Silver Park

Completed

Wadgaon Kh., Aurangabad 431136 |Promoter: Sudesh Ranchoddas Vaishnav

Residential / Group HousingRERAP51500006425
14 Aug 2017Registered with MahaRERA
31 Jul 2018Promised completion
1Building
14Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Resi cum commer14 units in all
Land area for this project
431 sq m (4,640 sq ft)
Permissible built-up area
1 sq m (11 sq ft)
Sanctioned built-up area
1 sq m (11 sq ft)
Address
PLOT NO 3, GUT NO 52/1, WADGAON, KOLHATI, CIDCO, WALUJ, AURANGABAD, Wadgaon MIDC Road, Near Sai MandirPIN 431136
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.50196, 73.93302
Silver Park is at latitude 18.50196, longitude 73.93302.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Jul 2018

The latest completion date on record passed 8 years and 3 months ago.

Registered
14 Aug 2017
Promised
31 Jul 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150000642514 Aug 201731 Jul 2018—Sudesh Ranchoddas VaishnavProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shaunak C Type Building514

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

14 units registered

Resi cum commer · 14 units
TypeCarpet areaUnits
Resi cum commer342.25 sq m · 3,684 sq ft14

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shaunak C Type Building

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsONLY PAVED SURFACE / CONCRETE NO FOOTPATH100%
  • Water SupplyCIDCO WATER SUPPLY / BORE WELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)CHAMBER DRAINAGE LINES SEPTIC TANK NO STP100%
  • Storm Water Drainsdrainage linesNot applicable
  • Landscaping & Tree PlantingAS PER DRAWING/ DETAILS ONTAINED FROM CONSULTANT100%
  • Street LightingAS PER DRAWING/ DETAILS ONTAINED FROM CONSULTANT100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsAs per drawingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAs per drawingsNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER DRAWING/ DETAILS ONTAINED FROM CONSULTANT100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAs per drawingsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

33 documents held by Deedo, 39 filings listed on MahaRERA's project page

Title report

Encumbrance details (2)

Commencement certificate (2)

Form B

Form 1 (4)

Show all 72 documentsShow fewer documents

Form 1 (4)

Form 2 (4)

Allotment letter (2)

Registration certificate

Occupancy / completion certificate

  • Occupancy / completion certificate1 May 2023ViewSource

Form 4 (2)

Other (4)

Form 2A (2)

Form 5 (5)

Layout plan

Building plan

Document library

  • Copy of the legal title reportSEARCH-CUM-TITLE REPORT(DEVANSHI).pdf · uploaded 30 Jul 2017View
  • Details of encumbrancesencumbrances (devanshi).pdf · uploaded 30 Jul 2017View
  • Copy of Layout Approval (in case of layout)LAY OUT PDF.pdf · uploaded 30 Jul 2017View
  • Declaration in FORM Baffidait cum declaration (devanshi).pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterA G R E E M E N T T O A S S I G N M E N T - devanshi sample.pdf · uploaded 30 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architechs certificate sign (devanshi).pdf · uploaded 30 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engg cert devanshi.PDF · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)c type plan.pdf · uploaded 30 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentBULDING PERMISSION (DEVANSHI).pdf · uploaded 30 Jul 2017View
  • Othercurraction ceed.PDF · uploaded 30 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EN CR Q1.pdf · uploaded 31 Mar 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EN CR 31 DEC 2017.pdf · uploaded 31 Mar 2018View
  • Otherdevanshi occupancy cr.pdf · uploaded 31 Mar 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCT CERT DEVA Q2.PDF · uploaded 1 May 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCT CERT DEVA Q3.PDF · uploaded 1 May 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCT CERT DEVA Q4.PDF · uploaded 1 May 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG CERT DEVA Q4.PDF · uploaded 1 May 2023View
  • Proforma of Agreement for sale1 Proforma of Allotment letter DEVA.pdf · uploaded 1 May 2023View
  • Architect’s Certificate on Completion of Project (Form 4)ARCH COMP CERT DEVA.PDF · uploaded 1 May 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOCCUPANCY DEVA.PDF · uploaded 1 May 2023View
  • Proforma of Allotment letterpossition deva.PDF · uploaded 1 May 2023View
  • Declaration about Commencement CertificateDECLARATION COMMEN CERTI.PDF · uploaded 1 May 2023View
  • Status of Formation of Legal Entity (Society/Co Op etc.)SOCIETY CERT DEVA.PDF · uploaded 2 May 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeperate Bank Acc Deva.PDF · uploaded 2 May 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)ER CERT NILESH 18 DEVA.PDF · uploaded 6 May 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)ER CERT NILESH 19 DEVA.PDF · uploaded 6 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Form 5 2018.pdf · uploaded 8 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 2019.pdf · uploaded 8 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 2020.pdf · uploaded 8 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 2021.pdf · uploaded 8 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 2022.pdf · uploaded 8 May 2023View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 Devanshi Builders.pdf · uploaded 1 Jun 2023View

Promoter documents

  • Legal Title reportSEARCH-CUM-TITLE REPORT(DEVANSHI).pdf · uploaded 30 Jul 2017View
  • Declaration Form Baffidait cum declaration (devanshi).pdf · uploaded 30 Jul 2017View

Technical documents

  • Building Plan Approvalc type plan.pdfView
  • Layout ApprovalLAY OUT PDF.pdfView

Other legal documents

  • Othercurraction ceed.PDFView
  • Otherdevanshi occupancy cr.pdfView

Proforma allotment letter

  • Proforma allotment letterpossition deva.PDFView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Wadgaon Kh., Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO 52/1PLOT NO 3

As published on MahaRERA's project page

PLOT NO 3, GUT NO 52/1, WADGAON, KOLHATI, CIDCO, WALUJ, AURANGABAD

Boundaries

North
18 Mt Cidco Road
South
Gut No 47
East
Plot No 2
West
Plot No 4

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectR S Jadhav—
EngineerAbhay S Patil—

Source: MahaRERA project page. Contact details are not shown.