Swami Height

Active

Tisgaon, Aurangabad 431136 |Promoter: M/S Jai Bhadra Builders And Developers

Residential / Group HousingRERAP51500052001
13 Jul 2023Registered with MahaRERA
5 Jun 2027Promised completion
4Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
4
Land area for this project
2,300 sq m (24,757 sq ft)
Permissible built-up area
4,145 sq m (44,616 sq ft)
Sanctioned built-up area
4,145 sq m (44,616 sq ft)
Recreational open space
230 sq m (2,476 sq ft)
Address
161, Gut No 161, Waluj Cidco Mahanagar TisgaonPIN 431136
Designated bank account
The Cosmos Co Operative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Swami Height is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 5 Jun 2027

Registered
13 Jul 2023
Promised
5 Jun 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150005200113 Jul 20235 Jun 2027—M/S Jai Bhadra Builders And DevelopersProject page

4 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A3—
Wing B3—
Wing C3—
Wing D7—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Wing AClosed/Covered00001
Wing AOpen Space00000
Wing BClosed/Covered00001
Wing BOpen Space00000
Wing CClosed/Covered00001
Wing COpen Space00000
Wing DClosed/Covered00001
Wing DOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Wing A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor35%
  • Slabs of Super Structure35%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises22%
  • Sanitary Fittings within the flats / premises22%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing D

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor35%
  • Slabs of Super Structure35%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises22%
  • Sanitary Fittings within the flats / premises22%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNOT YET STARTED0%
  • Water SupplyNOT YET STARTED0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)NOT YET STARTED0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNOT YET STARTED0%
  • Street LightingNOT YET STARTED0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNOT YET STARTED0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNOT YET STARTED0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNOT YET STARTED0%
  • Excavation100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

26 documents held by Deedo, 32 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title report2 TITLE CUM SEARCH REPORT.pdf · uploaded 28 Apr 2023View
  • Copy of Layout Approval (in case of layout)Layout Approval.pdf · uploaded 28 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)from-01 swami heights.pdf · uploaded 28 Apr 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)from-02 swami heights.pdf · uploaded 28 Apr 2023View
  • Building Plan Approval / NA Order for plotted developmentApproved Building Plan for Row Houses_compressed-compressed.pdf · uploaded 29 Apr 2023View
  • Building Plan Approval / NA Order for plotted developmentAprroved Building Plan for Flats-compressed.pdf · uploaded 29 Apr 2023View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate-compressed_compressed.pdf · uploaded 29 Apr 2023View
  • Proforma of Agreement for salePROFORMA AGREEMENT TO SELL.pdf · uploaded 5 May 2023View
  • Proforma of Allotment letter25 ALLOTTMENT LETTER.pdf · uploaded 5 May 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same35 SEPERATE AC DECLARATION.pdf · uploaded 6 May 2023View
  • CERSAI details17 CERSAI REPORT.pdf · uploaded 8 May 2023View
  • Declaration about Commencement Certificate9 DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf · uploaded 9 May 2023View
  • Disclosure of Interest in Other Real Estate Organizations19 DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORGANISATION .pdf · uploaded 9 May 2023View
  • Deviation Report with respect to Allotment letter36 DETAILS OF DEVIATION IN ALLOTMENT LETTER.pdf · uploaded 9 May 2023View
  • Deviation Report with respect to model copy of Agreement37 DETAILS OF DEVIATION IN AGREEMENT TO SELL.pdf · uploaded 9 May 2023View
  • a Details of encumbrances concerned to Finance3 4 DETAILS OF ENCUMBRANCES SRELATED TO FINANCIAL AND LEGAL.pdf · uploaded 11 May 2023View
  • b Details of encumbrances concerned to Legal3 4 DETAILS OF ENCUMBRANCES SRELATED TO FINANCIAL AND LEGAL.pdf · uploaded 11 May 2023View
  • Declaration in FORM B10 FORM-B_ (5).pdf · uploaded 9 Jun 2023View
  • a Details of encumbrances concerned to Financeconcerned to Finance-2.pdf · uploaded 27 Jun 2023View
  • b Details of encumbrances concerned to Legalconcerned to Finance-2.pdf · uploaded 27 Jun 2023View
  • a Details of encumbrances concerned to Financeconcerned to Finance-1.pdf · uploaded 1 Jul 2023View
  • b Details of encumbrances concerned to Legalconcerned to Finance-1.pdf · uploaded 1 Jul 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samejaibhadra.pdf · uploaded 3 Jan 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samejaibhadra.pdf · uploaded 4 Jan 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 20 Jan 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 20 Jan 2024View

Promoter documents

  • Legal Title report2 TITLE CUM SEARCH REPORT.pdf · uploaded 28 Apr 2023View
  • Declaration Form B10 FORM-B_ (5).pdf · uploaded 9 Jun 2023View

Technical documents

  • Layout ApprovalLayout Approval.pdfView
  • Building Plan ApprovalApproved Building Plan for Row Houses_compressed-compressed.pdfView
  • Building Plan ApprovalAprroved Building Plan for Flats-compressed.pdfView

Proforma allotment letter

  • Proforma allotment letter25 ALLOTTMENT LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Tisgaon, Aurangabad taluka

Survey, CTS, gat or plot numbers

161

As published on MahaRERA's project page

161

Boundaries

North
Gut No 161 Part
South
15 M W Road
East
Gut No 161 Part
West
Gut No 165 Part

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectR B & Associates—
Chartered accountantCa Rashmi Kakani—
EngineerD A Deshpande—

Source: MahaRERA project page. Contact details are not shown.