Sara Swarajya Phase-I

Active

Wadgaon Kolhati (Ct), Aurangabad 431136 |Promoter: Sara Infrastructures

Residential / Group HousingRERAP51500077523
20 Aug 2024Registered with MahaRERA
31 Dec 2030Promised completion
6Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
6
Land area for this project
4,894 sq m (52,678 sq ft)
Permissible built-up area
18,039 sq m (1,94,172 sq ft)
Sanctioned built-up area
13,145 sq m (1,41,494 sq ft)
Planning authority
CIDCO Waluj Mahanagar
Address
Plot No 1 Gut No 57 Part Village Wadgaon (K) Nagar-I Tq And Dist Chhatrapati Sambhaji Nagar, Wadgaon Kolhati Nagar 1, Wadgaon Kolhati Nagar 1PIN 431136
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.85080, 75.23277
Sara Swarajya Phase-I is at latitude 19.85080, longitude 75.23277.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2030

Registered
20 Aug 2024
Promised
31 Dec 2030

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150007752320 Aug 202431 Dec 2030—Sara InfrastructuresProject page

6 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Pratapgad C Type BuildingClosed/Covered000010
Pratapgad C Type BuildingOpen Space000067
Raigad A Type BuildingClosed/Covered000014
Raigad A Type BuildingOpen Space000055
Rajgad B Type BuildingClosed/Covered000014
Rajgad B Type BuildingOpen Space000055
Sinhagad C Type BuildingClosed/Covered000014
Sinhagad C Type BuildingOpen Space000069
Vishalgad C Type BuildingClosed/Covered000014
Vishalgad C Type BuildingOpen Space000055

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Pratapgad C Type Building

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure40%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Raigad A Type Building

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Rajgad B Type Building

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure80%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Show all 6 buildings and common areasShow fewer buildings and common areas

Sinhagad C Type Building

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure50%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Vishalgad C Type Building

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsINTERNAL PROJECT CEMENT OR TAR ROAD25%
  • Water SupplyFROM BORE-WELL20%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingINTERNAL PROJECT TREE PLANTATION0%
  • Street LightingINTERNAL PROJECT STREET LIGHTING0%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING AS PER NORMS0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAS PER FIRE NORMS0%
  • Electrical meter room, sub-station, receiving stationAS PER MSEB NORMS0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

56 documents held by Deedo, 61 filings listed on MahaRERA's project page

Other (26)

Show all 117 documentsShow fewer documents

Other (26)

Title report

Commencement certificate (2)

Encumbrance details

Form B

Form 1 (10)

Form 2 (8)

Allotment letter (2)

Registration certificate

Layout plan

Building plan (3)

Document library

  • Copy of the legal title reportSearch Report.pdf · uploaded 20 Jul 2024View
  • Copy of Layout Approval (in case of layout)Sanction Plan 1.pdf · uploaded 20 Jul 2024View
  • Building Plan Approval / NA Order for plotted developmentSanction Plan 1.pdf · uploaded 20 Jul 2024View
  • Building Plan Approval / NA Order for plotted developmentSanction Plan 2.pdf · uploaded 20 Jul 2024View
  • Building Plan Approval / NA Order for plotted developmentSanction Plan 3.pdf · uploaded 20 Jul 2024View
  • Building Plan Approval / NA Order for plotted developmentSanction Plan 4.pdf · uploaded 20 Jul 2024View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate .pdf · uploaded 20 Jul 2024View
  • Declaration about Commencement CertificateFORMAT - D.pdf · uploaded 22 Jul 2024View
  • Declaration in FORM BFORM - B.pdf · uploaded 22 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 22 Jul 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 22 Jul 2024View
  • CERSAI detailsCERSAI Declaration.pdf · uploaded 22 Jul 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsDISC OF INNTEREST - Mr NILESH.pdf · uploaded 22 Jul 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsDISC OF INTEREST - Mr SITARAM.pdf · uploaded 22 Jul 2024View
  • Proforma of Agreement for saleATS Draft RERA.pdf · uploaded 22 Jul 2024View
  • Proforma of Allotment letterUPDATED MODEL FORM OF ALLOTT LETTER.pdf · uploaded 22 Jul 2024View
  • Declaration about all RERA Designated Bank Accounts (Format A)SARA SWARAJYA FORMAT-A.pdf · uploaded 22 Jul 2024View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Sara Swarajya Format- B.pdf · uploaded 22 Jul 2024View
  • Deviation Report with respect to Allotment letterNO DEVIAT - ALLOT LETTER.pdf · uploaded 22 Jul 2024View
  • Deviation Report with respect to model copy of AgreementNO DEVIAT - AGREE TO SALE.pdf · uploaded 22 Jul 2024View
  • Other – LegalDevelopment Agreement_Compressed.pdf · uploaded 22 Jul 2024View
  • a Details of encumbrances concerned to FinanceSara Swarajya Phase-1 Financial Encumbrances 20-Jul-24.pdf · uploaded 22 Jul 2024View
  • b Details of encumbrances concerned to LegalSara Swarajya Phase-1 Financial Encumbrances 20-Jul-24.pdf · uploaded 22 Jul 2024View
  • Disclosure for secured/unsecured finance availed for the projectSara Swarajya Phase-1 Disclosure of Secured 19-Jul-24.pdf · uploaded 22 Jul 2024View
  • Other – TechnicalSara Swarajya Phase-1 ANNEXURE'A'_page-0001.pdf · uploaded 2 Aug 2024View
  • Other – TechnicalCC CVERIFICATION.pdf · uploaded 2 Aug 2024View
  • Other – FinanceSELF DECLARATION - DA.pdf · uploaded 13 Aug 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)From 1 Sara Swarajya _ Sept-24.pdf · uploaded 24 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sara Swarajya _ Sept-24.pdf · uploaded 24 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Sara Swarajya P1 Form-2 19-01-24.pdf · uploaded 27 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Sara Swarajya P1 Form-2 19-01-24.pdf · uploaded 27 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Sara Swarajya P1 Form-1 19-01-25.pdf · uploaded 27 Jan 2025View
  • Disclosure of sold/ booked inventorySara Swarajya Ph1 _ Sold Unsold.pdf · uploaded 28 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SWARAJYA PH_1.pdf · uploaded 24 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SWARAJYA PH_1.pdf · uploaded 24 Apr 2025View
  • Proforma of Agreement for saleATS Sara Swarjya.pdf · uploaded 24 Apr 2025View
  • Form 1Form-1 June 25.pdf · uploaded 5 Sep 2025View
  • Form 2Form-2 June 25.pdf · uploaded 5 Sep 2025View
  • Disclosure of Sold and Booked InventorySold June 25.pdf · uploaded 5 Sep 2025View
  • Form 11 Form 1 Swarajya Ph-1 Sep 25.pdf · uploaded 7 May 2026View
  • Form 22 Form 2 Swarajya Ph-1 Sep 25.pdf · uploaded 7 May 2026View
  • Disclosure of Sold and Booked Inventory4 Sold Swarajya Ph-1 Sep 25.pdf · uploaded 7 May 2026View
  • Form 1Form 1 _ Sara Swarajya Ph-1.pdf · uploaded 7 May 2026View
  • Form 2Form 2 _ Sara Swarajya Ph-1.pdf · uploaded 7 May 2026View
  • Disclosure of Sold and Booked InventoryDiscloser_Sara Swarajya Ph-1.pdf · uploaded 7 May 2026View
  • Form 1Form-1 Mar 26.pdf · uploaded 1 Jun 2026View
  • Form 2Form-2 Mar 26.pdf · uploaded 1 Jun 2026View
  • Disclosure of Sold and Booked InventorySold Mar 26.pdf · uploaded 1 Jun 2026View
  • Form 1FORM-1 JUN 26.pdf · uploaded 20 Jul 2026View
  • Form 2FORM-2 JUN 26.pdf · uploaded 20 Jul 2026View
  • Disclosure of Sold and Booked InventorySOLD JUN 26.pdf · uploaded 20 Jul 2026View

Promoter documents

  • Legal Title reportSearch Report.pdf · uploaded 20 Jul 2024View
  • Declaration Form BFORM - B.pdf · uploaded 22 Jul 2024View

Technical documents

  • Layout ApprovalSanction Plan 1.pdfView
  • Building Plan ApprovalSanction Plan 1.pdfView
  • Building Plan ApprovalSanction Plan 2.pdfView
  • Building Plan ApprovalSanction Plan 3.pdfView
  • Building Plan ApprovalSanction Plan 4.pdfView

Other legal documents

  • Other – LegalDevelopment Agreement_Compressed.pdfView

Financial documents

  • Other – FinanceSELF DECLARATION - DA.pdf · uploaded 13 Aug 2024View

Proforma allotment letter

  • Proforma allotment letterUPDATED MODEL FORM OF ALLOTT LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Wadgaon Kolhati (CT), Aurangabad taluka

Survey, CTS, gat or plot numbers

PLOT NO 1 GUT NO 57 PART

As published on MahaRERA's project page

PLOT NO 1 GUT NO 57 PART VILLAGE WADGAON (K) NAGAR-I TQ AND DIST CHHATRAPATI SAMBHAJI NAGAR

Boundaries

North
Land In No Urbaniszation Zone Of Mr Rajiv Singal
South
12 Meter Wide Road
East
Open Space And 9 Meter Wide Road
West
Land From Gut No 57

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAmol Kshirsagar—
Chartered accountantSd Agrawal And Associates—
EngineerAmol Kshirsagar—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology