Sara Sahyadri Park

Active

Vaijapur (M Cl), Aurangabad 432701 |Promoter: Sara Landmarks

Residential / Group HousingRERAP51500033910
14 Mar 2022Registered with MahaRERA
31 Dec 2025Promised completion
13Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
13
Land area for this project
7,476 sq m (80,471 sq ft)
Permissible built-up area
7,716 sq m (83,054 sq ft)
Sanctioned built-up area
7,716 sq m (83,054 sq ft)
Planning authority
Town Planning And Valuation Department, Aurangabad
Address
197p, Shirdi Highway, Near Gangapur PhataPIN 432701
Designated bank account
The Shamrao Vithal Cooperative Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.91112, 74.73504
Sara Sahyadri Park is at latitude 19.91112, longitude 74.73504.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2025

The latest completion date on record passed 10 months ago.

Registered
14 Mar 2022
Promised
31 Dec 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150003391014 Mar 202231 Dec 2025—Sara LandmarksProject page

13 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Rh No 104 To 1102—
Rh No 111 To 1202—
Rh No 13 To 182—
Rh No 19 To 252—
Rh No 1 To 122—
Rh No 26 To 372—
Rh No 38 To 492—
Rh No 50 To 582—
Rh No 59 To 682—
Rh No 69 To 802—
Rh No 81 To 902—
Rh No 91 To 972—
Rh No 98 To 1032—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Rh No 104 To 110Closed/Covered00000
Rh No 104 To 110Open Space00000
Rh No 111 To 120Closed/Covered00000
Rh No 111 To 120Open Space00000
Rh No 13 To 18Closed/Covered00000
Rh No 13 To 18Open Space00000
Rh No 19 To 25Closed/Covered00000
Rh No 19 To 25Open Space00000
Rh No 1 To 12Closed/Covered00000
Rh No 1 To 12Open Space00000
Rh No 26 To 37Closed/Covered00000
Rh No 26 To 37Open Space00000
Rh No 38 To 49Closed/Covered00000
Rh No 38 To 49Open Space00000
Rh No 50 To 58Closed/Covered00000
Rh No 50 To 58Open Space00000
Rh No 59 To 68Closed/Covered00000
Rh No 59 To 68Open Space00000
Rh No 69 To 80Closed/Covered00000
Rh No 69 To 80Open Space00000
Rh No 81 To 90Closed/Covered00000
Rh No 81 To 90Open Space00000
Rh No 91 To 97Closed/Covered00000
Rh No 91 To 97Open Space00000
Rh No 98 To 103Closed/Covered00000
Rh No 98 To 103Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Rh No 104 To 110

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 111 To 120

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 13 To 18

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Rh No 19 To 25

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Rh No 1 To 12

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Rh No 26 To 37

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Rh No 38 To 49

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 50 To 58

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
  • Sanitary Fittings within the flats / premises80%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Rh No 59 To 68

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
  • Sanitary Fittings within the flats / premises50%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Rh No 69 To 80

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 81 To 90

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 91 To 97

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 98 To 103

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsTRIMIX ROAD100%
  • Water SupplyOPEN WELL AND BOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)COMMON SEPTIC TANK100%
  • Storm Water DrainsAS PER CONSULTANT100%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingLED LIGHTS100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER CONSULTANT100%
  • Energy managemcntLED LIGHTS FOR STREET LIGHTS100%
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

67 documents held by Deedo, 72 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportSearch Report_compressed.pdf · uploaded 7 Mar 2022View
  • Details of encumbrancesencumbrance sahyadri park.pdf · uploaded 7 Mar 2022View
  • Copy of Layout Approval (in case of layout)Layout Plan Approval_compressed.pdf · uploaded 7 Mar 2022View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan Approval_compressed.pdf · uploaded 7 Mar 2022View
  • Commencement Certificates / NA Order for plotted developmentPermission Latter.pdf · uploaded 7 Mar 2022View
  • Declaration in FORM BForm B sahyadri park.pdf · uploaded 7 Mar 2022View
  • Proforma of Allotment letterallotment letter sahyadri park.pdf · uploaded 7 Mar 2022View
  • Proforma of Allotment letter2 Proforma of the allotment letter and agreement for sale.pdf · uploaded 7 Mar 2022View
  • CERSAI detailsCERSAI_Search_Report_ SAHYADRI PARK.pdf · uploaded 8 Mar 2022View
  • Declaration about Commencement CertificateSahyadri Park - Declaration of CC.pdf · uploaded 9 Mar 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51500033910 sara Sahyandri Park.pdf · uploaded 16 Oct 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Sahyadri park 21-22.pdf · uploaded 21 Oct 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Samrudhi Ph-22-23.pdf · uploaded 21 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Form-1 Mar-22.pdf · uploaded 11 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Form-1 Jun-22.pdf · uploaded 11 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Form-1 Sep-22.pdf · uploaded 11 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)4 Form-1 Dec-22.pdf · uploaded 11 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)5 Form-1 Mar-23.pdf · uploaded 11 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)6 Form-1 Jun-23.pdf · uploaded 11 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)7 Form-1 Sep-23.pdf · uploaded 11 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Dec-23.pdf · uploaded 11 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Mar-24.pdf · uploaded 11 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Form -2 Mar-22.pdf · uploaded 11 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Form-2 Jun-22.pdf · uploaded 11 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Form-2 Sep-22.pdf · uploaded 11 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)4 form-2 Dec-22.pdf · uploaded 11 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)5 Form-2 Mar-23.pdf · uploaded 11 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Form-2 Jun-23.pdf · uploaded 11 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Form-2 Sep-23.pdf · uploaded 11 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)8 Form-2 Dec-23.pdf · uploaded 11 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)9 From-2 Mar-24.pdf · uploaded 11 Apr 2024View
  • Disclosure of sold/ booked inventory1 Sold Mar-22.pdf · uploaded 11 Apr 2024View
  • Disclosure of sold/ booked inventory2 Sold Jun-22.pdf · uploaded 11 Apr 2024View
  • Disclosure of sold/ booked inventory3 Sold Sep-22.pdf · uploaded 11 Apr 2024View
  • Disclosure of sold/ booked inventory4 Sold Dec-22.pdf · uploaded 11 Apr 2024View
  • Disclosure of sold/ booked inventory5 Sold Mar-23.pdf · uploaded 11 Apr 2024View
  • Disclosure of sold/ booked inventory6 Sold Jun-23.pdf · uploaded 11 Apr 2024View
  • Disclosure of sold/ booked inventory7 Sold Sep-23.pdf · uploaded 11 Apr 2024View
  • Disclosure of sold/ booked inventory8 Sold Dec-23.pdf · uploaded 11 Apr 2024View
  • Disclosure of sold/ booked inventory9 Sold Mar-24.pdf · uploaded 11 Apr 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)3 Sahyadri Park Form-2A (Mar-24).pdf · uploaded 16 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Sara Sahyadri Park Form-2 11-07-24.pdf · uploaded 6 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Sara Sahyadri Park Form-1 11-07-24_compressed.pdf · uploaded 6 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Sara Sahyadri Park Form-1 12-11-24_compressed.pdf · uploaded 6 Dec 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Sara Sahyadri Park Form-2 12-11-24.pdf · uploaded 6 Dec 2024View
  • Disclosure of sold/ booked inventorySara Sahyadri Park Sold 30-06-24.pdf · uploaded 12 Dec 2024View
  • Disclosure of sold/ booked inventorySara Sahyadri Park Sold 30-09-24.pdf · uploaded 12 Dec 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 33910 Sara Landmarks_Sara Sahyadri Park.pdf · uploaded 12 Dec 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A_ Sahyadri park.pdf · uploaded 19 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)sara sahyadri form 1.pdf · uploaded 28 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Sara Sahyadri Form2.pdf · uploaded 28 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 LANDMARK.pdf · uploaded 24 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 LANDMARK.pdf · uploaded 24 Apr 2025View
  • Form 1Form-1 June 25.pdf · uploaded 5 Sep 2025View
  • Form 2Form-2 June 25.pdf · uploaded 5 Sep 2025View
  • Disclosure of Sold and Booked InventoryPark Sold June 25.pdf · uploaded 5 Sep 2025View
  • Form 11 Form -1 Sep 25.pdf · uploaded 26 Dec 2025View
  • Form 22 Form -2 Sep 25.pdf · uploaded 26 Dec 2025View
  • Disclosure of Sold and Booked Inventory4 Sold Sep 25.pdf · uploaded 26 Dec 2025View
  • Withdrawal Update Form 1Form 1_Sara Sahyadri park.pdf · uploaded 31 Jan 2026View
  • Withdrawal Update Form 2Form 2 _Sara Sahyadri Park.pdf · uploaded 31 Jan 2026View
  • Withdrawal Update Form 1Form 1_Sara Sahyadri park.pdf · uploaded 31 Jan 2026View
  • Withdrawal Update Form 2Form 2 _Sara Sahyadri Park.pdf · uploaded 31 Jan 2026View
  • Form 5 (FY 2024-2025)FORM 5_Sara Landmarks_Sara Sahyadri Park.pdf · uploaded 13 Mar 2026View
  • Form 2A (FY 2024-2025)FORM -2A_SARA SAHYADRI.pdf · uploaded 14 Mar 2026View
  • Withdrawal Update Form 1Sara Landmark Form -1.pdf · uploaded 12 May 2026View
  • Withdrawal Update Form 2Sara Landmark Form -2.pdf · uploaded 12 May 2026View

Promoter documents

  • Legal Title reportSearch Report_compressed.pdf · uploaded 7 Mar 2022View
  • Declaration Form BForm B sahyadri park.pdf · uploaded 7 Mar 2022View

Technical documents

  • Layout ApprovalLayout Plan Approval_compressed.pdfView
  • Building Plan ApprovalBuilding Plan Approval_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterallotment letter sahyadri park.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Vaijapur (M Cl), Vaijapur taluka

Survey, CTS, gat or plot numbers

197P

As published on MahaRERA's project page

197P

Boundaries

North
Other Land
South
12 Mtr Wide Road
East
9 Mtr Wide Road
West
9 Mtr Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAmol A Kshirsagar—
Chartered accountantS D Agrawal & Associates—
Chartered accountantYogesh J Agrawal—
Chartered accountantYogesh J Agrawal & Co—
EngineerAmol Kshirsagar—
EngineerUjwal Sanap—
OtherFuture Builds—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology