Utsav Residency

Completed

Jalna (M Cl), Jalna 431203 |Promoter: Kailash Radhakrishna Kshirsagar

14 Sep 2017Registered with MahaRERA
18 Sep 2018Promised completion
1Building
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Land area for this project
566 sq m (6,096 sq ft)
Permissible built-up area
1 sq m (13 sq ft)
Sanctioned built-up area
1 sq m (13 sq ft)
Recreational open space
34 sq m (363 sq ft)
Address
Cts No 12043, 12044, 12045PIN 431203
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.51875, 73.93112
Utsav Residency is at latitude 18.51875, longitude 73.93112.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 18 Sep 2018

The latest completion date on record passed 8 years and 1 month ago.

Registered
14 Sep 2017
Promised
18 Sep 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5140001306914 Sep 201718 Sep 2018—Kailash Radhakrishna KshirsagarProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Utsav Residency10—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Utsav Residency

  • Excavation100%
  • Basement (if any)8%
  • Podiums (if any)0%
  • Plinth8%
  • Stilt Floor0%
  • Slabs of Super Structure2%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises80%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyINDIVIDUAL BORES80%
  • Sewerage (Chamber, Lines, Septic Tank , STP)CHAMBER LINES SEPTIC TANK80%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 16 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • COMPOUND WALLCOMPOUND WALL80%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

11 documents held by Deedo, 16 filings listed on MahaRERA's project page

Encumbrance details

Commencement certificate

Form B

Title report

Form 1

Form 2

Registration certificate

Occupancy / completion certificate

  • Occupancy / completion certificate6 Nov 2020ViewSource
Show all 27 documentsShow fewer documents

Other

Allotment letter

Layout plan

Document library

  • Details of encumbrancesEncumbrances.pdf · uploaded 17 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencementcerti.pdf · uploaded 17 Aug 2017View
  • Declaration in FORM BFormB.pdf · uploaded 30 Aug 2017View
  • Building Plan Approval (IOD)Plan.pdf · uploaded 1 Sep 2017View
  • Copy of the legal title reportSEARCH REPORT.pdf · uploaded 1 Sep 2017View
  • Copy of Layout Approval (in case of layout)Plan.pdf · uploaded 1 Sep 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1.pdf · uploaded 1 Sep 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form2.pdf · uploaded 1 Sep 2017View
  • Proforma of Allotment letteragreement001.pdf · uploaded 1 Sep 2017View
  • Proforma of Allotment letteragreement001.pdf · uploaded 1 Sep 2017View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentcomplition 450 Utsav Residency.pdf · uploaded 6 Nov 2020View

Promoter documents

  • Declaration Form BFormB.pdf · uploaded 30 Aug 2017View
  • Legal Title reportSEARCH REPORT.pdf · uploaded 1 Sep 2017View

Technical documents

  • Building Plan ApprovalPlan.pdfView
  • Layout ApprovalPlan.pdfView

Proforma allotment letter

  • Proforma allotment letteragreement001.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

  • Suo motu order10 Feb 2020Matched by RERA number

    Suo motu order: Secretary, MahaRERA Versus Mr. Kailash Radhakrishna Kshirsagar (Suo Motu Case No. 68 of 2020) dated 10th February 2020

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Jalna (M Cl), Jalna taluka

Survey, CTS, gat or plot numbers

1204312044120441204512045CTS NO 12043

As published on MahaRERA's project page

CTS NO 12043, 12044, 12045

Boundaries

North
Road 15 Mw
South
Plot No 19 Cts No 12046
East
S No 450
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMrugank Arvind Lembhe—
EngineerHemant Rajmane—
OtherSunil Ramrao Kakde—

Source: MahaRERA project page. Contact details are not shown.