Rukhmini Heights

Active

Jalna (M Cl), Jalna 431203 |Promoter: Tirupati Infra Jalna

14 Aug 2025Registered with MahaRERA
31 Mar 2031Promised completion
4Buildings
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Active
Buildings
4
Land area for this project
3,675 sq m (39,557 sq ft)
Permissible built-up area
9,368 sq m (1,00,834 sq ft)
Sanctioned built-up area
9,368 sq m (1,00,834 sq ft)
Recreational open space
0 sq m (0 sq ft)
Planning authority
Jalna City Municipal Corporation
Address
CTS NO. 11497/149 to 11497/151, S No. 131(P), Plot No. 1 to 3, BHOKARDAN - RAJUR ROAD, JALNAPIN 431203
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Rukhmini Heights is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2031

Registered
14 Aug 2025
Promised
31 Mar 2031

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5140008091714 Aug 202531 Mar 2031—Tirupati Infra JalnaProject page

4 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A-111—
A-211—
B-16—
B-25—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A-1Closed/Covered0960096
A-1Open Space00000
A-2Closed/Covered0730073
A-2Open Space00000
B-1Closed/Covered0370037
B-1Open Space00000
B-2Closed/Covered0100010
B-2Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A-1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

A-2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

B-1

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B-2

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsAs per drawing by consultant60%
  • Water SupplyAs per drawing by consultant30%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per drawing by consultant25%
  • Storm Water DrainsAs per drawing by consultant0%
  • Landscaping & Tree PlantingAs per drawing by consultant0%
  • Street LightingAs per drawing by consultant0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAs per drawing by consultant0%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAs per drawing by consultant0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAs per drawing by consultant0%
  • Electrical meter room, sub-station, receiving stationAs per drawing by consultant0%
  • Aggregate area of recreational Open SpaceAs per drawing by consultant0%
  • Open ParkingAs per drawing by consultant0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

65 documents held by Deedo, 86 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form - 2A.PDF · uploaded 18 Mar 2025View
  • Building Plan Approval / NA Order for plotted developmentNA Order.PDF · uploaded 20 Mar 2025View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 20 Mar 2025View
  • Other – LegalPR Card_149 To 151.PDF · uploaded 20 Mar 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)From 2A.PDF · uploaded 25 Mar 2025View
  • Disclosure for secured/unsecured finance availed for the projectDiscloser For Secured.PDF · uploaded 25 Mar 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate.PDF · uploaded 25 Mar 2025View
  • Copy of Layout Approval (in case of layout)Layout_compressed.pdf · uploaded 26 Mar 2025View
  • a Details of encumbrances concerned to FinanceNon Encumbrance Notory.PDF · uploaded 26 Mar 2025View
  • b Details of encumbrances concerned to LegalNon Encumbrance Notory.PDF · uploaded 26 Mar 2025View
  • a Details of encumbrances concerned to FinanceEncumbrances Letter Head.PDF · uploaded 26 Mar 2025View
  • b Details of encumbrances concerned to LegalEncumbrances Letter Head.PDF · uploaded 26 Mar 2025View
  • Building Plan Approval / NA Order for plotted developmentmap 27.pdf · uploaded 26 Mar 2025View
  • Building Plan Approval / NA Order for plotted developmentmap 17.pdf · uploaded 26 Mar 2025View
  • Building Plan Approval / NA Order for plotted developmentmap 37_compressed.pdf · uploaded 26 Mar 2025View
  • Building Plan Approval / NA Order for plotted developmentmap 67_compressed.pdf · uploaded 26 Mar 2025View
  • Building Plan Approval / NA Order for plotted developmentmap 57_compressed.pdf · uploaded 26 Mar 2025View
  • Building Plan Approval / NA Order for plotted developmentmap 47_compressed.pdf · uploaded 26 Mar 2025View
  • Building Plan Approval / NA Order for plotted developmentMap 77_compressed.pdf · uploaded 9 Apr 2025View
  • CERSAI detailsCersai Report.PDF · uploaded 11 Apr 2025View
  • a Details of encumbrances concerned to FinanceRegarding Encumbrances.PDF · uploaded 11 Apr 2025View
  • b Details of encumbrances concerned to LegalRegarding Encumbrances.PDF · uploaded 11 Apr 2025View
  • Declaration in FORM BNotary Form B_compressed.pdf · uploaded 11 Apr 2025View
  • Other – TechnicalDeepak.PDF · uploaded 11 Apr 2025View
  • Other – TechnicalAgrawal.PDF · uploaded 11 Apr 2025View
  • Other – TechnicalAbhay.PDF · uploaded 11 Apr 2025View
  • Other – TechnicalShivaji.PDF · uploaded 11 Apr 2025View
  • Other – TechnicalShailesh.PDF · uploaded 11 Apr 2025View
  • Other – TechnicalDhananjay.PDF · uploaded 11 Apr 2025View
  • Other – TechnicalSunilkumar.PDF · uploaded 11 Apr 2025View
  • Other – TechnicalSirsat.PDF · uploaded 11 Apr 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Form A.pdf · uploaded 12 Apr 2025View
  • Deviation Report with respect to Allotment letterDeviation Allotment Letter.PDF · uploaded 18 Apr 2025View
  • Declaration about Commencement CertificateCommencement Certificate Format D.PDF · uploaded 18 Apr 2025View
  • Proforma of Agreement for saleRera ATS.pdf · uploaded 19 Jun 2025View
  • Proforma of Allotment letterRera Allotment Letter.pdf · uploaded 19 Jun 2025View
  • Copy of the legal title reportSEARCH - converted.pdf · uploaded 25 Jun 2025View
  • Other – LegalCC email.PDF · uploaded 8 Jul 2025View
  • Other – LegalATS.pdf · uploaded 12 Jul 2025View
  • Other – Legalno deviation allotment .pdf · uploaded 14 Jul 2025View
  • Deviation Report with respect to model copy of Agreementno deviation ats.pdf · uploaded 14 Jul 2025View
  • Commencement Certificates / NA Order for plotted developmentVERIFICATION CC.pdf · uploaded 15 Jul 2025View
  • Other – Legal35 Allottment Letter No deviation.pdf · uploaded 15 Jul 2025View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B Bank.pdf · uploaded 15 Jul 2025View
  • Declaration about all RERA Designated Bank Accounts (Format A)Format A.PDF · uploaded 15 Jul 2025View
  • Other – Legal5-7.pdf · uploaded 15 Jul 2025View
  • Other – Legal7-7.pdf · uploaded 15 Jul 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsAPPA.pdf · uploaded 16 Jul 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsAGRAWAL.pdf · uploaded 16 Jul 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsBHAVSAR.pdf · uploaded 16 Jul 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsPATIL.pdf · uploaded 16 Jul 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsDEEPAK.pdf · uploaded 16 Jul 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsVAZARKAR.pdf · uploaded 16 Jul 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsABHAY SIR.pdf · uploaded 16 Jul 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsSHAILASH SIR.pdf · uploaded 16 Jul 2025View
  • Other – Legal35 Allottment Letter No deviation.pdf · uploaded 16 Jul 2025View
  • Form 1FORM 1 ARCH Sept 25.pdf · uploaded 30 Jan 2026View
  • Form 2Form 2 30-09-2025.pdf · uploaded 30 Jan 2026View
  • Disclosure of Sold and Booked Inventorysold unsold 30-09-25.pdf · uploaded 30 Jan 2026View
  • Form 1Form 1 Dec 2025.pdf · uploaded 30 Jan 2026View
  • Form 2Form 2 Dec 2025.pdf · uploaded 30 Jan 2026View
  • Disclosure of Sold and Booked InventorySold unsold 31-12-25.pdf · uploaded 30 Jan 2026View
  • Withdrawal Update Form 1Form 1.pdf · uploaded 27 Apr 2026View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 27 Apr 2026View
  • Withdrawal Update Form 1FORM 1 JUNE 2026.pdf · uploaded 17 Jul 2026View
  • Withdrawal Update Form 2FORM 2 JUNE 2026.pdf · uploaded 17 Jul 2026View

Promoter documents

  • Declaration Form BNotary Form B_compressed.pdf · uploaded 11 Apr 2025View
  • Legal Title reportSEARCH - converted.pdf · uploaded 25 Jun 2025View

Technical documents

  • Layout ApprovalLayout_compressed.pdfView
  • Building Plan ApprovalNA Order.PDFView
  • Building Plan Approvalmap 17.pdfView
  • Building Plan Approvalmap 27.pdfView
  • Building Plan Approvalmap 37_compressed.pdfView
  • Building Plan Approvalmap 47_compressed.pdfView
  • Building Plan Approvalmap 57_compressed.pdfView
  • Building Plan Approvalmap 67_compressed.pdfView
  • Building Plan ApprovalMap 77_compressed.pdfView

Other legal documents

  • Other – LegalPR Card_149 To 151.PDFView
  • Other – LegalCC email.PDFView
  • Other – LegalATS.pdfView
  • Other – Legalno deviation allotment .pdfView
  • Other – Legal35 Allottment Letter No deviation.pdfView
  • Other – Legal5-7.pdfView
  • Other – Legal7-7.pdfView
  • Other – Legal35 Allottment Letter No deviation.pdfView

Proforma allotment letter

  • Proforma allotment letterRera Allotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Jalna (M Cl), Jalna taluka

Survey, CTS, gat or plot numbers

CTS NO. 11497/149 to 11497/151Plot No. 1 to 3S No. 131(P)

As published on MahaRERA's project page

CTS NO. 11497/149 to 11497/151, S No. 131(P), Plot No. 1 to 3

Boundaries

North
Part Of Survey No 131
South
Survey No 129
East
Survey No 128
West
Bhokardan Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMr Sameer Ausekar—
Chartered accountantYadkikar & Chandak—
EngineerMr Milind Wadekar—

Source: MahaRERA project page. Contact details are not shown.