Tisgaon, Aurangabad 431136 |Promoter: Sajansing Motilal Jarwal

6 Aug 2024Registered with MahaRERA
31 Dec 2026Promised completion
3Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Active
Buildings
3
Land area for this project
1,487 sq m (16,003 sq ft)
Permissible built-up area
3,320 sq m (35,738 sq ft)
Sanctioned built-up area
3,320 sq m (35,738 sq ft)
Planning authority
CIDCO
Address
Plot No 27 Gut No 152 (Part), CIDCO, Nagar 1PIN 431136
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.85766, 75.25586
Tirupati Vastu NX is at latitude 19.85766, longitude 75.25586.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2026

Registered
6 Aug 2024
Promised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000772926 Aug 202431 Dec 2026—Sajansing Motilal JarwalProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building A5—
Building B5—
Building C3—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Building AClosed/Covered470011
Building AOpen Space00000
Building BClosed/Covered2780035
Building BOpen Space00000
Building CClosed/Covered1540019
Building COpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building A

  • Excavation100%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor100%
  • Slabs of Super Structure10%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building B

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER CIDCO0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER PLAN0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAS PER PLAN0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • AS PER PLAN00%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

57 documents held by Deedo, 60 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportLegal title Report Tirupati Vastu NX.pdf · uploaded 30 Apr 2024View
  • Copy of Layout Approval (in case of layout)CIDCO Final Layout Plan.pdf · uploaded 30 Apr 2024View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan1 Final.pdf · uploaded 30 Apr 2024View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan 2 Final.pdf · uploaded 30 Apr 2024View
  • Commencement Certificates / NA Order for plotted developmentComencement Certificate.pdf · uploaded 30 Apr 2024View
  • Copy of Layout Approval (in case of layout)CIDCO Final Layout Order.pdf · uploaded 30 Apr 2024View
  • a Details of encumbrances concerned to FinanceNew Finance.pdf · uploaded 1 May 2024View
  • b Details of encumbrances concerned to LegalNew Finance.pdf · uploaded 1 May 2024View
  • a Details of encumbrances concerned to FinanceLegal.pdf · uploaded 1 May 2024View
  • b Details of encumbrances concerned to LegalLegal.pdf · uploaded 1 May 2024View
  • Declaration about Commencement CertificateFORMAT -D Commencement Declartion.pdf · uploaded 1 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Vastu NX.pdf · uploaded 1 May 2024View
  • Disclosure of Interest in Other Real Estate Organizationsother firm.pdf · uploaded 1 May 2024View
  • Other – TechnicalTechnical .pdf · uploaded 1 May 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 1 May 2024View
  • Deviation Report with respect to Allotment letterNo Deviation Allotment letter format .pdf · uploaded 1 May 2024View
  • Disclosure of sold/ booked inventoryDISCLOSED OF SOLD .pdf · uploaded 1 May 2024View
  • Deviation Report with respect to model copy of AgreementNo Deviation Agreement sale format .pdf · uploaded 1 May 2024View
  • CERSAI detailsCersai New.pdf · uploaded 1 May 2024View
  • Declaration in FORM BFrom B Developers .pdf · uploaded 3 May 2024View
  • Other – TechnicalNaredco Tirupati Vastu NX.pdf · uploaded 3 May 2024View
  • Proforma of Agreement for saleAFS Original Format.pdf · uploaded 23 May 2024View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 23 May 2024View
  • Other – TechnicalEmail Screen Shot.pdf · uploaded 23 May 2024View
  • Other – FinanceFinance 0907.pdf · uploaded 30 May 2024View
  • Other – TechnicalAnnexture A New Technical.pdf · uploaded 5 Jun 2024View
  • a Details of encumbrances concerned to FinanceFinance 0907.pdf · uploaded 9 Jul 2024View
  • b Details of encumbrances concerned to LegalFinance 0907.pdf · uploaded 9 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)From 1 Vastu Nx 30122024.pdf · uploaded 19 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2 Vastu Nx 30122024.pdf · uploaded 19 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)QTR 4 FORM 1 Vastu NX.pdf · uploaded 20 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)QTR 4 FORM 2 Vastu NX.pdf · uploaded 20 Apr 2025View
  • Disclosure of sold/ booked inventorySold - Usold Inventory.pdf · uploaded 20 Apr 2025View
  • Form 11 FORM1 QTR1 Tirupati Vastu NX.pdf · uploaded 20 Jul 2025View
  • Form 22 FORM2 QTR1 Tirupati Vastu NX.pdf · uploaded 20 Jul 2025View
  • Disclosure of Sold and Booked Inventory4 Sold Usold Inventory.pdf · uploaded 20 Jul 2025View
  • Form 2A (FY 2024-2025)Form2A - Tirupati Vastu NX - 2024-25.pdf · uploaded 3 Oct 2025View
  • Form 5 (FY 2024-2025)FOrm 5 - Vastu NX 2024-25.pdf · uploaded 3 Oct 2025View
  • Form 11 QTR2 FORM1 Vastu NX.pdf · uploaded 5 Nov 2025View
  • Form 22 QTR2 FORM2 Vastu NX.pdf · uploaded 5 Nov 2025View
  • Disclosure of Sold and Booked Inventory4 Sold Unsold Inventory Vastu NX.pdf · uploaded 5 Nov 2025View
  • Form 1QTR3 - Form1 - Vastu NX.pdf · uploaded 29 Jan 2026View
  • Form 2QTR3 - Form2 - Tirupati Vastu NX.pdf · uploaded 29 Jan 2026View
  • Disclosure of Sold and Booked InventorySold - Usold Inventory Vastu NX.pdf · uploaded 29 Jan 2026View
  • Form 1FORM1 QTR4 2025-26 - Vastu NX.pdf · uploaded 28 Apr 2026View
  • Form 2FORM2 QTR4 2025-26 - Vastu NX.pdf · uploaded 28 Apr 2026View
  • Disclosure of Sold and Booked InventorySold Unsold Units QTR4 2025-26 -Vastu NX.pdf · uploaded 28 Apr 2026View
  • Form 5 (FY 2025-2026)FORM 5 2025-26 Vastu NX.pdf · uploaded 29 Apr 2026View
  • Form 2A (FY 2025-2026)FORM 2A 2025-26 - Vastu NX.pdf · uploaded 29 Apr 2026View
  • Form 1QTR 1 FORM 1 Vastu NX.pdf · uploaded 20 Jul 2026View
  • Form 2QTR1 FORM 2 Vastu NX.pdf · uploaded 20 Jul 2026View
  • Disclosure of Sold and Booked InventoryQTR1 Sold Unsold Vastu NX.pdf · uploaded 20 Jul 2026View

Promoter documents

  • Legal Title reportLegal title Report Tirupati Vastu NX.pdf · uploaded 30 Apr 2024View
  • Declaration Form BFrom B Developers .pdf · uploaded 3 May 2024View

Technical documents

  • Layout ApprovalCIDCO Final Layout Plan.pdfView
  • Building Plan ApprovalBuilding Plan1 Final.pdfView
  • Building Plan ApprovalBuilding Plan 2 Final.pdfView
  • Layout ApprovalCIDCO Final Layout Order.pdfView

Financial documents

  • Other – FinanceFinance 0907.pdf · uploaded 30 May 2024View

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Tisgaon, Aurangabad taluka

Survey, CTS, gat or plot numbers

Plot No 27 Gut No 152 (Part)

As published on MahaRERA's project page

Plot No 27 Gut No 152 (Part)

Boundaries

North
Layout Open Space
South
15 M Wide Road
East
15 M Wide Road
West
7 M Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNanasaheb D Zarekar—
ArchitectNanasaheb D Zarekar—
Chartered accountantRamdas S Sarode—
EngineerPradeep V Mote—
EngineerSushant Shrinivas Fatke—
EngineerVaibhav Gulabrao Chavan—
OtherVijay Sukhdev Chabukswar—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology