Sara Sangam Phase 1

Completed

Wadgaon Kolhati (Ct), Aurangabad 431136 |Promoter: Jagrut Sara Associates

Residential / Group HousingRERAP51500016384
10 May 2018Registered with MahaRERA
30 Dec 2021Promised completion
5Buildings
247Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
5
Unit types
1 BHK FLAT, 2 BHK FLAT, Shop247 units in all
Land area for this project
5,490 sq m (59,091 sq ft)
Permissible built-up area
9,704 sq m (1,04,449 sq ft)
Sanctioned built-up area
9,704 sq m (1,04,449 sq ft)
Address
Plot No. 2, Gut No. 49 P, Waluj, Bajaj NagarPIN 431136
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.15065, 79.12945
Sara Sangam Phase 1 is at latitude 21.15065, longitude 79.12945.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2021

The latest completion date on record passed 4 years and 10 months ago.

Registered
10 May 2018
Promised
30 Dec 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150001638410 May 201830 Dec 2021—Jagrut Sara AssociatesProject page

5 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Bhima Wing 12 To 14942
Chandrabhaga Wing 6 To 8942
Godavari Wing 15 To 181079
Indrayani Wing 3 To 5942
Tapi Wing 9 To 11942

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

247 units registered

1 BHK FLAT · 168 units2 BHK FLAT · 56 unitsShop · 23 units
BuildingTypeCarpet areaUnits
Bhima Wing 12 To 141 BHK FLAT29.33 sq m · 316 sq ft1
Bhima Wing 12 To 141 BHK FLAT29.37 sq m · 316 sq ft3
Bhima Wing 12 To 141 BHK FLAT29.52 sq m · 318 sq ft2
Bhima Wing 12 To 141 BHK FLAT29.83 sq m · 321 sq ft6
Bhima Wing 12 To 141 BHK FLAT29.84 sq m · 321 sq ft12
Bhima Wing 12 To 141 BHK FLAT29.94 sq m · 322 sq ft18
Chandrabhaga Wing 6 To 81 BHK FLAT29.52 sq m · 318 sq ft6
Chandrabhaga Wing 6 To 81 BHK FLAT29.9 sq m · 322 sq ft36
Godavari Wing 15 To 182 BHK FLAT48.48 sq m · 522 sq ft56
Godavari Wing 15 To 18Shop8.75 sq m · 94 sq ft6
Godavari Wing 15 To 18Shop8.95 sq m · 96 sq ft2
Godavari Wing 15 To 18Shop11.73 sq m · 126 sq ft4
Godavari Wing 15 To 18Shop12.05 sq m · 130 sq ft2
Godavari Wing 15 To 18Shop12.25 sq m · 132 sq ft4
Godavari Wing 15 To 18Shop14.8 sq m · 159 sq ft3
Godavari Wing 15 To 18Shop19.95 sq m · 215 sq ft2
Indrayani Wing 3 To 51 BHK FLAT29.52 sq m · 318 sq ft6
Indrayani Wing 3 To 51 BHK FLAT29.9 sq m · 322 sq ft36
Tapi Wing 9 To 111 BHK FLAT29.33 sq m · 316 sq ft1
Tapi Wing 9 To 111 BHK FLAT29.37 sq m · 316 sq ft3
Tapi Wing 9 To 111 BHK FLAT29.52 sq m · 318 sq ft2
Tapi Wing 9 To 111 BHK FLAT29.83 sq m · 321 sq ft6
Tapi Wing 9 To 111 BHK FLAT29.84 sq m · 321 sq ft12
Tapi Wing 9 To 111 BHK FLAT29.94 sq m · 322 sq ft18

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Bhima Wing 12 To 14Closed/Covered000011
Bhima Wing 12 To 14Open Space00000
Chandrabhaga Wing 6 To 8Closed/Covered000011
Chandrabhaga Wing 6 To 8Open Space00000
Godavari Wing 15 To 18Closed/Covered000028
Godavari Wing 15 To 18Open Space00000
Indrayani Wing 3 To 5Closed/Covered000011
Indrayani Wing 3 To 5Open Space00000
Tapi Wing 9 To 11Closed/Covered000011
Tapi Wing 9 To 11Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Bhima Wing 12 To 14

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Chandrabhaga Wing 6 To 8

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Godavari Wing 15 To 18

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Indrayani Wing 3 To 5

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Tapi Wing 9 To 11

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsTRIMIX ROAD100%
  • Internal Roads & FootpathsTRIMIX ROAD100%
  • Water SupplyBORE WELL OR CIDCO100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsAS PER CONSULTANT100%
  • Landscaping & Tree PlantingAS PER CONSULTANT100%
  • Street LightingAS PER CONSULTANT100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER CONSULTANT100%
  • Energy managemcntLED LIGHTS100%
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER CONSULTANT100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

34 documents held by Deedo, 46 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Details of encumbrancesindex 2.pdf · uploaded 28 Apr 2018View
  • Declaration in FORM Bform b.pdf · uploaded 28 Apr 2018View
  • Commencement Certificates / NA Order for plotted developmentcommencement certificates.pdf · uploaded 28 Apr 2018View
  • Commencement Certificates / NA Order for plotted developmentLayout permission letter.pdf · uploaded 28 Apr 2018View
  • Building Plan Approval (IOD)building plan 1.pdf · uploaded 28 Apr 2018View
  • Building Plan Approval (IOD)building plan 2.pdf · uploaded 28 Apr 2018View
  • Building Plan Approval (IOD)building plan 3.pdf · uploaded 28 Apr 2018View
  • Building Plan Approval (IOD)building plan 4.pdf · uploaded 28 Apr 2018View
  • Building Plan Approval (IOD)building plan 5.pdf · uploaded 28 Apr 2018View
  • Copy of Layout Approval (in case of layout)Lay-out parmision.pdf · uploaded 28 Apr 2018View
  • Copy of Layout Approval (in case of layout)building layout.pdf · uploaded 28 Apr 2018View
  • Proforma of Allotment letterallotment letter.pdf · uploaded 29 Apr 2018View
  • Copy of the legal title reportTitle Report.pdf · uploaded 7 May 2018View
  • Proforma of Allotment letterATS - Sara Sangam-Phase-1.pdf · uploaded 7 May 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 - ENGINEER CERTIFICATE.pdf · uploaded 16 Nov 2018View
  • Certificates of CA (Form 5)FORM 5 - SARA SANGAM.pdf · uploaded 16 Nov 2018View
  • Declaration about Commencement CertificateDeclaration of CC - Sangam Ph 1.pdf · uploaded 30 Jul 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A - Sangam Ph 1_compressed.pdf · uploaded 30 Jul 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoccupancy Bhima,chandra,goda.pdf · uploaded 30 Jul 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoccupancy Tapi,Indra.pdf · uploaded 30 Jul 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 Godavari Bhima Chandrabhaga Building .pdf · uploaded 17 Jun 2022View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 Tapi Indryani Building .pdf · uploaded 17 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate Bhima Chandrabhaga Godawari Building.pdf · uploaded 17 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentBhima Building Plan .pdf · uploaded 17 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentChandarabhaga Building Plan.pdf · uploaded 17 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentGodawari Building 1 Plan.pdf · uploaded 17 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentGodawari Building 2 Plan.pdf · uploaded 17 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentIndrayani Building Plan .pdf · uploaded 17 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentlay out Plan.pdf · uploaded 17 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentLay-out .pdf · uploaded 17 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentTapi Building Plan.pdf · uploaded 17 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate Indrayani Tapi Building .pdf · uploaded 17 Jun 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Ca Certificate.pdf · uploaded 17 Jun 2022View
  • Certificates of CA (Form 5)Form 5 Ca Certificate.pdf · uploaded 17 Jun 2022View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Society.pdf · uploaded 18 Dec 2022View
  • Status of Conveyancedod Sara Sangam Phase I -3-37_compressed.pdf · uploaded 18 Dec 2022View

Promoter documents

  • Declaration Form Bform b.pdf · uploaded 28 Apr 2018View
  • Legal Title reportTitle Report.pdf · uploaded 7 May 2018View

Technical documents

  • Building Plan Approvalbuilding plan 1.pdfView
  • Building Plan Approvalbuilding plan 2.pdfView
  • Building Plan Approvalbuilding plan 3.pdfView
  • Building Plan Approvalbuilding plan 4.pdfView
  • Building Plan Approvalbuilding plan 5.pdfView
  • Layout ApprovalLay-out parmision.pdfView
  • Layout Approvalbuilding layout.pdfView

Proforma allotment letter

  • Proforma allotment letterATS - Sara Sangam-Phase-1.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Wadgaon Kolhati (CT), Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO. 49 PPLOT NO. 2

As published on MahaRERA's project page

PLOT NO. 2, GUT NO. 49 P

Boundaries

North
Other Property
South
18 Mtr Wide Road
East
18 Mtr Wide Road
West
Area Under Dispensary And Library And Sf

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAnand Deshpande—
EngineerNamdev Karkhane—
OtherAbhijeet Zalte—
OtherAmol Kshirsagar—

Source: MahaRERA project page. Contact details are not shown.