Certificate SignedBorivali, Mumbai Suburban 400097 |Promoter: Royal Realtors
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- Flat n 1, Flat n 10, Flat n 11, Flat n 17, Flat n 18, Flat n 21, Flat n 22, Flat n 6, Flat n 8, Flat no 16, Flat no 17, Flat no 9, Shop type 20, Shop type 26, Shop type 35, Shop type 4, Shop type 48, Shop type 49, Shop type 52, Shop type 64, Comm office 2nd flr, Daigonstic center, Departmental store f, Departmental store g, Intermediate basemen, Office no 1, Office no 11, Office no 2, Office no 3, Office no 4, Office no 5, Office no 6, Office no 7, Office no 8, Office no 9, Shop no 1, Shop no 10, Shop no 11, Shop no 12, Shop no 13, Shop no 14, Shop no 15, Shop no 16, Shop no 17, Shop no 18, Shop no 2, Shop no 3, Shop no 4, Shop no 5, Shop no 6, Shop no 7, Shop no 8, Shop no 9, Type1, Type10, Type11, Type12, Type13, Type14, Type15, Type16, Type17, Type18, Type2, Type3, Type4, Type5, Type6, Type7, Type8, Type9681 units in all
- Address
- 712 713 714 715 And Other As Per Loi, Santoshi Mata Temple Road, Vaishetpada Kurar Village Malad EastPIN 400097
- Designated bank account
- 76
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 8 Feb 2019
- Promised
- 30 Dec 2026
- Revised
- 30 Apr 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51800019529 | 8 Feb 2019 | 30 Dec 2026 | 30 Apr 2027 | Royal Realtors | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Royal Parv | 28 | 21 |
| Royal Pristo | 25 | 660 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
490 of 681 units booked (72%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Royal Parv | Flat n 1 | 38.09 sq m · 410 sq ft | 1 | 1 |
| Royal Parv | Flat n 10 | 32.84 sq m · 353 sq ft | 1 | 0 |
| Royal Parv | Flat n 11 | 29.63 sq m · 319 sq ft | 1 | 1 |
| Royal Parv | Flat n 17 | 42.34 sq m · 456 sq ft | 1 | 0 |
| Royal Parv | Flat n 18 | 36.49 sq m · 393 sq ft | 1 | 1 |
| Royal Parv | Flat n 21 | 30.35 sq m · 327 sq ft | 1 | 0 |
| Royal Parv | Flat n 22 | 39.74 sq m · 428 sq ft | 1 | 1 |
| Royal Parv | Flat n 6 | 45.25 sq m · 487 sq ft | 1 | 1 |
Show all 72 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Royal Parv | Flat n 8 | 40.76 sq m · 439 sq ft | 1 | 0 |
| Royal Parv | Flat no 16 | 24.29 sq m · 261 sq ft | 1 | 1 |
| Royal Parv | Flat no 17 | 21.7 sq m · 234 sq ft | 1 | 1 |
| Royal Parv | Flat no 9 | 37.41 sq m · 403 sq ft | 1 | 0 |
| Royal Parv | Shop type 20 | 10.62 sq m · 114 sq ft | 1 | 0 |
| Royal Parv | Shop type 26 | 22.25 sq m · 239 sq ft | 1 | 0 |
| Royal Parv | Shop type 35 | 11.79 sq m · 127 sq ft | 1 | 0 |
| Royal Parv | Shop type 4 | 4.48 sq m · 48 sq ft | 1 | 0 |
| Royal Parv | Shop type 4 | 6.5 sq m · 70 sq ft | 1 | 0 |
| Royal Parv | Shop type 48 | 14.02 sq m · 151 sq ft | 1 | 0 |
| Royal Parv | Shop type 49 | 52.97 sq m · 570 sq ft | 1 | 0 |
| Royal Parv | Shop type 52 | 12.64 sq m · 136 sq ft | 1 | 0 |
| Royal Parv | Shop type 64 | 11.63 sq m · 125 sq ft | 1 | 0 |
| Royal Pristo | Comm office 2nd flr | 445.56 sq m · 4,796 sq ft | 1 | 1 |
| Royal Pristo | Daigonstic center | 61.46 sq m · 662 sq ft | 1 | 0 |
| Royal Pristo | Departmental store f | 407.7 sq m · 4,388 sq ft | 1 | 1 |
| Royal Pristo | Departmental store g | 299.66 sq m · 3,226 sq ft | 1 | 0 |
| Royal Pristo | Intermediate basemen | 434.95 sq m · 4,682 sq ft | 1 | 0 |
| Royal Pristo | Office no 1 | 30.33 sq m · 326 sq ft | 1 | 0 |
| Royal Pristo | Office no 11 | 85.18 sq m · 917 sq ft | 1 | 0 |
| Royal Pristo | Office no 2 | 23 sq m · 248 sq ft | 1 | 0 |
| Royal Pristo | Office no 3 | 20.77 sq m · 224 sq ft | 1 | 1 |
| Royal Pristo | Office no 4 | 23.18 sq m · 250 sq ft | 1 | 1 |
| Royal Pristo | Office no 5 | 20.59 sq m · 222 sq ft | 1 | 0 |
| Royal Pristo | Office no 6 | 23.46 sq m · 253 sq ft | 1 | 0 |
| Royal Pristo | Office no 7 | 21.9 sq m · 236 sq ft | 1 | 0 |
| Royal Pristo | Office no 8 | 21.9 sq m · 236 sq ft | 1 | 0 |
| Royal Pristo | Office no 9 | 20.78 sq m · 224 sq ft | 1 | 0 |
| Royal Pristo | Shop no 1 | 39.42 sq m · 424 sq ft | 1 | 1 |
| Royal Pristo | Shop no 10 | 27.76 sq m · 299 sq ft | 1 | 1 |
| Royal Pristo | Shop no 11 | 25.92 sq m · 279 sq ft | 1 | 1 |
| Royal Pristo | Shop no 12 | 25.92 sq m · 279 sq ft | 1 | 1 |
| Royal Pristo | Shop no 13 | 24.58 sq m · 265 sq ft | 1 | 1 |
| Royal Pristo | Shop no 14 | 23.13 sq m · 249 sq ft | 1 | 0 |
| Royal Pristo | Shop no 15 | 26.15 sq m · 281 sq ft | 1 | 0 |
| Royal Pristo | Shop no 16 | 26.53 sq m · 286 sq ft | 1 | 0 |
| Royal Pristo | Shop no 17 | 29.43 sq m · 317 sq ft | 1 | 1 |
| Royal Pristo | Shop no 18 | 17.1 sq m · 184 sq ft | 1 | 0 |
| Royal Pristo | Shop no 2 | 31.47 sq m · 339 sq ft | 1 | 1 |
| Royal Pristo | Shop no 3 | 25.9 sq m · 279 sq ft | 1 | 1 |
| Royal Pristo | Shop no 4 | 27.52 sq m · 296 sq ft | 1 | 1 |
| Royal Pristo | Shop no 5 | 28.45 sq m · 306 sq ft | 1 | 1 |
| Royal Pristo | Shop no 6 | 27.17 sq m · 292 sq ft | 1 | 1 |
| Royal Pristo | Shop no 7 | 21.57 sq m · 232 sq ft | 1 | 1 |
| Royal Pristo | Shop no 8 | 24.36 sq m · 262 sq ft | 1 | 1 |
| Royal Pristo | Shop no 9 | 24.36 sq m · 262 sq ft | 1 | 1 |
| Royal Pristo | Type1 | 59.99 sq m · 646 sq ft | 45 | 31 |
| Royal Pristo | Type10 | 46.22 sq m · 498 sq ft | 10 | 9 |
| Royal Pristo | Type11 | 45.79 sq m · 493 sq ft | 10 | 5 |
| Royal Pristo | Type12 | 44.27 sq m · 477 sq ft | 5 | 1 |
| Royal Pristo | Type13 | 62.54 sq m · 673 sq ft | 5 | 5 |
| Royal Pristo | Type14 | 30 sq m · 323 sq ft | 384 | 305 |
| Royal Pristo | Type15 | 36.24 sq m · 390 sq ft | 1 | 0 |
| Royal Pristo | Type16 | 37.36 sq m · 402 sq ft | 1 | 0 |
| Royal Pristo | Type17 | 44.44 sq m · 478 sq ft | 5 | 4 |
| Royal Pristo | Type18 | 41.12 sq m · 443 sq ft | 1 | 1 |
| Royal Pristo | Type2 | 59.64 sq m · 642 sq ft | 30 | 18 |
| Royal Pristo | Type3 | 42.29 sq m · 455 sq ft | 30 | 24 |
| Royal Pristo | Type4 | 41.96 sq m · 452 sq ft | 30 | 22 |
| Royal Pristo | Type5 | 40.61 sq m · 437 sq ft | 15 | 8 |
| Royal Pristo | Type6 | 40.44 sq m · 435 sq ft | 15 | 9 |
| Royal Pristo | Type7 | 58.8 sq m · 633 sq ft | 15 | 5 |
| Royal Pristo | Type8 | 63.19 sq m · 680 sq ft | 15 | 8 |
| Royal Pristo | Type9 | 63.26 sq m · 681 sq ft | 10 | 10 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 100 filings listed on MahaRERA's project page
Legal
- Legal Title reportTLR.pdf · uploaded 21 Jan 2019Source
- Declaration Form BForm B Redue Size 1.pdf · uploaded 21 Jan 2019Source
- OtherRoyal Pristo Block Plan-Model.pdf · uploaded 29 Jan 2019Source
- Other1171 OF 2019-High Court order.pdf · uploaded 23 Jul 2022Source
- OtherWP 1460 OF 2019 High court order.pdf · uploaded 23 Jul 2022Source
Show all 101 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)Layout Plan Reducd Size.pdf · uploaded 21 Jan 2019Source
- 1 Building Plan Approval (IOD)Combine IOD Letter.pdf · uploaded 21 Jan 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCombine CC.pdf · uploaded 21 Jan 2019Source
- 1 Declaration in FORM BForm B Redue Size 1.pdf · uploaded 21 Jan 2019Source
- 1 Certificates of CA (Form 3)Royal Pristo CA certificate.pdf · uploaded 28 Jan 2019Source
- 1 Proforma of Allotment letterLETTER.pdf · uploaded 29 Jan 2019Source
- 1 OtherRoyal Pristo Block Plan-Model.pdf · uploaded 29 Jan 2019Source
- 2 Proforma of Allotment letterAllotmentp0.pdf · uploaded 8 Feb 2019Source
- 3 Proforma of Allotment letterAFS.pdf · uploaded 29 Mar 2019Source
- 1 Form 2AEngineer RERA Certificate_compressed.pdf · uploaded 13 Jun 2019Source
- 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 10 Oct 2019Source
- 4 Proforma of Allotment letterAFS (RP) (STD).pdf · uploaded 22 Oct 2019Source
- 5 Proforma of Allotment letterafs.pdf · uploaded 26 Oct 2019Source
- 2 Details of encumbrancesSelf Declaration with Regards to Encumbrances.pdf · uploaded 7 Feb 2020Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Royal Pristo5.pdf · uploaded 7 Dec 2020Source
- 2 Building Plan Approval (IOD)iod rp.pdf · uploaded 19 Feb 2021Source
- 3 Commencement Certificates / NA Order for plotted developmentCC rp.pdf · uploaded 19 Feb 2021Source
- 4 Commencement Certificates / NA Order for plotted developmentCC 21.pdf · uploaded 13 Aug 2021Source
- 5 Commencement Certificates / NA Order for plotted developmentcc.pdf · uploaded 29 Oct 2021Source
- 3 Details of encumbrancesletters.pdf · uploaded 15 Nov 2021Source
- 6 Proforma of Allotment letterafs final.pdf · uploaded 15 Nov 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (Architect Certificate) upto March 2022.pdf · uploaded 11 Jun 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (Engineer Certificate) upto March 2022_compressed (1).pdf · uploaded 11 Jun 2022Source
- 2 Certificates of CA (Form 3)Form 3 (CA Certificate) upto March 2022_compressed (1).pdf · uploaded 11 Jun 2022Source
- 2 Other1171 OF 2019-High Court order.pdf · uploaded 23 Jul 2022Source
- 3 OtherWP 1460 OF 2019 High court order.pdf · uploaded 23 Jul 2022Source
- 4 Details of encumbrancesEnc RR.pdf · uploaded 15 Feb 2023Source
- 1 Proforma of Agreement for saleAFS- 2023 -FLAT.pdf · uploaded 18 Mar 2023Source
- 7 Proforma of Allotment letterALLOTMENT LETTER - 2023.pdf · uploaded 18 Mar 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - June 2022.pdf · uploaded 18 Jul 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Sept 22.pdf · uploaded 18 Jul 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Sept 22.pdf · uploaded 18 Jul 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Dec 22.pdf · uploaded 18 Jul 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate March 23.pdf · uploaded 18 Jul 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - June 2022.pdf · uploaded 18 Jul 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Sept 2022.pdf · uploaded 18 Jul 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Dec 2022.pdf · uploaded 18 Jul 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate March 23.pdf · uploaded 18 Jul 2023Source
- 3 Certificates of CA (Form 3)Form 3 30062022.pdf · uploaded 18 Jul 2023Source
- 4 Certificates of CA (Form 3)Form 3 30092022.pdf · uploaded 18 Jul 2023Source
- 5 Certificates of CA (Form 3)Form 3 31122022.pdf · uploaded 18 Jul 2023Source
- 6 Certificates of CA (Form 3)Form 3 31032023.pdf · uploaded 18 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Pristo Form 5 FY 20-21.pdf · uploaded 18 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Pristo Form 5 FY 21-22.pdf · uploaded 18 Jul 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate Q2 Pristo.pdf · uploaded 19 Jan 2024Source
- 6 Commencement Certificates / NA Order for plotted developmentRPCC.pdf · uploaded 17 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Pristo.pdf · uploaded 21 Mar 2024Source
- 1 Disclosure of sold/ booked inventoryRoyal Pristo Q1_compressed.pdf · uploaded 3 Apr 2024Source
- 2 Disclosure of sold/ booked inventoryRoyal Pristo Q2_compressed.pdf · uploaded 3 Apr 2024Source
- 3 Disclosure of sold/ booked inventoryRoyal Pristo Q3_compressed.pdf · uploaded 3 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q1 Pristo.pdf · uploaded 5 Apr 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q2 Pristo.pdf · uploaded 5 Apr 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate RR Jan 2024.pdf · uploaded 22 Apr 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate RR Apr 2024.pdf · uploaded 22 Apr 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate RR Jan 2024.pdf · uploaded 22 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)QAC RPristo RR 22-23_0001 final.pdf · uploaded 3 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)QAC RPristo RR 22-23_0001 final.pdf · uploaded 3 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)QAC RPristo RR 23-24_0001final.pdf · uploaded 3 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q2.pdf · uploaded 13 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q3.pdf · uploaded 13 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q1.pdf · uploaded 13 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate Q1 Pristo.pdf · uploaded 14 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate Q4 Pristo (Revised Cost).pdf · uploaded 14 Feb 2025Source
- 5 Certificates of CA (Form 3)Form 3 Pristo Dec 2024 upload.pdf · uploaded 21 Feb 2025Source
- 4 Certificates of CA (Form 3)Form 3 Pristo Sept 2024 upload.pdf · uploaded 21 Feb 2025Source
- 3 Certificates of CA (Form 3)Form 3 Pristo June 2024.pdf · uploaded 21 Feb 2025Source
- 2 Certificates of CA (Form 3)Form 3 Pristo Mar 2024_upload.pdf · uploaded 21 Feb 2025Source
- 1 Certificates of CA (Form 3)Form 3 Pristo June 2023_upload.pdf · uploaded 21 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Pristo FY 24-25 Q1.pdf · uploaded 21 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Pristo FY 24-25 Q2.pdf · uploaded 21 Feb 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Pristo FY 24-25 Q3.pdf · uploaded 21 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 signed.pdf · uploaded 22 Feb 2025Source
- 7 Certificates of CA (Form 3)Pristo_Form 3 Dec 2023_upload.pdf · uploaded 24 Feb 2025Source
- 6 Certificates of CA (Form 3)Pristo Form 3_Sept 2023_upload.pdf · uploaded 24 Feb 2025Source
- 1 Disclosure of sold/ booked inventorySodl Unsold_Declaration_ Dec 2024 Pristo_11zon.pdf · uploaded 27 Feb 2025Source
- 2 Disclosure of sold/ booked inventoryMar 24.pdf · uploaded 4 Mar 2025Source
- 3 Disclosure of sold/ booked inventoryJune 24.pdf · uploaded 4 Mar 2025Source
- 4 Disclosure of sold/ booked inventorySep 24.pdf · uploaded 4 Mar 2025Source
- Form 1Architect Certificate Form 1 Pristo, Parv.pdf · uploaded 4 Jun 2025Source
- Form 2A (FY 2024-2025)Royal Realtors Form 2A march 2025.pdf · uploaded 4 Jun 2025Source
Technical
Technical (Architect)
Technical (Engineer)
- DocumentEngineers Certificate RR Jan 2024.pdf · uploaded 22 Apr 2024Source
- DocumentEngg Certificate Q1 Pristo.pdf · uploaded 14 Feb 2025Source
- DocumentEngg Certificate Q4 Pristo (Revised Cost).pdf · uploaded 14 Feb 2025Source
- DocumentForm 2 Pristo FY 24-25 Q1.pdf · uploaded 21 Feb 2025Source
- DocumentForm 2 Pristo FY 24-25 Q2.pdf · uploaded 21 Feb 2025Source
- DocumentForm 2 Pristo FY 24-25 Q3.pdf · uploaded 21 Feb 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Borivali, Borivali taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 13 4 Mt Wide Proposed Dp Road
- South
- Existing Bldg
- East
- Existing Bldg
- West
- 18 3 Mt Wide Dp Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Skytech Consultants | — |
| Chartered accountant | J D Shah & Associates | — |
| Engineer | Aesthetic Engineers | — |
| Engineer | Mitesh Gada | — |
| Engineer | Sanghavi And Associates And Consultants Pvt Ltd | — |
| Engineer | Shubham Suhas Sawant | — |
| Other | Satpanth Assocaites | — |
Source: MahaRERA project page. Contact details are not shown.