Satguru Serenity

Certificate Signed

Ward Gnorth, Maharashtra 400028 |Promoter: Utsav Developers

2 May 2024Registered with MahaRERA
31 Dec 2026Promised completion
30 Apr 2027Revised completionPushed back 4 months
1Building
71Units registered7 booked (10%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK, 3BHK, Business office, MHADA 1 BHK, MHADA 1 RK, MHADA 2 BHK, PAP 1 BHK, Proffessional office, REHAB 1 BHK, Rehab office, Rehab shop, Shop allotted to pap71 units in all
Address
134, R.k. Vaidya Road, Dadar WestPIN 400028
Designated bank account
220
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.02309, 72.84098
Satguru Serenity is at latitude 19.02309, longitude 72.84098.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
2 May 2024
Promised
31 Dec 2026
Revised
30 Apr 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P519000559462 May 202431 Dec 202630 Apr 2027Utsav DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Satguru Serenity1371

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

7 of 71 units booked (10%), as the promoter reported to MahaRERA

1BHK · 10 units2BHK · 7 units3BHK · 1 unitBusiness office · 1 unitMHADA 1 BHK · 1 unitMHADA 1 RK · 1 unitMHADA 2 BHK · 1 unitPAP 1 BHK · 2 unitsProffessional office · 1 unitREHAB 1 BHK · 14 unitsRehab office · 20 unitsRehab shop · 8 unitsShop allotted to pap · 4 units
TypeCarpet areaUnitsBooked
1BHK38.98 sq m · 420 sq ft20
1BHK39.05 sq m · 420 sq ft20
1BHK42.72 sq m · 460 sq ft60
2BHK59.45 sq m · 640 sq ft74
3BHK70.94 sq m · 764 sq ft10
Business office107.16 sq m · 1,153 sq ft10
MHADA 1 BHK42.72 sq m · 460 sq ft11
MHADA 1 RK30.01 sq m · 323 sq ft10
Show all 46 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
MHADA 2 BHK59.45 sq m · 640 sq ft11
PAP 1 BHK38.98 sq m · 420 sq ft11
PAP 1 BHK39.05 sq m · 420 sq ft10
Proffessional office30.04 sq m · 323 sq ft10
REHAB 1 BHK38.98 sq m · 420 sq ft70
REHAB 1 BHK39.05 sq m · 420 sq ft70
Rehab office9.03 sq m · 97 sq ft10
Rehab office9.47 sq m · 102 sq ft10
Rehab office10.63 sq m · 114 sq ft10
Rehab office13.03 sq m · 140 sq ft10
Rehab office13.98 sq m · 150 sq ft10
Rehab office14.18 sq m · 153 sq ft10
Rehab office14.58 sq m · 157 sq ft10
Rehab office15.68 sq m · 169 sq ft10
Rehab office17.51 sq m · 188 sq ft10
Rehab office18.14 sq m · 195 sq ft10
Rehab office24.08 sq m · 259 sq ft10
Rehab office25.14 sq m · 271 sq ft10
Rehab office25.71 sq m · 277 sq ft10
Rehab office26.38 sq m · 284 sq ft10
Rehab office27.44 sq m · 295 sq ft10
Rehab office27.59 sq m · 297 sq ft10
Rehab office30.75 sq m · 331 sq ft10
Rehab office31.29 sq m · 337 sq ft10
Rehab office57.24 sq m · 616 sq ft10
Rehab office86.99 sq m · 936 sq ft10
Rehab shop4.8 sq m · 52 sq ft10
Rehab shop6.83 sq m · 74 sq ft10
Rehab shop7.3 sq m · 79 sq ft10
Rehab shop12.02 sq m · 129 sq ft10
Rehab shop18.36 sq m · 198 sq ft10
Rehab shop21.78 sq m · 234 sq ft10
Rehab shop22.29 sq m · 240 sq ft10
Rehab shop23.05 sq m · 248 sq ft10
Shop allotted to pap29.29 sq m · 315 sq ft10
Shop allotted to pap29.33 sq m · 316 sq ft10
Shop allotted to pap29.81 sq m · 321 sq ft10
Shop allotted to pap31.91 sq m · 343 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 102 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Card1 PAN CARD.pdf · uploaded 28 Mar 2024Source
  • Other – Financefinana.pdf · uploaded 17 Apr 2024Source

Legal

  • Other – Legal18 Legal Other- Rectification Deed_compressed EXTREME-1-36.pdf · uploaded 28 Mar 2024Source
  • Other – Legal18 Legal Other- Rectification Deed_compressed EXTREME-37-73.pdf · uploaded 28 Mar 2024Source
  • Other – Legal18 Legal Other- Rectification Deed_compressed EXTREME-74-110.pdf · uploaded 28 Mar 2024Source
  • Other – Legal18 Legal Other- Rectification Deed_compressed EXTREME-111-147.pdf · uploaded 28 Mar 2024Source
  • Other – Legal18 Legal Other- Rectification Deed_compressed EXTREME-148-182.pdf · uploaded 28 Mar 2024Source
Show all 103 documentsShow fewer documents

Legal

  • Other – Legal17 Legal Other- Sale Deed_compressed-1-8.pdf · uploaded 28 Mar 2024Source
  • Other – Legal17 Legal Other- Sale Deed_compressed-9-19.pdf · uploaded 28 Mar 2024Source
  • Other – Legal17 Legal Other- Sale Deed_compressed-20-27.pdf · uploaded 28 Mar 2024Source
  • Other – Legal19 Legal Other - Partnership Deed.pdf · uploaded 28 Mar 2024Source
  • Legal Title report1 Copy of the legal title report (1).pdf · uploaded 28 Mar 2024Source
  • Declaration Form BForm B corrected.pdf · uploaded 3 Apr 2024Source

Migrated

  • 1 PAN Card1 PAN CARD.pdf · uploaded 28 Mar 2024Source
  • 1 Copy of the legal title report1 Copy of the legal title report (1).pdf · uploaded 28 Mar 2024Source
  • 1 a Details of encumbrances concerned to Finance3 a Details of encumbrances concerned to Finance.pdf · uploaded 28 Mar 2024Source
  • 2 a Details of encumbrances concerned to Finance4 b Details of encumbrances concerned to Legal.pdf · uploaded 28 Mar 2024Source
  • 1 b Details of encumbrances concerned to Legal3 a Details of encumbrances concerned to Finance.pdf · uploaded 28 Mar 2024Source
  • 2 b Details of encumbrances concerned to Legal4 b Details of encumbrances concerned to Legal.pdf · uploaded 28 Mar 2024Source
  • 1 Commencement Certificates / NA Order for plotted development7 Commencement Certificates NA Order for plotted development PRINT.pdf · uploaded 28 Mar 2024Source
  • 1 CERSAI details12 CERSAI details.pdf · uploaded 28 Mar 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)13 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf · uploaded 28 Mar 2024Source
  • 1 Disclosure of Interest in Other Real Estate Organizations14 Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 28 Mar 2024Source
  • 1 Proforma of Allotment letter16 Proforma of Allotment letter.pdf · uploaded 28 Mar 2024Source
  • 1 Proforma of Agreement for saleAFS.pdf · uploaded 28 Mar 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same (1).pdf · uploaded 28 Mar 2024Source
  • 1 Deviation Report with respect to Allotment letter24 Deviation Report with respect to Allotment letter.pdf · uploaded 28 Mar 2024Source
  • 1 Deviation Report with respect to model copy of Agreement25 Deviation Report with respect to model copy of Agreement.pdf · uploaded 28 Mar 2024Source
  • 1 Other – Legal18 Legal Other- Rectification Deed_compressed EXTREME-1-36.pdf · uploaded 28 Mar 2024Source
  • 2 Other – Legal18 Legal Other- Rectification Deed_compressed EXTREME-37-73.pdf · uploaded 28 Mar 2024Source
  • 3 Other – Legal18 Legal Other- Rectification Deed_compressed EXTREME-74-110.pdf · uploaded 28 Mar 2024Source
  • 4 Other – Legal18 Legal Other- Rectification Deed_compressed EXTREME-111-147.pdf · uploaded 28 Mar 2024Source
  • 5 Other – Legal18 Legal Other- Rectification Deed_compressed EXTREME-148-182.pdf · uploaded 28 Mar 2024Source
  • 6 Other – Legal17 Legal Other- Sale Deed_compressed-1-8.pdf · uploaded 28 Mar 2024Source
  • 7 Other – Legal17 Legal Other- Sale Deed_compressed-9-19.pdf · uploaded 28 Mar 2024Source
  • 8 Other – Legal17 Legal Other- Sale Deed_compressed-20-27.pdf · uploaded 28 Mar 2024Source
  • 9 Other – Legal19 Legal Other - Partnership Deed.pdf · uploaded 28 Mar 2024Source
  • 1 Other – Technical21 Technical - Partnership Deed.pdf · uploaded 28 Mar 2024Source
  • 2 Other – Technical22 Technical - Annexure A.pdf · uploaded 28 Mar 2024Source
  • 1 Copy of Layout Approval (in case of layout)PLAN COPY_Page_1.pdf · uploaded 29 Mar 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentPLAN COPY_Page_2.pdf · uploaded 29 Mar 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentPLAN COPY_Page_3.pdf · uploaded 29 Mar 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentPLAN COPY_Page_4.pdf · uploaded 29 Mar 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentPLAN COPY_Page_5.pdf · uploaded 29 Mar 2024Source
  • 1 Declaration about Commencement Certificate1 Declaration about Commencement Certificate (1).pdf · uploaded 29 Mar 2024Source
  • 1 Declaration in FORM BForm B corrected.pdf · uploaded 3 Apr 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 5 Apr 2024Source
  • 1 Other – Financefinana.pdf · uploaded 17 Apr 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 13 Aug 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 13 Aug 2024Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 13 Aug 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 13 Aug 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Utsav Developer Sep 2024.pdf · uploaded 20 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ JUNE 24.pdf · uploaded 28 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_SEP 24.pdf · uploaded 28 Jan 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ DEC 24.pdf · uploaded 28 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ JUNE 24.pdf · uploaded 28 Jan 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ SEP 24.pdf · uploaded 28 Jan 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ DEC 24.pdf · uploaded 28 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ JUNE 24.pdf · uploaded 28 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_SEP 24.pdf · uploaded 28 Jan 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ DEC 24.pdf · uploaded 28 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD_ JUNE 24.pdf · uploaded 28 Jan 2025Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD_ SEP 24.pdf · uploaded 28 Jan 2025Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLD_ DEC 24.pdf · uploaded 28 Jan 2025Source
  • Form 1FORM 1 _MARCH 25_SATGURU SERENITY.pdf · uploaded 4 Nov 2025Source
  • Form 2FORM 2_MARCH 25_SATGURU SERENITY.pdf · uploaded 4 Nov 2025Source
  • Form 3FORM 3_MARCH 25_SATGURU SERENITY.pdf · uploaded 4 Nov 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_MARCH 25_SATGURU SERENITY.pdf · uploaded 4 Nov 2025Source
  • Form 1FORM 1_JUNE 25_SATGURU SERENITY.pdf · uploaded 4 Nov 2025Source
  • Form 2FORM 2_JUNE 25_SATGURU SERENITY.pdf · uploaded 4 Nov 2025Source
  • Form 3FORM 3_JUNE 25_SATGURU SERENITY.pdf · uploaded 4 Nov 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_JUNE 25_SATGURU SERENITY.pdf · uploaded 4 Nov 2025Source
  • Form 1FORM 1_SEP 25_SATGURU SERENITY.pdf · uploaded 4 Nov 2025Source
  • Form 2FORM 2_SEP 25_SATGURU SERENITY.pdf · uploaded 4 Nov 2025Source
  • Form 3FORM 3_SEP 25_SATUGURU SERENITY.pdf · uploaded 4 Nov 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY_SEP 25 _SADGURU SERENITY.pdf · uploaded 4 Nov 2025Source
  • Form 2A (FY 2024-2025)UTSAV FORM 2A_NEW 31.03.2025 (1).pdf · uploaded 22 Dec 2025Source
  • Form 1FORM 1_ DEC 25_ SATGURU SERINITY.pdf · uploaded 24 Apr 2026Source
  • Form 2FORM 2_ DEC 25_ SATGURU SERINITY.pdf · uploaded 24 Apr 2026Source
  • Form 3FORM 3_ DEC 25_ SATGURU SERINITY.pdf · uploaded 24 Apr 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_ DEC 25_ SATGURU SERINITY.pdf · uploaded 24 Apr 2026Source
  • Form 1FORM 1_ MARCH 26_ SATGURU SERENITY.pdf · uploaded 13 Jul 2026Source
  • Form 2FORM 2_ MARCH 26_ SATGURU SERENITY.pdf · uploaded 13 Jul 2026Source
  • Form 3FORM 3_ MARCH 26_ SATGURU SERENITY.pdf · uploaded 13 Jul 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_ MARCH 26_ SATGURU SERENITY.pdf · uploaded 13 Jul 2026Source
  • Form 2A (FY 2025-2026)FORM 2A_MARCH 2026_SATGURU SERENITY.pdf · uploaded 23 Jul 2026Source

Technical

  • Other – Technical21 Technical - Partnership Deed.pdf · uploaded 28 Mar 2024Source
  • Other – Technical22 Technical - Annexure A.pdf · uploaded 28 Mar 2024Source
  • DocumentPLAN COPY_Page_1.pdf · uploaded 29 Mar 2024Source
  • DocumentPLAN COPY_Page_2.pdf · uploaded 29 Mar 2024Source
  • DocumentPLAN COPY_Page_3.pdf · uploaded 29 Mar 2024Source
  • DocumentPLAN COPY_Page_4.pdf · uploaded 29 Mar 2024Source
  • DocumentPLAN COPY_Page_5.pdf · uploaded 29 Mar 2024Source

Technical (Architect)

  • DocumentFORM 1.pdf · uploaded 13 Aug 2024Source
  • DocumentFORM 1_ JUNE 24.pdf · uploaded 28 Jan 2025Source
  • DocumentFORM 1_SEP 24.pdf · uploaded 28 Jan 2025Source
  • DocumentFORM 1_ DEC 24.pdf · uploaded 28 Jan 2025Source

Technical (Engineer)

  • DocumentFORM 2.pdf · uploaded 13 Aug 2024Source
  • DocumentFORM 2_ JUNE 24.pdf · uploaded 28 Jan 2025Source
  • DocumentFORM 2_SEP 24.pdf · uploaded 28 Jan 2025Source
  • DocumentFORM 2_ DEC 24.pdf · uploaded 28 Jan 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In GNorth-400028, Ward GNorth taluka

Survey, CTS, gat or plot numbers

134

Boundaries

North
Plot No 145 And 151
South
R K Vaidya Marg
East
Plot No 144
West
Plot No 133

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Sumeet Sadawarti—
Chartered accountantCa Himmat D Shethia—
EngineerPrathamesh V Khamkar—

Source: MahaRERA project page. Contact details are not shown.