Skip to content
Deedo home
Menu

Krishna Plaza

Completed

Jalna (M Cl), Jalna 431203 |Promoter: Krishna Plaza Developers

5 Mar 2019Registered with MahaRERA
20 Dec 2021Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Completed
Buildings
1
Land area for this project
2,800 sq m (30,139 sq ft)
Permissible built-up area
3,023 sq m (32,544 sq ft)
Sanctioned built-up area
3,023 sq m (32,544 sq ft)
Recreational open space
400 sq m (4,306 sq ft)
Address
16779, Station to Ambad Road, Old JalnaPIN 431203
Designated bank account
Central Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.83448, 75.88863
Krishna Plaza is at latitude 19.83448, longitude 75.88863.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 20 Dec 2021

The latest completion date on record passed 4 years and 10 months ago.

Registered
5 Mar 2019
Promised
20 Dec 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P514000197775 Mar 201920 Dec 2021—Krishna Plaza DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Krishna Plaza5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Krishna Plaza

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water Drains00%
  • Landscaping & Tree Planting00%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting00%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving station00%
  • Aggregate area of recreational Open Space00%
  • Open Parking00%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

17 documents held by Deedo, 17 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Occupancy / completion certificate (2)

  • Occupancy / completion certificate28 Jul 2021ViewSource
  • Occupancy / completion certificate18 Aug 2021ViewSource

Form 4 (2)

Show all 34 documentsShow fewer documents

Registration certificate

Other (5)

Layout plan

Building plan

Allotment letter

Document library

  • Declaration in FORM BB Form.pdf · uploaded 14 Feb 2019View
  • Details of encumbrancesEncumbarence.pdf · uploaded 14 Feb 2019View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 14 Feb 2019View
  • Copy of the legal title reportSearch Report.pdf · uploaded 14 Feb 2019View
  • Building Plan Approval (IOD)Building Plan.pdf · uploaded 14 Feb 2019View
  • Proforma of Allotment letterDraft Agreement.pdf · uploaded 14 Feb 2019View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 14 Feb 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentComplition.pdf · uploaded 28 Jul 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate Krishna Plaza(1).pdf · uploaded 18 Aug 2021View
  • Architect’s Certificate on Completion of Project (Form 4)form 4 plaza.pdf · uploaded 18 Aug 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Merge DOD Plaza.pdf · uploaded 15 Nov 2021View
  • Architect’s Certificate on Completion of Project (Form 4)PLAZA.pdf · uploaded 9 Dec 2022View

Promoter documents

  • Declaration Form BB Form.pdf · uploaded 14 Feb 2019View
  • Legal Title reportSearch Report.pdf · uploaded 14 Feb 2019View

Technical documents

  • Building Plan ApprovalBuilding Plan.pdfView
  • Layout ApprovalLayout.pdfView

Proforma allotment letter

  • Proforma allotment letterDraft Agreement.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Jalna (M Cl), Jalna taluka

Survey, CTS, gat or plot numbers

16779

As published on MahaRERA's project page

16779

Boundaries

North
Survey no 431
South
Road
East
Survey No 430
West
Survey no 431

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHemant Rajmane—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology