Pearl Heritage
Certificate SignedAndheri, Mumbai Suburban 400057 |Promoter: Hari Om Construction
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- 3BHK, 2 BHK35 units in all
- Address
- 196 And 199, Koldongari RoadPIN 400057
- Designated bank account
- 179
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2026
- Registered
- 24 Aug 2017
- Promised
- 31 Dec 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51800010436 | 24 Aug 2017 | 31 Dec 2026 | 31 Dec 2026 | Hari Om Construction | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Pearl Heritage - Wing B | 7 | 28 |
| Pearl Heritage - Wing C | 7 | 7 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
8 of 35 units booked (23%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Pearl Heritage - Wing B | 3BHK | 76.74 sq m · 826 sq ft | 7 | 1 |
| Pearl Heritage - Wing B | 3BHK | 77.67 sq m · 836 sq ft | 7 | 1 |
| Pearl Heritage - Wing B | 3BHK | 77.76 sq m · 837 sq ft | 7 | 3 |
| Pearl Heritage - Wing B | 3BHK | 77.85 sq m · 838 sq ft | 7 | 1 |
| Pearl Heritage - Wing C | 2 BHK | 49.24 sq m · 530 sq ft | 7 | 2 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 120 filings listed on MahaRERA's project page
Finance
- PAN CardH-Pan.pdf · uploaded 29 Jul 2017Source
Legal
Show all 122 documentsShow fewer documents
Migrated
- 1 Details of encumbrancesENCUMBRANCES.pdf · uploaded 29 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)MYSCAN_20160301_0001.pdf · uploaded 29 Jul 2017Source
- 1 Building Plan Approval (IOD)img-301024005.pdf · uploaded 29 Jul 2017Source
- 2 Building Plan Approval (IOD)MYSCAN_20160301_0002.pdf · uploaded 29 Jul 2017Source
- 3 Building Plan Approval (IOD)MYSCAN_20160301_0003.pdf · uploaded 29 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentPearl heritage cc revised.pdf · uploaded 29 Jul 2017Source
- 2 Commencement Certificates / NA Order for plotted developmentCC-2.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Ar Cert Jatin Shah.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Er Cert 2.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of CA (Form 3)RERA - Hari Om29072017.pdf · uploaded 29 Jul 2017Source
- 1 Proforma of Allotment letterDECL FOR SALE AGREEMENT.pdf · uploaded 29 Jul 2017Source
- 1 OtherIOA.pdf · uploaded 29 Jul 2017Source
- 2 OtherLOI.pdf · uploaded 29 Jul 2017Source
- 3 OtherLOI2.pdf · uploaded 29 Jul 2017Source
- 4 OtherOC.pdf · uploaded 29 Jul 2017Source
- 5 Otherland Owners Declaration.pdf · uploaded 29 Jul 2017Source
- 1 Declaration in FORM BForm B-Hari Om.pdf · uploaded 23 Aug 2017Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2 Ar Cert 30-09-2017.pdf · uploaded 5 Jan 2019Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)3 Ar Cert 31-12-2017.pdf · uploaded 5 Jan 2019Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)5 Ar Cert 30-06-2018.pdf · uploaded 5 Jan 2019Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)6 Ar Cert 30-09-2018.pdf · uploaded 5 Jan 2019Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)4 Ar Cert 31-03-2018.pdf · uploaded 5 Jan 2019Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2 Er Cert 30-09-2017.pdf · uploaded 5 Jan 2019Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)3 Er Cert 31-12-2017.pdf · uploaded 5 Jan 2019Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)4 Er Cert 31-03-2018.pdf · uploaded 5 Jan 2019Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)5 Er Cert 30-06-2018.pdf · uploaded 5 Jan 2019Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)6 Er Cert 30-09-2018.pdf · uploaded 5 Jan 2019Source
- 2 Certificates of CA (Form 3)6 CA Certificate 30-09-2018.pdf · uploaded 18 Jan 2019Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)7 Ar Cert 31-12-2018.pdf · uploaded 23 Mar 2019Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)7 Er Cert 31-12-2018.pdf · uploaded 28 Mar 2019Source
- 3 Certificates of CA (Form 3)6 CA Certificate 31-12-2018.pdf · uploaded 28 Mar 2019Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)31th March 2018 Ar Cert.pdf · uploaded 28 Jun 2019Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)8 Ar Cert 31-03-2019.pdf · uploaded 28 Jun 2019Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)8 Er Cert 31-03-2019.pdf · uploaded 28 Jun 2019Source
- 4 Certificates of CA (Form 3)8 CA Certificate 31-03-2019.pdf · uploaded 15 Jul 2019Source
- 6 Other1 mb Rera Appt for Ramesh Shetty.pdf · uploaded 3 Nov 2020Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)12 Ar Cert 31-12-2020.pdf · uploaded 6 May 2021Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)12 Er Cert 31-12-2020.pdf · uploaded 6 May 2021Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)12 Er Cert 31-12-2020.pdf · uploaded 6 May 2021Source
- 5 Certificates of CA (Form 3)12 CA Certificate 31-12-2020.pdf · uploaded 6 May 2021Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold, Inventory 31-10-2022.pdf · uploaded 26 Nov 2022Source
- 6 Certificates of CA (Form 3)Pearl Heritage_Form 3 Final.pdf · uploaded 26 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Form 5 FY 17-18.pdf · uploaded 26 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 FY 18-19.pdf · uploaded 26 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 FY 19-20.pdf · uploaded 26 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 FY 20-21.pdf · uploaded 26 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 FY 21-22.pdf · uploaded 26 Nov 2022Source
- 1 Proforma of Agreement for salePearl Heritage draft agreement.pdf · uploaded 26 Nov 2022Source
- 2 a Details of encumbrances concerned to FinanceNon-Encumbrance Certificate legal.pdf · uploaded 28 Nov 2022Source
- 1 b Details of encumbrances concerned to LegalNon-Encumbrance Certificate legal.pdf · uploaded 28 Nov 2022Source
- 3 Commencement Certificates / NA Order for plotted developmentPearl Heritage_commencement Certificate.pdf · uploaded 28 Nov 2022Source
- 1 Declaration about Commencement CertificateForm - D.pdf · uploaded 28 Nov 2022Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)From - 1.pdf · uploaded 28 Nov 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)From-2A 31-03-2020.pdf · uploaded 28 Nov 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)From-2A 31-03-2021.pdf · uploaded 28 Nov 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)From-2A 31-03-2022.pdf · uploaded 28 Nov 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)From-2A 31-03-2022.pdf · uploaded 28 Nov 2022Source
- 1 CERSAI detailsCERSAI_Report.pdf · uploaded 28 Nov 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat - A.pdf · uploaded 28 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 2022-23_Pearl Heritage_Signed Copy.pdf · uploaded 7 Nov 2023Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2 _Engineer Certificate.pdf · uploaded 19 Dec 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)From - 2A - 31-03-2023.pdf · uploaded 19 Dec 2023Source
- 2 Disclosure of sold/ booked inventoryFormat - Disclosure of sold-Booked Inventory.pdf · uploaded 19 Dec 2023Source
- 3 Disclosure of sold/ booked inventoryFormat - Disclosure of sold-Booked Inventory.pdf · uploaded 19 Dec 2023Source
- 2 Declaration in FORM B4 Pearl Heritage_Form B - Affidavit_Promoter.pdf · uploaded 23 Dec 2023Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)From - 1.pdf · uploaded 3 Jan 2024Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Engineer Certificate_Revised.pdf · uploaded 3 Jan 2024Source
- 7 Certificates of CA (Form 3)Pearl Heritage_Form 3 Certificate_Signed_compressed.pdf · uploaded 3 Jan 2024Source
- Form 1Form 1 - Architect Certificate_Revised - 19-08-2026.pdf · uploaded 19 Aug 2026Source
- Form 2Form-2 dt19-08-2026.pdf · uploaded 19 Aug 2026Source
- Form 3Final signed form 3.pdf · uploaded 19 Aug 2026Source
- Disclosure of Sold and Booked InventoryFinal signed form 3.pdf · uploaded 19 Aug 2026Source
- Form 2A (FY 2023-2024)MahaRERA New Format of Form 2A_Quality Assurance Certificate 31-03-2024.pdf · uploaded 21 Aug 2026Source
- Form 2A (FY 2024-2025)MahaRERA New Format of Form 2A_Quality Assurance Certificate 31-03-2025.pdf · uploaded 21 Aug 2026Source
- Form 5 (FY 2023-2024)ANNUAL REPORT ON STATMENT OF ACCOUNT HARI OM CNST FROM 20232024.pdf · uploaded 21 Aug 2026Source
- Form 5 (FY 2024-2025)ANNUAL REPORT ON STATMENT OF ACCOUNT HARI OM CONST FROM 20242025.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 1Form 1 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 1Form 1 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 1Form 1 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 1Form 1 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 1Form 1 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 1Form 1 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 1Form 1 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 1Form 1 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 2Form 2 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 2Form 2 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 2Form 2 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 2Form 2 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 2Form 2 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 2Form 2 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 2Form 2 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 2Form 2 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 3Form 3 as on 30062026 Pearl Heritage Signed.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 3Form 3 as on 30062026 Pearl Heritage Signed.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 3Form 3 as on 30062026 Pearl Heritage Signed.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 3Form 3 as on 30062026 Pearl Heritage Signed.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 3Form 3 as on 30062026 Pearl Heritage Signed.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 3Form 3 as on 30062026 Pearl Heritage Signed.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 3Form 3 as on 30062026 Pearl Heritage Signed.pdf · uploaded 22 Sep 2026Source
- Withdrawal Update Form 3Form 3 as on 30062026 Pearl Heritage Signed.pdf · uploaded 22 Sep 2026Source
- Form 2A (FY 2025-2026)Form 2A FY 25 26_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
- Form 5 (FY 2025-2026)Form 5 2025 26 Signed.pdf · uploaded 6 Oct 2026Source
- Occupational CertificateFull OC for wing B dated 26 April 2023.pdf · uploaded 9 Oct 2026Source
- Occupational CertificatePart OC for wing C dated 19 Dec 2024.pdf · uploaded 9 Oct 2026Source
- Occupational CertificateFull OC for wing C dated 13 Aug 2026.pdf · uploaded 9 Oct 2026Source
- Occupational CertificateFinal OC Plan_Pearl Heritage dated 13 Aug 2026.pdf · uploaded 9 Oct 2026Source
- Occupational CertificateAcknowledgement for verification of Full OC_Pearl Heritage.pdf · uploaded 9 Oct 2026Source
Technical
- DocumentMYSCAN_20160301_0001.pdf · uploaded 29 Jul 2017Source
- Documentimg-301024005.pdf · uploaded 29 Jul 2017Source
- DocumentMYSCAN_20160301_0002.pdf · uploaded 29 Jul 2017Source
- DocumentMYSCAN_20160301_0003.pdf · uploaded 29 Jul 2017Source
- DocumentFinal OC Plan_Pearl Heritage dated 13 Aug 2026.pdf · uploaded 22 Sep 2026Source
Technical (Architect)
- DocumentForm 1 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
Technical (Engineer)
- DocumentForm 2 Q1 FY 26 27_Pearl Heritage.pdf · uploaded 22 Sep 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Andheri, Andheri taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Cts No 200
- South
- Internal Road And Cts No 198
- East
- Koldongari Road
- West
- Cts No 195 And 259
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ar. Jatin Shah & Associates | — |
| Architect | Vastu Creations | — |
| Chartered accountant | RANK & Associates | — |
| Chartered accountant | Tark Gor & Associates | — |
| Engineer | Deepak Laxman Alave | — |
| Engineer | Sura & Associates | — |
| Engineer | Tribuvannath Pathak | — |
| Other | Haresh Constructions | — |
Show all 13 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Other | Omkar Construction | — |
| Other | Pravin Electricals | — |
| Other | Raju Kanojia | — |
| Registered real estate agent | Indu Singhvi | — |
| Registered real estate agent | Sohan Singhvi | — |
Source: MahaRERA project page. Contact details are not shown.