 505 sq ft | 19 | 19 |
| P51800029400 | Wing A - Building 2 | 2BHK | 55.83 sq m · 601 sq ft | 21 | 21 |
| P51800029400 | Wing A - Building 2 | Shop | 8.36 sq m · 90 sq ft | 1 | 1 |
| P51800029400 | Wing A - Building 2 | Shop | 14.96 sq m · 161 sq ft | 1 | 1 |
| P51800029400 | Wing A - Building 2 | Shop | 17.65 sq m · 190 sq ft | 1 | 1 |
| P51800029400 | Wing A - Building 2 | Shop | 25.64 sq m · 276 sq ft | 1 | 0 |
| P51800029400 | Wing B - Building 2 | 1BHK | 35.86 sq m · 386 sq ft | 65 | 65 |
| P51800029400 | Wing B - Building 2 | 1BHK | 35.95 sq m · 387 sq ft | 19 | 19 |
| P51800029400 | Wing B - Building 2 | Shop | 10.59 sq m · 114 sq ft | 1 | 1 |
| P51800029400 | Wing B - Building 2 | Shop | 11.71 sq m · 126 sq ft | 1 | 1 |
| P51800029400 | Wing B - Building 2 | Shop | 11.98 sq m · 129 sq ft | 1 | 1 |
| P51800029400 | Wing B - Building 2 | Shop | 15.33 sq m · 165 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
3 documents held by Deedo, 272 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
Show all 275 documentsShow fewer documents
Legal
- Declaration Form BP51800029400 · form B (2).pdf · uploaded 19 May 2021Source
- Legal Title reportP51800032966 · 2 Legal Title certificate.pdf · uploaded 6 Jan 2022Source
- OtherP51800032966 · Resolution from Society.pdf · uploaded 19 Jan 2022Source
- OtherP51800032966 · NOC from Planning Authority_compressed.pdf · uploaded 19 Jan 2022Source
- Declaration Form BP51800032966 · FORM-B Affidavit cum Declaration 20-01-2022.pdf · uploaded 20 Jan 2022Source
- Declaration Form BP51800029400 · Affidavit Cum Declaration Rera Extension.pdf · uploaded 21 Dec 2024Source
- Declaration Form BP51800029400 · Extension 6m.pdf · uploaded 13 Jan 2025Source
- Declaration Form BP51800029400 · ACD_SMART.pdf · uploaded 27 Mar 2025Source
Migrated
- 1 PAN CardP51800029400 · PAN.pdf · uploaded 30 Apr 2021Source
- 1 Copy of the legal title reportP51800029400 · Legal Title Report.pdf · uploaded 30 Apr 2021Source
- 1 Details of encumbrancesP51800029400 · form B (2).pdf · uploaded 30 Apr 2021Source
- 1 Copy of Layout Approval (in case of layout)P51800029400 · 4 Layout.pdf · uploaded 30 Apr 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · 8 Form 1 Architects certificate.pdf · uploaded 30 Apr 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · 9 Form 2 Eng Certificate.pdf · uploaded 30 Apr 2021Source
- 1 Proforma of Allotment letterP51800029400 · 14 Proforma.pdf · uploaded 30 Apr 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · CA Certificate s.pdf · uploaded 3 May 2021Source
- 2 Copy of the legal title reportP51800029400 · Self Declaration Legal Title Report.pdf · uploaded 19 May 2021Source
- 2 Details of encumbrancesP51800029400 · Self declaration encumbrances.pdf · uploaded 19 May 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentP51800029400 · Approved Building Plan 4 (1).pdf · uploaded 19 May 2021Source
- 2 Building Plan Approval / NA Order for plotted developmentP51800029400 · Approved Building Plan 6 (1).pdf · uploaded 19 May 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentP51800029400 · CC Sale Building no 2.pdf · uploaded 19 May 2021Source
- 1 Declaration in FORM BP51800029400 · Self Declaration other land promoters.pdf · uploaded 19 May 2021Source
- 2 Declaration in FORM BP51800029400 · form B (2).pdf · uploaded 19 May 2021Source
- 1 Disclosure of sold/ booked inventoryP51800029400 · inventory declaration.pdf · uploaded 20 May 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Architect Certificate 05-07-2021.pdf · uploaded 12 Aug 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Engineer Certificate.pdf · uploaded 12 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P51800029400 · FORM 2A.pdf · uploaded 12 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51800029400 · FORM 2A.pdf · uploaded 12 Aug 2021Source
- 2 Proforma of Allotment letterP51800029400 · AGREEMENT FOR SALE FINAL-SMART HOMES.pdf · uploaded 12 Aug 2021Source
- 3 Proforma of Allotment letterP51800029400 · ALLOTMENT DRAFT - SHOP.pdf · uploaded 13 Aug 2021Source
- 4 Proforma of Allotment letterP51800029400 · SMART HOMES -ALLOTMENT LETTER-Residential.pdf · uploaded 13 Aug 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · CA Certificate.pdf · uploaded 24 Aug 2021Source
- 1 Declaration about Commencement CertificateP51800029400 · FormdreraVSH.pdf · uploaded 4 Oct 2021Source
- 1 PAN CardP51800032966 · 1 PAN.pdf · uploaded 6 Jan 2022Source
- 1 Copy of the legal title reportP51800032966 · 2 Legal Title certificate.pdf · uploaded 6 Jan 2022Source
- 1 Copy of Layout Approval (in case of layout)P51800032966 · 4 Layout.pdf · uploaded 6 Jan 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP51800032966 · Commence Certificate - Sale Bldg_compressed.pdf · uploaded 7 Jan 2022Source
- 1 Declaration about Commencement CertificateP51800032966 · CC Declaration.pdf · uploaded 7 Jan 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800032966 · Engineer Cerificate.pdf · uploaded 7 Jan 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800032966 · CA Certificate for Wing C_compressed.pdf · uploaded 11 Jan 2022Source
- 1 Proforma of Allotment letterP51800032966 · Allotment Letter.pdf · uploaded 11 Jan 2022Source
- 2 Proforma of Allotment letterP51800032966 · Draft Agreement.pdf · uploaded 11 Jan 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP51800032966 · Building Plan 1_compressed (1)_compressed.pdf · uploaded 19 Jan 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentP51800032966 · Building Plan 2_compressed.pdf · uploaded 19 Jan 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentP51800032966 · Building Plan 3_compressed.pdf · uploaded 19 Jan 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentP51800032966 · Building Plan 4_compressed.pdf · uploaded 19 Jan 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentP51800032966 · Building Plan 5_compressed.pdf · uploaded 19 Jan 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentP51800032966 · Building Plan 6_compressed.pdf · uploaded 19 Jan 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentP51800032966 · Building Plan 7_compressed.pdf · uploaded 19 Jan 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentP51800032966 · Building Plan 8_compressed.pdf · uploaded 19 Jan 2022Source
- 9 Building Plan Approval / NA Order for plotted developmentP51800032966 · Building Plan 9_compressed.pdf · uploaded 19 Jan 2022Source
- 10 Building Plan Approval / NA Order for plotted developmentP51800032966 · Building Plan 10_compressed.pdf · uploaded 19 Jan 2022Source
- 11 Building Plan Approval / NA Order for plotted developmentP51800032966 · Building Plan 11_compressed.pdf · uploaded 19 Jan 2022Source
- 12 Building Plan Approval / NA Order for plotted developmentP51800032966 · Building Plan 12_compressed.pdf · uploaded 19 Jan 2022Source
- 13 Building Plan Approval / NA Order for plotted developmentP51800032966 · Building Plan 13_compressed.pdf · uploaded 19 Jan 2022Source
- 1 OtherP51800032966 · Resolution from Society.pdf · uploaded 19 Jan 2022Source
- 2 OtherP51800032966 · NOC from Planning Authority_compressed.pdf · uploaded 19 Jan 2022Source
- 1 Details of encumbrancesP51800032966 · Encumbrance Certificate.pdf · uploaded 20 Jan 2022Source
- 1 Declaration in FORM BP51800032966 · FORM-B Affidavit cum Declaration 20-01-2022.pdf · uploaded 20 Jan 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · Wing- C Architect Certificate (21-12-2021)_compressed.pdf · uploaded 20 Jan 2022Source
- 1 CERSAI detailsP51800032966 · Cersai Undertaking.pdf · uploaded 20 Jan 2022Source
- 2 Declaration about Commencement CertificateP51800029400 · CC Declaration.pdf · uploaded 10 Feb 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Architect Certificate AB wing.pdf · uploaded 10 Feb 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Engineer Certificate AB wing.pdf · uploaded 10 Feb 2022Source
- 1 CERSAI detailsP51800029400 · Cersai Undertaking.pdf · uploaded 10 Feb 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · CA Certificate AB wing.pdf · uploaded 10 Feb 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Work Completion Certificate - Wing AB.pdf · uploaded 29 Jun 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Engineer Certificate - Wing AB.pdf · uploaded 29 Jun 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · CA Certificate - Wing AB compressed.pdf · uploaded 29 Jun 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · Work Completion Certificate - Wing C.pdf · uploaded 29 Jun 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800032966 · Engineer Certificate C Wing.pdf · uploaded 29 Jun 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800032966 · C A Certificate Wing- C_compressed.pdf · uploaded 29 Jun 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Architect Certificate A B Wing.pdf · uploaded 22 Aug 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Architect Certificate A B Wing.pdf · uploaded 22 Aug 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · ENGINEER'S CERTIFICATE A B Wing _compressed (1).pdf · uploaded 22 Aug 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · Certificate Wing C.pdf · uploaded 23 Aug 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800032966 · ENGINEER'S CERTIFICATE C Wing.pdf · uploaded 23 Aug 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800032966 · C A Certificate - Annexure-A Wing C.pdf · uploaded 23 Aug 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Form -1 Architect Certificate Smart Homes Wing A B_sep_22_compressed.pdf · uploaded 1 Dec 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Form- 2 Engineer Certificate A B Wing 31-10-2022.pdf · uploaded 1 Dec 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · Form -3 Thar Co Form-3_CA Certificate - A B Wing compressed.pdf · uploaded 1 Dec 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · Form -3 Thar Co Form-3_CA Certificate - A B Wing compressed.pdf · uploaded 1 Dec 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · Form - 1 Architect Certificate Smart Homes Wing C_compressed.pdf · uploaded 1 Dec 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800032966 · Form - 2 Engineer Certificate C Wing 31-10-2022.pdf · uploaded 1 Dec 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800032966 · Form - 3-FY 22-23 Q-2_C wing-smart homes_compressed.pdf · uploaded 1 Dec 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentP51800032966 · Further CC.pdf · uploaded 13 Jan 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentP51800029400 · Further CC.pdf · uploaded 18 Jan 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Arch Certificate A and B.pdf · uploaded 2 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51800029400 · Wing A and B form 5.pdf · uploaded 2 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51800032966 · Wing C form 5.pdf · uploaded 2 Feb 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Architect Certificate Smart Home A B Wing 31 12 2022.pdf · uploaded 6 Jun 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · Architect Certificate Smart Home C Wing 31 12 2022.pdf · uploaded 6 Jun 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Architect Certificate Smart Home C Wing 04 04 2023.pdf · uploaded 19 Jun 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · Architect Certificate Smart Home C Wing 04 04 2023.pdf · uploaded 19 Jun 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800032966 · Form 2 Engineer Certificate Wing C 31 12 22_11zon.pdf · uploaded 19 Jun 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800032966 · Engineer Certificate Form 2 C Wing 16 05 2023.pdf · uploaded 19 Jun 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800032966 · Form 3 C A Certificate Smart Home C Wing 21 03 2023_11zon.pdf · uploaded 19 Jun 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800032966 · CA Certificate Form-3 C Wing 20 05 2023_11zon.pdf · uploaded 19 Jun 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Form 2 Engineer Certificate A B 31 12 2022 Q3.pdf · uploaded 3 Jul 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Form 2 Engineer Certificate A B 31 12 2022 Q3.pdf · uploaded 3 Jul 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Form 2 Engineer Certificate A B 31 12 2022 Q3.pdf · uploaded 3 Jul 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Engineer Certificate Form 2 A B Wing 16 05 2023 F4.pdf · uploaded 3 Jul 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · Form 3 C A Certificate Smart Home A B Wing 16032023.pdf · uploaded 3 Jul 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · CA Certificate Form 3 A B Wing 20 05 2023 F4 11zon.pdf · uploaded 3 Jul 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · CA Certificate Form 3 A B Wing 20 05 2023 F4 11zon.pdf · uploaded 3 Jul 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Form 1 Work Completion Certificate Smart Home A B Wing 07 07 2023 0001.pdf · uploaded 4 Oct 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Engineer Certificate (form 2) Wing A B 30 08 2023.pdf · uploaded 4 Oct 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · C A Certificate ( Form 3) Wing A B 02 09 2023.pdf · uploaded 4 Oct 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · Form 1 Work Completion Certificate Smart Home D E Wing 07 07 2023.pdf · uploaded 4 Oct 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800032966 · Engineer Certificate (form 2) Wing D E 30 08 2023.pdf · uploaded 4 Oct 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800032966 · Engineer Certificate (form 2) Wing C 30 08 2023.pdf · uploaded 4 Oct 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800032966 · C A Certificate ( Form 3) Wing C 02 09 2023.pdf · uploaded 4 Oct 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Form 1 AB Wing (Smart Home) 25 10 2023.pdf · uploaded 11 Dec 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Form 1 AB Wing (Smart Home) 25 10 2023.pdf · uploaded 11 Dec 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Form 2 Engineer Certificate A B 30 09 2023.pdf · uploaded 11 Dec 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · C A Certificate Smart Home A and B Wing 16 11 2023.pdf · uploaded 11 Dec 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · Form 1 C Wing (Smart Home) 25 10 2023.pdf · uploaded 11 Dec 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800032966 · Form 2 Engineer Certificate Wing C 30 09 2023.pdf · uploaded 11 Dec 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800032966 · Form 3Smart Homes C Wing Form 3 Sept 2023_11zon.pdf · uploaded 11 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51800029400 · VDIPL FORM 5 WING A and B.pdf · uploaded 2 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51800032966 · VDIPL FORM 5 C.pdf · uploaded 2 Mar 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Form 1 A and b.pdf · uploaded 2 Aug 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Engineer Certificate.pdf · uploaded 2 Aug 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · CA Certificate Form 3.pdf · uploaded 2 Aug 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · Form 1 C Wing Smart Home.pdf · uploaded 2 Aug 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800032966 · Engineer Certificate Form 2.pdf · uploaded 2 Aug 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800032966 · CA Certificate Form-3_11zon.pdf · uploaded 2 Aug 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51800032966 · VDIPL FORM 5 C.pdf · uploaded 2 Aug 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · Form 3 A and B wing Q4 VDIPL.pdf · uploaded 8 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Form 1 Certificate Wing A and B Q4.pdf · uploaded 8 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Form 2 Wing A and B Wing Q4.pdf · uploaded 8 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Form 1 Certificate Wing A and B Q4.pdf · uploaded 8 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · Form 3 A and B wing Q4 VDIPL.pdf · uploaded 8 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Form 2 Wing A and B Wing Q4.pdf · uploaded 8 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800032966 · Form 3 C Wing Q4 VDIOL.pdf · uploaded 8 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · Form 1 Certificate Wing C Q4 VDIPL.pdf · uploaded 8 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800032966 · Form 2 Wing C Wing Q4.pdf · uploaded 8 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · Form 1 Certificate Wing C Q4 VDIPL.pdf · uploaded 8 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800032966 · Form 3 C Wing Q4 VDIOL.pdf · uploaded 8 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800032966 · Form 2 Wing C Wing Q4.pdf · uploaded 8 Oct 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Form 1 Certificate Wing A and B Q1FY2425.pdf · uploaded 23 Nov 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · Form 1 Certificate Wing A and B Q2FY2425.pdf · uploaded 23 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · Smart Homes Form-3 A and B Wing Q1FY2425_compressed.pdf · uploaded 23 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Form-2 Smart Home A andB Wing Q1FY2425.pdf · uploaded 23 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Form-2 Smart Home A andB Wing Q1FY2425.pdf · uploaded 23 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · Form 1 Certificate Wing C Q1FY2425.pdf · uploaded 23 Nov 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · Form 1 Certificate Wing C Q2FY2425.pdf · uploaded 23 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800032966 · Smart Homes Form-3 C Wing Q1FY2425_compressed.pdf · uploaded 23 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800032966 · Form-2 Smart Home C Wing Q1FY2425.pdf · uploaded 23 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800032966 · Form-2 Smart Home C Wing Q2FY2425.pdf · uploaded 23 Nov 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · Work Completion Certificate C Wing.pdf · uploaded 25 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · Smart Homes Form-3 A and B Wing Q2FY2425compressed.pdf · uploaded 26 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800032966 · Smart Homes Form-3 C Wing Q2FY2425_compressed.pdf · uploaded 26 Nov 2024Source
- 2 Declaration in FORM BP51800029400 · Affidavit Cum Declaration Rera Extension.pdf · uploaded 21 Dec 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Form-2 Smart Home A AND B Wing Q2.pdf · uploaded 21 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51800029400 · Form 2A.pdf · uploaded 21 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51800029400 · 17122024 - V D Infratech Form 5 - Wing A and B.pdf · uploaded 21 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51800032966 · 17122024 - V D Infratech - Form 5 - Wing C.pdf · uploaded 21 Dec 2024Source
- 1 Disclosure of sold/ booked inventoryP51800029400 · Sold unsold inventory.pdf · uploaded 23 Dec 2024Source
- 1 Declaration in FORM BP51800029400 · Extension 6m.pdf · uploaded 13 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800029400 · WorkComplationCertificateWingABQ32425.pdf · uploaded 20 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51800032966 · WorkComplationCertificateWingCQ32425.pdf · uploaded 20 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51800029400 · Form-3.pdf · uploaded 1 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51800029400 · Form 02 AB Wing Q3.pdf · uploaded 1 Mar 2025Source
- 1 Declaration in FORM BP51800029400 · ACD_SMART.pdf · uploaded 27 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryP51800029400 · Inventory Letter A B wing Smart Home Finalopt.pdf · uploaded 27 Mar 2025Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51800029400 · Sale BLD Part OC 04042025.pdf · uploaded 17 Apr 2025Source
- Form 1P51800032966 · Form 1.pdf · uploaded 17 Jul 2025Source
- Form 2P51800032966 · Form 2 Smart Home DEC C Wing.pdf · uploaded 17 Jul 2025Source
- Form 3P51800032966 · Form 3 Smart Home DEC C Wing.pdf · uploaded 17 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51800032966 · Form 3 Smart Home DEC C Wing.pdf · uploaded 17 Jul 2025Source
- Form 1P51800032966 · Form 1 Architect Certificate C Wing.pdf · uploaded 15 Dec 2025Source
- Form 2P51800032966 · Form 2 Engineer Certificate Wing C.pdf · uploaded 15 Dec 2025Source
- Form 3P51800032966 · Form 3 CA Certificate C Wing.pdf · uploaded 15 Dec 2025Source
- Disclosure of Sold and Booked InventoryP51800032966 · Disclosure of Sold and Booked Inventory C wing.pdf · uploaded 15 Dec 2025Source
- Form 1P51800032966 · Form 1 Architect Certificate Smart Home C Wing.pdf · uploaded 17 Dec 2025Source
- Form 2P51800032966 · Form-2 Engineer Certificate Smart Home C Wing.pdf · uploaded 17 Dec 2025Source
- Form 3P51800032966 · Form-3 CA Certificate Smart Home C Wing.pdf · uploaded 17 Dec 2025Source
- Disclosure of Sold and Booked InventoryP51800032966 · Inventory Details Veena Smart Homes Q1 FY 25-26.pdf · uploaded 17 Dec 2025Source
- Form 5 (FY 2024-2025)P51800032966 · Form 5 C Wing.pdf · uploaded 17 Dec 2025Source
- Form 1P51800032966 · Form 1 Architect Certificate Smart Home C Wing.pdf · uploaded 19 Dec 2025Source
- Form 2P51800032966 · From-2 Engineer Certificate Wing C.pdf · uploaded 19 Dec 2025Source
- Form 3P51800032966 · Form-3 C A Certificate Wing C.pdf · uploaded 19 Dec 2025Source
- Disclosure of Sold and Booked InventoryP51800032966 · Smart Home C Wing Book Inventory.pdf · uploaded 19 Dec 2025Source
- Withdrawal Update Form 1P51800032966 · FORM1 WORK COMPLETION CERTIFICATE 31122025.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1P51800032966 · FORM1 WORK COMPLETION CERTIFICATE 31122025.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2P51800032966 · Form 2 Veena Smart Homes C Wing Q3.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2P51800032966 · Form 2 Veena Smart Homes C Wing Q3.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3P51800032966 · Form 31 December 2025 smart home C wing VDIPL.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3P51800032966 · Form 31 December 2025 smart home C wing VDIPL.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1P51800032966 · Form 1_Q4.pdf · uploaded 16 May 2026Source
- Withdrawal Update Form 2P51800032966 · Form-2_Q4.pdf · uploaded 16 May 2026Source
- Withdrawal Update Form 3P51800032966 · Form-3_Q4.pdf · uploaded 16 May 2026Source
- Form 1P51800029400 · Completion Certificate Wing A B.pdf · uploaded 15 Jul 2026Source
- Form 2P51800029400 · Form 2 Smart Home A B Wing.pdf · uploaded 15 Jul 2026Source
- Form 3P51800029400 · Smart Homes Form 3 A B Wing.pdf · uploaded 15 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51800029400 · Smart Homes Form 3 A B Wing.pdf · uploaded 15 Jul 2026Source
- Form 1P51800029400 · Form 1 Work Complation Certificate Wing A B.pdf · uploaded 15 Jul 2026Source
- Form 2P51800029400 · Form 2 Engineer Certificate Smart Home Wing A B.pdf · uploaded 15 Jul 2026Source
- Form 3P51800029400 · Form 3 C A Certificate Wing A B.pdf · uploaded 15 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51800029400 · Form 3 C A Certificate Wing A B.pdf · uploaded 15 Jul 2026Source
- Form 1P51800029400 · Form 1 Work Completion Certificate A B Wing.pdf · uploaded 15 Jul 2026Source
- Form 2P51800029400 · Form 02 AB Wing Q3.pdf · uploaded 15 Jul 2026Source
- Form 3P51800029400 · Form-3.pdf · uploaded 15 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51800029400 · Form-3.pdf · uploaded 15 Jul 2026Source
- Form 2A (FY 2024-2025)P51800029400 · Form 2A.pdf · uploaded 15 Jul 2026Source
- Form 5 (FY 2024-2025)P51800029400 · Form 5 CA Certificate A B Wing.pdf · uploaded 15 Jul 2026Source
- Form 1P51800029400 · Form 1 Work Completion Certificate A B Wing.pdf · uploaded 16 Jul 2026Source
- Form 2P51800029400 · Form 2 Smart Home A AND B Wing Q2.pdf · uploaded 16 Jul 2026Source
- Form 3P51800029400 · Form 3 Smart Homes A B Wing.pdf · uploaded 16 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51800029400 · Form 3 Smart Homes A B Wing.pdf · uploaded 16 Jul 2026Source
- Form 1P51800029400 · Form 1.pdf · uploaded 20 Jul 2026Source
- Form 2P51800029400 · Form 2.pdf · uploaded 20 Jul 2026Source
- Form 3P51800029400 · Form 3.pdf · uploaded 20 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51800029400 · Disclosure of Sold and Booked Inventory.pdf · uploaded 20 Jul 2026Source
- Form 2A (FY 2025-2026)P51800029400 · Veena Smart Homes AB Form 2A.pdf · uploaded 24 Jul 2026Source
- Form 5 (FY 2025-2026)P51800029400 · Veena Smart Homes AB Form 5.pdf · uploaded 24 Jul 2026Source
- Occupational CertificateP51800029400 · Rehab Building Full OC Smart Homes AB Wing.pdf · uploaded 4 Sep 2026Source
- Occupational CertificateP51800029400 · Sale Building Part OC Smart Homes AB wing.pdf · uploaded 4 Sep 2026Source
- Withdrawal Update Form 1P51800032966 · Form 1 Veena Smart Homes C Wing Q1 30 June 2026.pdf · uploaded 25 Sep 2026Source
- Withdrawal Update Form 1P51800032966 · Form 1 Veena Smart Homes C Wing Q1 30 June 2026.pdf · uploaded 25 Sep 2026Source
- Withdrawal Update Form 2P51800032966 · Form 2 Veena Smart Homes C Wing Date 19th Sept 2026.pdf · uploaded 25 Sep 2026Source
- Withdrawal Update Form 2P51800032966 · Form 2 Veena Smart Homes C Wing Date 19th Sept 2026.pdf · uploaded 25 Sep 2026Source
- Withdrawal Update Form 3P51800032966 · Form-3_Q4.pdf · uploaded 25 Sep 2026Source
- Withdrawal Update Form 3P51800032966 · Form 3 Veena Smart Homes C Wing Q1.pdf · uploaded 25 Sep 2026Source
Technical
- DocumentP51800029400 · 4 Layout.pdf · uploaded 30 Apr 2021Source
- DocumentP51800029400 · Approved Building Plan 4 (1).pdf · uploaded 19 May 2021Source
- DocumentP51800029400 · Approved Building Plan 6 (1).pdf · uploaded 19 May 2021Source
- DocumentP51800032966 · 4 Layout.pdf · uploaded 6 Jan 2022Source
- DocumentP51800032966 · Building Plan 1_compressed (1)_compressed.pdf · uploaded 19 Jan 2022Source
- DocumentP51800032966 · Building Plan 2_compressed.pdf · uploaded 19 Jan 2022Source
- DocumentP51800032966 · Building Plan 3_compressed.pdf · uploaded 19 Jan 2022Source
- DocumentP51800032966 · Building Plan 4_compressed.pdf · uploaded 19 Jan 2022Source
- DocumentP51800032966 · Building Plan 5_compressed.pdf · uploaded 19 Jan 2022Source
- DocumentP51800032966 · Building Plan 6_compressed.pdf · uploaded 19 Jan 2022Source
- DocumentP51800032966 · Building Plan 7_compressed.pdf · uploaded 19 Jan 2022Source
- DocumentP51800032966 · Building Plan 8_compressed.pdf · uploaded 19 Jan 2022Source
- DocumentP51800032966 · Building Plan 9_compressed.pdf · uploaded 19 Jan 2022Source
- DocumentP51800032966 · Building Plan 10_compressed.pdf · uploaded 19 Jan 2022Source
- DocumentP51800032966 · Building Plan 11_compressed.pdf · uploaded 19 Jan 2022Source
- DocumentP51800032966 · Building Plan 12_compressed.pdf · uploaded 19 Jan 2022Source
- DocumentP51800032966 · Building Plan 13_compressed.pdf · uploaded 19 Jan 2022Source
Technical (Architect)
- DocumentP51800029400 · Form 1 A and b.pdf · uploaded 2 Aug 2024Source
- DocumentP51800029400 · Form 1 Certificate Wing A and B Q4.pdf · uploaded 8 Oct 2024Source
- DocumentP51800029400 · Form 1 Certificate Wing A and B Q4.pdf · uploaded 8 Oct 2024Source
- DocumentP51800032966 · Form 1 Certificate Wing C Q4 VDIPL.pdf · uploaded 8 Oct 2024Source
- DocumentP51800032966 · Form 1 Certificate Wing C Q4 VDIPL.pdf · uploaded 8 Oct 2024Source
- DocumentP51800029400 · Form 1 Certificate Wing A and B Q1FY2425.pdf · uploaded 23 Nov 2024Source
- DocumentP51800029400 · Form 1 Certificate Wing A and B Q2FY2425.pdf · uploaded 23 Nov 2024Source
- DocumentP51800032966 · Form 1 Certificate Wing C Q1FY2425.pdf · uploaded 23 Nov 2024Source
- DocumentP51800032966 · Form 1 Certificate Wing C Q2FY2425.pdf · uploaded 23 Nov 2024Source
- DocumentP51800032966 · Work Completion Certificate C Wing.pdf · uploaded 25 Nov 2024Source
- DocumentP51800029400 · WorkComplationCertificateWingABQ32425.pdf · uploaded 20 Feb 2025Source
- DocumentP51800032966 · WorkComplationCertificateWingCQ32425.pdf · uploaded 20 Feb 2025Source
- DocumentP51800032966 · Form 1 Veena Smart Homes C Wing Q1 30 June 2026.pdf · uploaded 23 Sep 2026Source
Technical (Engineer)
- DocumentP51800029400 · Engineer Certificate.pdf · uploaded 2 Aug 2024Source
- DocumentP51800029400 · Form 2 Wing A and B Wing Q4.pdf · uploaded 8 Oct 2024Source
- DocumentP51800029400 · Form 2 Wing A and B Wing Q4.pdf · uploaded 8 Oct 2024Source
- DocumentP51800032966 · Form 2 Wing C Wing Q4.pdf · uploaded 8 Oct 2024Source
- DocumentP51800032966 · Form 2 Wing C Wing Q4.pdf · uploaded 8 Oct 2024Source
- DocumentP51800029400 · Form-2 Smart Home A andB Wing Q1FY2425.pdf · uploaded 23 Nov 2024Source
- DocumentP51800029400 · Form-2 Smart Home A andB Wing Q1FY2425.pdf · uploaded 23 Nov 2024Source
- DocumentP51800032966 · Form-2 Smart Home C Wing Q1FY2425.pdf · uploaded 23 Nov 2024Source
- DocumentP51800032966 · Form-2 Smart Home C Wing Q2FY2425.pdf · uploaded 23 Nov 2024Source
- DocumentP51800029400 · Form-2 Smart Home A AND B Wing Q2.pdf · uploaded 21 Dec 2024Source
- DocumentP51800029400 · Form 02 AB Wing Q3.pdf · uploaded 1 Mar 2025Source
- DocumentP51800032966 · Form 2 Veena Smart Homes C Wing Date 19th Sept 2026.pdf · uploaded 23 Sep 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Borivali, Borivali taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Babrekar Road
- South
- SRA Building
- East
- SRA Building
- West
- D P Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Jitendra B Patel | — | P51800032966 |
| Architect | Jitendra B Patel | — | P51800029400 |
| Chartered accountant | Jignesh Goradia | — | P51800029400 |
| Chartered accountant | Jignesh Goradia | — | P51800032966 |
| Chartered accountant | Thar & Co | — | P51800029400 |
| Chartered accountant | Thar & Co. | — | P51800029400 |
| Chartered accountant | Thar & Co. | — | P51800032966 |
| Engineer | Rajeev Ranjan | — | P51800032966 |
Show all 15 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Engineer | Rajeev Ranjan | — | P51800029400 |
| Registered real estate agent | Manthan Lalwani | — | P51800029400 |
| Registered real estate agent | Manthan Lalwani | — | P51800032966 |
| Registered real estate agent | Parag Jitendra Mehta | — | P51800029400 |
| Registered real estate agent | Parag Jitendra Mehta | — | P51800032966 |
| Registered real estate agent | Ronak Rajesh Punjabi | — | P51800032966 |
| Registered real estate agent | Ronak Rajesh Punjabi | — | P51800029400 |
Source: MahaRERA project page. Contact details are not shown.