Sara Venkatesh F Type Building

Completed

Wadgaon Kolhati (Ct), Aurangabad 431136 |Promoter: Sara Towers Pvt Ltd

Residential / Group HousingRERAP51500032237
15 Dec 2021Registered with MahaRERA
31 Mar 2023Promised completion
30 Mar 2024Revised completionPushed back 1 year
1Building
66Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
1BHK, 2BHK, Shop66 units in all
Land area for this project
1,125 sq m (12,109 sq ft)
Permissible built-up area
3,722 sq m (40,063 sq ft)
Sanctioned built-up area
3,222 sq m (34,681 sq ft)
Address
52/1, Near Sara Sangam, Bajaj NagarPIN 431136
Designated bank account
The Shamrao Vithal Cooperative Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.84726, 75.23187
Sara Venkatesh F Type Building is at latitude 19.84726, longitude 75.23187.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 2 years and 7 months ago.

Registered
15 Dec 2021
Promised
31 Mar 2023
Revised
30 Mar 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150003223715 Dec 202131 Mar 202330 Mar 2024Sara Towers Pvt LtdProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
F Type Building866

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

66 units registered

1BHK · 28 units2BHK · 28 unitsShop · 10 units
TypeCarpet areaUnits
1BHK34.32 sq m · 369 sq ft14
1BHK34.74 sq m · 374 sq ft14
2BHK43.55 sq m · 469 sq ft7
2BHK43.98 sq m · 473 sq ft7
2BHK45.64 sq m · 491 sq ft7
2BHK48.63 sq m · 523 sq ft7
Shop8.66 sq m · 93 sq ft1
Shop10 sq m · 108 sq ft1
Shop15.52 sq m · 167 sq ft1
Shop15.84 sq m · 171 sq ft1
Shop16.1 sq m · 173 sq ft2
Shop16.17 sq m · 174 sq ft1
Shop16.31 sq m · 176 sq ft1
Shop24.37 sq m · 262 sq ft2

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

F Type Building

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
  • Sanitary Fittings within the flats / premises80%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL AND CIDCO0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK0%
  • Storm Water DrainsAS PER CONSULTANT0%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingAS PER CONSULTANT0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER CONSULTANT0%
  • Energy managemcntLED LIGHTS IN COMMON AREAS0%
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER CONSULTANT0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PER SANCTION DRAWING0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

23 documents held by Deedo, 27 filings listed on MahaRERA's project page

Others

Registration certificate

Extension certificate

Document library

  • Declaration in FORM Bsara venkatesh Ftype Bldg Form B.pdf · uploaded 18 Nov 2021View
  • Proforma of Allotment letterVenkatesh 2 Proforma of the allotment letter and agreement for sale.pdf · uploaded 23 Nov 2021View
  • Details of encumbrancesvenk f type encumbrance letter.pdf · uploaded 29 Nov 2021View
  • CERSAI detailsCersai Report.pdf · uploaded 30 Nov 2021View
  • Copy of Layout Approval (in case of layout)Venk-F - LAYOUT_compressed.pdf · uploaded 30 Nov 2021View
  • Building Plan Approval / NA Order for plotted developmentVenk-F - BLDG_compressed.pdf · uploaded 30 Nov 2021View
  • Commencement Certificates / NA Order for plotted developmentVenk-F - Commencement Letter_compressed.pdf · uploaded 30 Nov 2021View
  • Declaration about Commencement CertificateVenk-F - Declaration of Commencement.pdf · uploaded 30 Nov 2021View
  • Copy of the legal title reportlegal report venk Ftype.pdf · uploaded 8 Dec 2021View
  • Proforma of Allotment letterSTD-ATS-FLAT-52-1(P).pdf · uploaded 9 Jun 2022View
  • Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 11 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 21-22 SARA VENKATESH .pdf · uploaded 11 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCH SARA VENKATESH.pdf · uploaded 11 Apr 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SARA VENKATESH.pdf · uploaded 11 Apr 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2 A SARA VENKATESH.pdf · uploaded 11 Apr 2023View
  • Proforma of Agreement for saleATS.pdf · uploaded 11 Apr 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2 A SARA VENKATESH.pdf · uploaded 11 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51500032337 Sara Towers Sara Venkatesh F Type.pdf · uploaded 12 Oct 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)From 2A Vemkatesh 22-23.pdf · uploaded 21 Oct 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentSara Venkatesh F Type Occupancy certificate_.pdf · uploaded 5 Nov 2024View
  • Architect’s Certificate on Completion of Project (Form 4)Form-4 Venkatesh F Type.pdf · uploaded 21 Nov 2024View
  • Architect’s Certificate on Completion of Project (Form 4)Form-4 Venkatesh F Type.pdf · uploaded 21 Nov 2024View

Promoter documents

  • Declaration Form Bsara venkatesh Ftype Bldg Form B.pdf · uploaded 18 Nov 2021View
  • Legal Title reportlegal report venk Ftype.pdf · uploaded 8 Dec 2021View

Technical documents

  • Layout ApprovalVenk-F - LAYOUT_compressed.pdfView
  • Building Plan ApprovalVenk-F - BLDG_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterVenkatesh 2 Proforma of the allotment letter and agreement for sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Wadgaon Kolhati (CT), Aurangabad taluka

Survey, CTS, gat or plot numbers

52/1

As published on MahaRERA's project page

52/1

Boundaries

North
Sara Venkatesh A Type Building
South
18 Mtr Wide Road
East
18 Mtr Wide Road
West
Cidco Plot

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAmol Ambadas Kshirsagar—
Chartered accountantYogesh J Agrawal—
EngineerHarish Bharuka—
OtherNamdev G Karkhane—
OtherOm Sai Krupa Construction—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology