Pearl 2

Certificate Signed

Andheri, Mumbai Suburban 400054 |Promoter: Pearl Building No -2 Co -Operative Housing Society Limited

Residential / Group HousingRERAP51800009076
19 Aug 2017Registered with MahaRERA
30 Mar 2027Promised completion
1Building
14Units registered14 booked (100%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK, 3BHK14 units in all
Address
G/346-19, Plot No 83- C/B-2, Andheri, AndheriPIN 400054
Designated bank account
171
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.08071, 72.83033
Pearl 2 is at latitude 19.08071, longitude 72.83033.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2027

Registered
19 Aug 2017
Promised
30 Mar 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5180000907619 Aug 201730 Mar 202730 Mar 2027Pearl Building No -2 Co -Operative Housing Society LimitedProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Pearl 2814

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

14 of 14 units booked (100%), as the promoter reported to MahaRERA

1BHK · 1 unit2BHK · 12 units3BHK · 1 unit
TypeCarpet areaUnitsBooked
1BHK43.46 sq m · 468 sq ft11
2BHK58.26 sq m · 627 sq ft11
2BHK69.84 sq m · 752 sq ft22
2BHK71.43 sq m · 769 sq ft44
2BHK71.53 sq m · 770 sq ft44
2BHK78.97 sq m · 850 sq ft11
3BHK98.01 sq m · 1,055 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 144 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardJHPL.pdf · uploaded 11 Oct 2017Source

Legal

  • Legal Title reportPearl 2 Title Certificate.pdf · uploaded 30 Jul 2017Source
  • Declaration Form BPearl 2 Declaration.pdf · uploaded 30 Jul 2017Source
  • Declaration Form BPearl Rera Affidavit Form B.pdf · uploaded 31 Jul 2023Source
  • Declaration Form BForm B.pdf · uploaded 27 Nov 2024Source
  • Declaration Form BAffidavit cum decleration - Pearl.pdf · uploaded 3 Mar 2025Source

Migrated

  • 1 Copy of the legal title reportPearl 2 Title Certificate.pdf · uploaded 30 Jul 2017Source
Show all 145 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesPearl 2 Self Declaration Regarding Encumbrances.pdf · uploaded 30 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)Pearl 2 Layout Letter.pdf · uploaded 30 Jul 2017Source
  • 1 Building Plan Approval (IOD)AMENDED IOD LETTER 16-5-2017.pdf · uploaded 30 Jul 2017Source
  • 1 Declaration in FORM BPearl 2 Declaration.pdf · uploaded 30 Jul 2017Source
  • 1 Proforma of Allotment letterPearl 2 To whomsover It May Concern.pdf · uploaded 30 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Pearl 2 Architect Certificate_SM.pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2 Pearl2.pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of CA (Form 3)CA Pearl 2.PDF · uploaded 31 Jul 2017Source
  • 1 PAN CardJHPL.pdf · uploaded 11 Oct 2017Source
  • 2 Proforma of Allotment letterRERA-Bhagtani Pearl-II.pdf · uploaded 11 Oct 2017Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)FY 2017-18 Form 5.pdf · uploaded 30 Apr 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FY 2018-19 Form 5.pdf · uploaded 30 Apr 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FY 2019-20 Form 5 (2).pdf · uploaded 30 Apr 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FY 2020-21 QTR 1 Form 5.pdf · uploaded 30 Apr 2021Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 PEARL - 2.pdf · uploaded 12 Aug 2021Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 PEARL -2.pdf · uploaded 12 Aug 2021Source
  • 2 Certificates of CA (Form 3)Form 3 Pearl 2.pdf · uploaded 12 Aug 2021Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Pearl 2 Sept 2021.pdf · uploaded 22 Mar 2022Source
  • 1 CERSAI detailsPearl 2.pdf · uploaded 22 Mar 2022Source
  • 3 Certificates of CA (Form 3)Form 3 Pearl 2 - 30-09-2021.pdf · uploaded 22 Mar 2022Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Pearl Dec 2021.pdf · uploaded 30 Aug 2022Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Pearl March 2022.pdf · uploaded 30 Aug 2022Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Pearl June 2022.pdf · uploaded 30 Aug 2022Source
  • 4 Certificates of CA (Form 3)Form 3 of Pearl 2 Dec 2021.pdf · uploaded 30 Aug 2022Source
  • 5 Certificates of CA (Form 3)Form 3 of Pearl 2 March 22.pdf · uploaded 30 Aug 2022Source
  • 6 Certificates of CA (Form 3)Form 3 of Pearl 2 June 22.pdf · uploaded 30 Aug 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Certificate 223.pdf · uploaded 30 Sep 2022Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- Pearl 2.pdf · uploaded 26 Nov 2022Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Pearl 2 as on September 2022.pdf · uploaded 11 Jan 2023Source
  • 7 Certificates of CA (Form 3)Form 3- Pearl 2 as on September 2022.pdf · uploaded 11 Jan 2023Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- Pearl 2.pdf · uploaded 21 Feb 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentNew CC - valid upto 27-02-23.pdf · uploaded 11 Apr 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentNEW CC - 1year extension.pdf · uploaded 11 Apr 2023Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate Pearl 2.pdf · uploaded 20 Apr 2023Source
  • 2 Building Plan Approval (IOD)Latest Layout.pdf · uploaded 5 Jun 2023Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Pearl 2 as on December 2022.pdf · uploaded 5 Jun 2023Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Pearl 2 as on March 2023.pdf · uploaded 5 Jun 2023Source
  • 8 Certificates of CA (Form 3)Form 3-Pearl 2 as on 31-12-2022.pdf · uploaded 5 Jun 2023Source
  • 9 Certificates of CA (Form 3)Form 3- Pearl 2 as on 31-03-2023.pdf · uploaded 5 Jun 2023Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Annexure A Form 1 first.pdf · uploaded 25 Jul 2023Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Annexure A Form 1 21 01 2021 December 20.pdf · uploaded 25 Jul 2023Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Annexure A Form 1 08 11 2022 september 22.pdf · uploaded 25 Jul 2023Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Annexure A Form 1 14 02 2023 december 2022.pdf · uploaded 25 Jul 2023Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Annexure A Form 1 19 04 2023 March 23.pdf · uploaded 25 Jul 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Form 5 - Aug 17 to MArch 18.pdf · uploaded 25 Jul 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 - Apr 18 to March 19.pdf · uploaded 25 Jul 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form No5 Apr 19 to March 20.pdf · uploaded 25 Jul 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 - Apr 21 to March 22.pdf · uploaded 25 Jul 2023Source
  • 2 Declaration in FORM BPearl Rera Affidavit Form B.pdf · uploaded 31 Jul 2023Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 -31-03-2021.pdf · uploaded 31 Jul 2023Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - 30-09-2021.pdf · uploaded 31 Jul 2023Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - 30-06-2022.pdf · uploaded 31 Jul 2023Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - 31-12-2022.pdf · uploaded 31 Jul 2023Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)CA certificate 30 09 2022.pdf · uploaded 31 Jul 2023Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)organized 31 03 2023.pdf · uploaded 31 Jul 2023Source
  • 10 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 31 Jul 2023Source
  • 11 Certificates of CA (Form 3)CA Certificate as on 30 09 2021.pdf · uploaded 31 Jul 2023Source
  • 12 Certificates of CA (Form 3)CA Certificate - Bhavik.pdf · uploaded 31 Jul 2023Source
  • 13 Certificates of CA (Form 3)CA Certificate 31-03-2021.pdf · uploaded 31 Jul 2023Source
  • 14 Certificates of CA (Form 3)CA Certificate as on 30 09 2021.pdf · uploaded 31 Jul 2023Source
  • 15 Certificates of CA (Form 3)FORM - 3 30 6 2022.pdf · uploaded 31 Jul 2023Source
  • 16 Certificates of CA (Form 3)CA certificate 30 09 2022.pdf · uploaded 31 Jul 2023Source
  • 17 Certificates of CA (Form 3)organized 31 03 2023.pdf · uploaded 31 Jul 2023Source
  • 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Pearl 2 as on March 2023.pdf · uploaded 7 Aug 2023Source
  • 18 Certificates of CA (Form 3)Form 3- Pearl 2 as on 30-06-2023.pdf · uploaded 7 Aug 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5- Pearl 2 as on 2022-23.pdf · uploaded 30 Sep 2023Source
  • 19 Certificates of CA (Form 3)Form 3-Pearl 2 as on 30-09-2023.pdf · uploaded 20 Oct 2023Source
  • 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Pearl 2 as on 30-06-2023.pdf · uploaded 28 Oct 2023Source
  • 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Pearl 2 Sept 23 - Form 2.pdf · uploaded 28 Oct 2023Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- Pearl 2 as on 15-09-2023.pdf · uploaded 2 Feb 2024Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate -.pdf · uploaded 2 Feb 2024Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Pearl 2 as on June 2024.pdf · uploaded 8 Jul 2024Source
  • 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Pearl 2 Dec 2023.pdf · uploaded 18 Jul 2024Source
  • 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Pearl 2 March 2024.pdf · uploaded 18 Jul 2024Source
  • 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Pearl 2 June 2024.pdf · uploaded 18 Jul 2024Source
  • 20 Certificates of CA (Form 3)Form 3-Pearl 2 as on 31-12-2023.pdf · uploaded 18 Jul 2024Source
  • 21 Certificates of CA (Form 3)Form 3-Pearl 2 as on 31-03-2024.pdf · uploaded 18 Jul 2024Source
  • 22 Certificates of CA (Form 3)Form 3-Pearl 2 as on 30-06-2024.pdf · uploaded 18 Jul 2024Source
  • 1 Certificates of CA (Form 3)Form 3 - Pearl 2 as on Sep 2024.pdf · uploaded 8 Nov 2024Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Pearl 2 as on Sep 2024.pdf · uploaded 8 Nov 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A.pdf · uploaded 18 Nov 2024Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 27 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A 19-20.pdf · uploaded 27 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A 20-21.pdf · uploaded 27 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 21-22.pdf · uploaded 27 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 22-23.pdf · uploaded 27 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 23-24.pdf · uploaded 27 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Pearl 2 - FY 2023-24.pdf · uploaded 27 Nov 2024Source
  • 2 Certificates of CA (Form 3)Form 3 Sept 24.pdf · uploaded 2 Dec 2024Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Sept 24.pdf · uploaded 2 Dec 2024Source
  • 1 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 2 Dec 2024Source
  • 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 2 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23.pdf · uploaded 2 Dec 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 23-24.pdf · uploaded 2 Dec 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Nov 24.pdf · uploaded 12 Dec 2024Source
  • 1 Declaration in FORM BAffidavit cum decleration - Pearl.pdf · uploaded 3 Mar 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Pearl Architect Certificate - dec24.pdf · uploaded 3 Mar 2025Source
  • 1 Certificates of CA (Form 3)Pearl CA - Dec.pdf · uploaded 3 Mar 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Pearl Annexure B - Dec 24.pdf · uploaded 3 Mar 2025Source
  • 1 Disclosure of sold/ booked inventoryProject Pearl Circular 29.pdf · uploaded 3 Mar 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Pearl 2 as on March 2025.pdf · uploaded 16 Apr 2025Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Pearl 2 as on December 2024.pdf · uploaded 16 Apr 2025Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Pearl 2 as on March 2025.pdf · uploaded 16 Apr 2025Source
  • 1 Certificates of CA (Form 3)Form 3 - Pearl 2 as on March 2025.pdf · uploaded 16 Apr 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Pearl 2 as on March 2025.pdf · uploaded 16 Apr 2025Source
  • Form 1Form 1 - Pearl 2 as on June 2025.pdf · uploaded 14 May 2026Source
  • Form 1Form 1 - Pearl 2 as on Sep 2025.pdf · uploaded 14 May 2026Source
  • Form 1Form 1 - Pearl 2 as on Dec 2025.pdf · uploaded 14 May 2026Source
  • Form 2Form 2 - Pearl 2 as on June 2025.pdf · uploaded 14 May 2026Source
  • Form 2Form 2 - Pearl 2 as on Sep 2025.pdf · uploaded 14 May 2026Source
  • Form 2Form 2 - Pearl 2 as on Dec 2025.pdf · uploaded 14 May 2026Source
  • Form 3Form 3 - Pearl 2 as on 30-06-2025.pdf · uploaded 14 May 2026Source
  • Form 3Form 3 - Pearl 2 as on Sep 2025.pdf · uploaded 14 May 2026Source
  • Form 3Form 3 - Pearl 2 as on Dec 2025.pdf · uploaded 14 May 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Pearl 2 as on 30-06-2025.pdf · uploaded 14 May 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Pearl 2 as on Sep 2025.pdf · uploaded 14 May 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Pearl 2 as on Dec 2025.pdf · uploaded 14 May 2026Source
  • Withdrawal Update Form 1Form 1 - Pearl 2 as on June 2024.pdf · uploaded 30 Jun 2026Source
  • Withdrawal Update Form 2Form 2 - Pearl 2 as on March 2026.pdf · uploaded 30 Jun 2026Source
  • Withdrawal Update Form 3Form 3 - Pearl 2 as on March 2026.pdf · uploaded 30 Jun 2026Source
  • Withdrawal Update Form 1Form 1 - Pearl 2 as on June 2026.pdf · uploaded 29 Aug 2026Source
  • Withdrawal Update Form 2Form 2 - Pearl 2 as on June 2026.pdf · uploaded 29 Aug 2026Source
  • Withdrawal Update Form 3Form 3 - Pearl 2 as on June 2026.pdf · uploaded 29 Aug 2026Source

Technical

  • DocumentPearl 2 Layout Letter.pdf · uploaded 30 Jul 2017Source
  • DocumentAMENDED IOD LETTER 16-5-2017.pdf · uploaded 30 Jul 2017Source
  • DocumentLatest Layout.pdf · uploaded 5 Jun 2023Source

Technical (Architect)

  • DocumentForm 1 Nov 24.pdf · uploaded 12 Dec 2024Source
  • DocumentPearl Architect Certificate - dec24.pdf · uploaded 3 Mar 2025Source
  • DocumentForm 1 - Pearl 2 as on March 2025.pdf · uploaded 16 Apr 2025Source
  • DocumentForm 1 - Pearl 2 as on December 2024.pdf · uploaded 16 Apr 2025Source
  • DocumentForm 1 - Pearl 2 as on March 2025.pdf · uploaded 16 Apr 2025Source
  • DocumentForm 1 - Pearl 2 as on June 2026.pdf · uploaded 4 Sep 2026Source

Technical (Engineer)

  • DocumentForm 2 - Pearl 2 as on Sep 2024.pdf · uploaded 8 Nov 2024Source
  • DocumentForm 2 Sept 24.pdf · uploaded 2 Dec 2024Source
  • DocumentPearl Annexure B - Dec 24.pdf · uploaded 3 Mar 2025Source
  • DocumentForm 2 - Pearl 2 as on March 2025.pdf · uploaded 16 Apr 2025Source
  • DocumentForm 2 - Pearl 2 as on June 2026.pdf · uploaded 29 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Andheri, Andheri taluka

Survey, CTS, gat or plot numbers

G/346-19Plot No 83- C/B-2

Boundaries

North
Land Bearing CTS No G 346 - 20
South
Land Bearing CTS no 341
East
Land Bearing CTS No 346 - 22
West
Land Bearing CTS No 346 - 18

Source: registration certificates and MahaRERA's project page, as stated there.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology