Bramhapuri Residency

Lapsed

Jalna (M Cl), Jalna 431203 |Promoter: Utkarsh Constructions Aop

Residential / Group HousingRERAP51400012471
1 Sep 2017Registered with MahaRERA
8 Mar 2023Promised completion
6Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
6
Land area for this project
2,719 sq m (29,266 sq ft)
Permissible built-up area
2,772 sq m (29,834 sq ft)
Sanctioned built-up area
2,772 sq m (29,834 sq ft)
Recreational open space
400 sq m (4,306 sq ft)
Address
15802, Jalna, JalnaPIN 431203
Litigation declared by promoter
Yes
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.83055, 73.28464
Bramhapuri Residency is at latitude 18.83055, longitude 73.28464.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 8 Mar 2023

The latest completion date on record passed 3 years and 7 months ago.

Registered
1 Sep 2017
Promised
8 Mar 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P514000124711 Sep 20178 Mar 2023—Utkarsh Constructions AopProject page

6 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building A2—
Building B2—
Building C2—
Building D2—
Building E2—
Building F5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Building AClosed/Covered00000
Building AOpen Space00000
Building BClosed/Covered00000
Building BOpen Space00000
Building CClosed/Covered00000
Building COpen Space00000
Building DClosed/Covered00000
Building DOpen Space00000
Building EClosed/Covered00000
Building EOpen Space00000
Building FClosed/Covered00001
Building FOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building A

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building D

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Building E

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Building F

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises60%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Common areas and amenities

  • Internal Roads & FootpathsNo footpaths80%
  • Water Supplylayout water supply work started60%
  • Sewerage (Chamber, Lines, Septic Tank , STP)layout chamber and lines done5%
  • Storm Water DrainsNo STPNot applicable
  • Landscaping & Tree Planting5%
  • Street Lightingwill be done in the end.60%
  • Community Buildingsremaining will be done in the endNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting0%
  • Energy managemcntwill be done in the end.Not applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open Space0%
  • Open Parkingwill be done in the end.Not applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

12 documents held by Deedo, 16 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Building Plan Approval (IOD)Building plan.pdf · uploaded 24 Jul 2017View
  • Building Plan Approval (IOD)Flats plan.pdf · uploaded 24 Jul 2017View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 24 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 24 Jul 2017View
  • Details of encumbrancesencumbrances.pdf · uploaded 28 Jul 2017View
  • Declaration in FORM BForm B.pdf · uploaded 28 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate-Priyanka.PDF · uploaded 30 Jul 2017View
  • Copy of the legal title reportleagle report.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letter789.pdf · uploaded 4 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer certificate rera.pdf · uploaded 6 Aug 2017View

Promoter documents

  • Declaration Form BForm B.pdf · uploaded 28 Jul 2017View
  • Legal Title reportleagle report.pdf · uploaded 31 Jul 2017View

Technical documents

  • Building Plan ApprovalBuilding plan.pdfView
  • Building Plan ApprovalFlats plan.pdfView
  • Layout ApprovalLayout.pdfView

Proforma allotment letter

  • Proforma allotment letter789.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Jalna (M Cl), Jalna taluka

Survey, CTS, gat or plot numbers

15802

As published on MahaRERA's project page

15802

Boundaries

North
Layout Open Space
South
9 Mtr Wide Internal Road
East
Survey No 282 Part
West
9 Mtr Wide Internal Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPriyanka Agrawal Modi—
OtherKaransing Rajput—

Source: MahaRERA project page. Contact details are not shown.