Skip to content

Vicino A1a2

Certificate Signed

Andheri, Mumbai Suburban 400093 |Promoter: Mahindra Lifespace Developers limited

Residential / Group HousingRERAP51800022126
28 Aug 2019Registered with MahaRERA
30 Mar 2025Promised completion
1Building
70Units registered70 booked (100%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK70 units in all
Address
243B/1, 243B/2, 247/A, 247/B, Suren Road, AndheriPIN 400093
Designated bank account
109
Developed in phases
No

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2025

The latest completion date on record passed 1 year and 7 months ago.

Registered
28 Aug 2019
Promised
30 Mar 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5180002212628 Aug 201930 Mar 202530 Mar 2025Mahindra Lifespace Developers limitedProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Vicino A1a21770

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

70 of 70 units booked (100%), as the promoter reported to MahaRERA

1BHK · 28 units2BHK · 42 units
TypeCarpet areaUnitsBooked
1BHK40.51 sq m · 436 sq ft1414
1BHK43.39 sq m · 467 sq ft1414
2BHK62.89 sq m · 677 sq ft1414
2BHK66.7 sq m · 718 sq ft1414
2BHK66.89 sq m · 720 sq ft1414

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 104 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardMLDL PAN.pdf · uploaded 17 Aug 2019Source

Legal

  • Legal Title reportLegal Title Report.pdf · uploaded 17 Aug 2019Source
  • Declaration Form BDeclaration Supported by Affidavit1.pdf · uploaded 17 Aug 2019Source

Migrated

  • 1 PAN CardMLDL PAN.pdf · uploaded 17 Aug 2019Source
  • 1 Copy of the legal title reportLegal Title Report.pdf · uploaded 17 Aug 2019Source
  • 1 Details of encumbrancesEncumbrabce Details.pdf · uploaded 17 Aug 2019Source
  • 1 Copy of Layout Approval (in case of layout)Layout approval Letter.pdf · uploaded 17 Aug 2019Source
Show all 105 documentsShow fewer documents

Migrated

  • 2 Copy of Layout Approval (in case of layout)Approved Layout plan.pdf · uploaded 17 Aug 2019Source
  • 1 Building Plan Approval / NA Order for plotted developmentBldg 1 IOD.pdf · uploaded 17 Aug 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentBldg 1 Plinth CC dt 28102016.pdf · uploaded 17 Aug 2019Source
  • 1 Declaration in FORM BDeclaration Supported by Affidavit1.pdf · uploaded 17 Aug 2019Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)20190814 RERA CERTIFICATE.pdf · uploaded 17 Aug 2019Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vicino Engineer's Certificate1.pdf · uploaded 17 Aug 2019Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vicino Certificate_A1-A2.pdf · uploaded 17 Aug 2019Source
  • 1 Proforma of Allotment letterAllotment Letter - Building - 1.pdf · uploaded 17 Aug 2019Source
  • 2 Proforma of Allotment letterAFS -160819 - Building - 1.pdf · uploaded 17 Aug 2019Source
  • 2 Commencement Certificates / NA Order for plotted developmentMLDL ltr 260819.pdf · uploaded 26 Aug 2019Source
  • 3 Commencement Certificates / NA Order for plotted developmentVicino Bldg No 1 CC revalidation Receipt.pdf · uploaded 26 Aug 2019Source
  • 3 Copy of Layout Approval (in case of layout)Amended approved plans (RERA).pdf · uploaded 30 Sep 2019Source
  • 2 Building Plan Approval / NA Order for plotted developmentIssue Letter 300919.pdf · uploaded 30 Sep 2019Source
  • 4 Copy of Layout Approval (in case of layout)Vicino bldg1 Amended approval plansdt01012020 (2).pdf · uploaded 3 Jan 2020Source
  • 3 Building Plan Approval / NA Order for plotted developmentVicino bldg 1 Amended approval Issue Letter dt 01012020.pdf · uploaded 3 Jan 2020Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate-Q3-VICINO.pdf · uploaded 21 Jan 2020Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate-Q3-VICINO.pdf · uploaded 21 Jan 2020Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate-Q3-VICINOA1A2.pdf · uploaded 23 Jan 2020Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Assurance Certificate-Q3-VICINO1.pdf · uploaded 29 Feb 2020Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q4 Fy19-20.pdf · uploaded 11 Jun 2020Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Q4 FY19-20.pdf · uploaded 11 Jun 2020Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate-FY20-21-Q1.pdf · uploaded 19 Jul 2020Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate -FY20-21-Q1.pdf · uploaded 19 Jul 2020Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Certificate-FY19-20-Q4.pdf · uploaded 19 Jul 2020Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Certificate-FY20-21-Q1.pdf · uploaded 19 Jul 2020Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Q4-FY19-20-A1A2-PDF.pdf · uploaded 26 Aug 2020Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate-FY20-21-Q1-A1A2-PDF.pdf · uploaded 26 Aug 2020Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate-FY20-21-Q2.pdf · uploaded 23 Oct 2020Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate-FY20-21-Q2.pdf · uploaded 23 Oct 2020Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Assurance Certificate-FY20-21-Q2.pdf · uploaded 23 Oct 2020Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate A1A2-FY20-21-Q2.pdf · uploaded 23 Oct 2020Source
  • 3 Proforma of Allotment letterVicino A1A2_Agreement draft.pdf · uploaded 26 Oct 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM5-VICINO A1A2.pdf · uploaded 8 Dec 2020Source
  • 5 Copy of Layout Approval (in case of layout)Vicino Bldg1 Amended approval letter dt13012021.pdf · uploaded 14 Jan 2021Source
  • 6 Copy of Layout Approval (in case of layout)Vicino Bldg1 Amended approval plans dt13012021Compressed.pdf · uploaded 14 Jan 2021Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)VICINO Architect Certificate Dec 2020.pdf · uploaded 27 Jan 2021Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vicino Engineers Certificate Dec 2020.pdf · uploaded 27 Jan 2021Source
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Assurance Certificate Dec 2020.pdf · uploaded 27 Jan 2021Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vicino CA Certificate A1A2 Dec 20.pdf · uploaded 27 Jan 2021Source
  • 4 Proforma of Allotment letterVICINO A1A2 AFS 23022021.pdf · uploaded 25 Feb 2021Source
  • 5 Proforma of Allotment letterVICINO A1A2 Allotment Letter 23022021.pdf · uploaded 25 Feb 2021Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q4 FY21.pdf · uploaded 4 Jun 2021Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Q4 FY21.pdf · uploaded 4 Jun 2021Source
  • 6 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Assurance Certificate Q4 FY21.pdf · uploaded 4 Jun 2021Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)VICINO A1A2 CA Certificate Q4 FY21.pdf · uploaded 4 Jun 2021Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Q1 FY22.pdf · uploaded 12 Aug 2021Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Q1 FY22.pdf · uploaded 13 Aug 2021Source
  • 7 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Assurance Certificate Q1 FY22.pdf · uploaded 13 Aug 2021Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vicino A1A2 Jun'21 CA certificate.pdf · uploaded 9 Oct 2021Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vicino A3A4 Jun'21 CA certificate.pdf · uploaded 9 Oct 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Vicino A1A2 Jun'21 CA certificate.pdf · uploaded 9 Oct 2021Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Signed Form 5 and SOA - Vicino A1A2.pdf · uploaded 9 Oct 2021Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Signed Form 5 and SOA - Vicino A3A4.pdf · uploaded 9 Oct 2021Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vicino Architect Certificate Oct '2021.pdf · uploaded 27 Oct 2021Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vicino Engineer - Sept 21.pdf · uploaded 27 Oct 2021Source
  • 4 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Signed Form 5 and SOA - Vicino A1A2_compressed.pdf · uploaded 18 Feb 2022Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)MLDL VICINO ENGG CERTIFICATE Q3_DEC21- for TOWER A1A2.pdf · uploaded 21 Feb 2022Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Tower_A1A2_Certificate.pdf · uploaded 17 Mar 2022Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)MLDL VICINO ENGG CERTIFICATE Q3_DEC21- for TOWER A1A2.pdf · uploaded 17 Mar 2022Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vicino A1A2 final_compressed.pdf · uploaded 17 Mar 2022Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)A1A2_Rera Certificate_27042022-signed.pdf · uploaded 6 May 2022Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)MLDL VICINO TOWER A1A2 CERTIFICATE Q4_March 22_compressed.pdf · uploaded 6 May 2022Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)MLDL VICINO TOWER A1A2 CERTIFICATE Q4_March 22_compressed.pdf · uploaded 6 May 2022Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)A1A2 March'22 CA certificate_Compressed.pdf · uploaded 6 May 2022Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)A1A2_Rera Certificate_15072022-signed.pdf · uploaded 18 Jul 2022Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)MLDL_VICINO_TOWER A3A4_ Q1_JUNE22-Final-signed.pdf · uploaded 18 Jul 2022Source
  • 8 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)MLDL_VICINO_TOWER A1A1_ Q1_JUNE22-Final-signed.pdf · uploaded 18 Jul 2022Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vicino A1A2 Jun22 updated-signed.pdf · uploaded 18 Jul 2022Source
  • 9 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Certificate RERA Q1-signed.pdf · uploaded 19 Jul 2022Source
  • 5 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)VicinoA1A2 signed.pdf · uploaded 30 Sep 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)VicinoA1A2 signed.pdf · uploaded 30 Sep 2022Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)VICINO A1A2 Rev Architect Certificate for RERA Reg signed.pdf · uploaded 17 Oct 2022Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)MLDL_VICINO_TOWER A1A2_ Q2_SEPT22-Final-signed.pdf · uploaded 17 Oct 2022Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)VICINO A1A2_SEP 22-signed_compressed.pdf · uploaded 17 Oct 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality certificate A1A2, A3A4 and A5A6.pdf · uploaded 20 Oct 2022Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)VICINO A1A2 Rev Architect Certificate for RERA.pdf · uploaded 16 Jan 2023Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)MLDL_VICINO_TOWER A1A2_ Q2_DEC22-Final_signed.pdf · uploaded 16 Jan 2023Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vicino A1A2 Dec'22_signed.pdf · uploaded 16 Jan 2023Source
  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vicino_A1A2_ Completion Certificate_signed.pdf · uploaded 17 Apr 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Assurance certificate RERA FY 22-23_signed.pdf · uploaded 19 Apr 2023Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPart OC A1A2.pdf · uploaded 19 Apr 2023Source
  • 2 Architect’s Certificate on Completion of Project (Form 4)20230119_Annexure_E-form-04_signed.pdf · uploaded 19 Apr 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Vicino A1A2 v1.pdf · uploaded 28 Sep 2023Source
  • 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentA1A2 full OC.pdf · uploaded 6 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Vicino A1A2- Form 5-FY24.pdf · uploaded 8 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Vicino A1A2- Form 5-FY24.pdf · uploaded 8 Oct 2024Source
  • 1 Other – TechnicalVICINO-A1A2-FORM4.pdf · uploaded 13 Dec 2024Source

Technical

  • DocumentBldg 1 IOD.pdf · uploaded 17 Aug 2019Source
  • DocumentLayout approval Letter.pdf · uploaded 17 Aug 2019Source
  • DocumentApproved Layout plan.pdf · uploaded 17 Aug 2019Source
  • DocumentAmended approved plans (RERA).pdf · uploaded 30 Sep 2019Source
  • DocumentIssue Letter 300919.pdf · uploaded 30 Sep 2019Source
  • DocumentVicino bldg1 Amended approval plansdt01012020 (2).pdf · uploaded 3 Jan 2020Source
  • DocumentVicino bldg 1 Amended approval Issue Letter dt 01012020.pdf · uploaded 3 Jan 2020Source
  • DocumentVicino Bldg1 Amended approval letter dt13012021.pdf · uploaded 14 Jan 2021Source
  • DocumentVicino Bldg1 Amended approval plans dt13012021Compressed.pdf · uploaded 14 Jan 2021Source

Technical (Architect)

  • DocumentVicino_A1A2_ Completion Certificate_signed.pdf · uploaded 17 Apr 2023Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Andheri, Andheri taluka

Survey, CTS, gat or plot numbers

243B/1243B/2247/A247/B

Boundaries

North
Part abutting Sethi Industries and Asha House
South
Part abutting Dipti classic and I zone
East
Building No 02 VICINO A3A4
West
13 Meter 400MM wide suren road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMorphogenesis—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology