Raaj Swapnapurti

Completed

Tisgaon, Aurangabad 431001 |Promoter: S Raaj Associates

Residential / Group HousingRERAP51500000594
18 Jul 2017Registered with MahaRERA
31 Dec 2018Promised completion
7Buildings
121Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
7
Unit types
RowHouse, Row House, Rowhouse, 2 BHK Flat, 1 BHK Flat121 units in all
Land area for this project
8,100 sq m (87,188 sq ft)
Permissible built-up area
6,338 sq m (68,222 sq ft)
Sanctioned built-up area
5,537 sq m (59,600 sq ft)
Recreational open space
799 sq m (8,595 sq ft)
Address
Gut No.94, Tisgaon, Cidco Waluj Mahangar, AurangabadPIN 431001
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.85991, 75.26835
Raaj Swapnapurti is at latitude 19.85991, longitude 75.26835.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2018

The latest completion date on record passed 7 years and 10 months ago.

Registered
18 Jul 2017
Promised
31 Dec 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150000059418 Jul 201731 Dec 2018—S Raaj AssociatesProject page

7 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A-128
A-229
A-326
B616
C-129
C-229
D664

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

121 units registered

RowHouse · 8 unitsRow House · 18 unitsRowhouse · 15 units2 BHK Flat · 16 units1 BHK Flat · 64 units
BuildingTypeCarpet areaUnits
A-1RowHouse35.9 sq m · 386 sq ft8
A-2Row House46.44 sq m · 500 sq ft9
A-3Rowhouse56.3 sq m · 606 sq ft6
B2 BHK Flat43.63 sq m · 470 sq ft16
C-1Rowhouse48.6 sq m · 523 sq ft9
C-2Row House47.3 sq m · 509 sq ft9
D1 BHK Flat30.3 sq m · 326 sq ft56
D1 BHK Flat30.55 sq m · 329 sq ft8

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A-1Closed/Covered00000
A-1Open Space00000
A-2Closed/Covered00000
A-2Open Space00000
A-3Closed/Covered00000
A-3Open Space00000
BClosed/Covered000012
BOpen Space00000
C-1Closed/Covered00000
C-1Open Space00000
C-2Closed/Covered00000
C-2Open Space00000
DClosed/Covered000028
DOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A-1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A-2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A-3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

C-1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

C-2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

D

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsConcrete Approaches100%
  • Water SupplyBoar Water & CIDCO Water Line (As per CIDCO line)100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic Tank and Drainage Line Supply Only100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTree Plantation Surrounding of Site100%
  • Street LightingStreet Light With common electrical supply100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting For Building B & D100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationTransformer Installed100%
  • Aggregate area of recreational Open SpaceGarden & Children Park100%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

19 documents held by Deedo, 21 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Declaration in FORM BAffidavit cum Declaration Raaj Developers.PDF · uploaded 7 Jul 2017View
  • Copy of the legal title reportTitle cum Search Report.PDF · uploaded 8 Jul 2017View
  • Details of encumbrancesproject loan letter.PDF · uploaded 8 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.PDF · uploaded 8 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate.PDF · uploaded 8 Jul 2017View
  • Copy of Layout Approval (in case of layout)Final Sanction_1.pdf · uploaded 10 Jul 2017View
  • Building Plan Approval (IOD)Commencement Certificate.pdf · uploaded 10 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 10 Jul 2017View
  • Proforma of Allotment letterFInal ATS.pdf · uploaded 10 Jul 2017View
  • Status of ConveyanceARB2-4189-2016 DOD-1-5-compressed.pdf · uploaded 26 Apr 2018View
  • Status of Formation of Legal Entity (Society/Co Op etc.)ARB2-4189-2016 DOD-1-5-compressed.pdf · uploaded 26 Apr 2018View
  • Certificates of CA (Form 5)Raaj Developer form 5.pdf · uploaded 25 Jan 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentraaj Swapnapurti CC.pdf · uploaded 30 Jul 2021View
  • Architect’s Certificate on Completion of Project (Form 4)RAAJ Form 4-compressed.pdf · uploaded 2 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5.pdf · uploaded 16 Nov 2021View
  • Status of Conveyanceconveyance compressed.pdf · uploaded 18 Jul 2023View

Promoter documents

  • Declaration Form BAffidavit cum Declaration Raaj Developers.PDF · uploaded 7 Jul 2017View
  • Legal Title reportTitle cum Search Report.PDF · uploaded 8 Jul 2017View

Technical documents

  • Layout ApprovalFinal Sanction_1.pdfView
  • Building Plan ApprovalCommencement Certificate.pdfView

Proforma allotment letter

  • Proforma allotment letterFInal ATS.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Tisgaon, Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO.94

As published on MahaRERA's project page

GUT NO.94, TISGAON, CIDCO WALUJ MAHANGAR, AURANGABAD

Boundaries

North
Land Gut No 91 92 93
South
Remaining Land Of Gut No 94
East
Remaining Land Of Gut No 94 And 18 Mtr Wide Road
West
Land Gut No 90

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDhananjay Doyefode—
EngineerNamdev Karkhane—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology