Skip to content

Samarth Residency

Completed

Shendra Kamangar, Aurangabad 431001 |Promoter: Akshay Builders And Developers

Residential / Group HousingRERAP51500005674
11 Aug 2017Registered with MahaRERA
31 Jul 2018Promised completion
1Building
16Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
1BHK, 2BHK, 3BHK16 units in all
Land area for this project
773 sq m (8,320 sq ft)
Permissible built-up area
773 sq m (8,320 sq ft)
Sanctioned built-up area
769 sq m (8,279 sq ft)
Address
Gut No 143/1 143/2PIN 431001
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.86301, 75.47817
Samarth Residency is at latitude 19.86301, longitude 75.47817.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Jul 2018

The latest completion date on record passed 8 years and 3 months ago.

Registered
11 Aug 2017
Promised
31 Jul 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150000567411 Aug 201731 Jul 2018—Akshay Builders And DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Samarth Residency616

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

16 units registered

1BHK · 2 units2BHK · 12 units3BHK · 2 units
TypeCarpet areaUnits
1BHK21.21 sq m · 228 sq ft2
2BHK42.17 sq m · 454 sq ft12
3BHK53.28 sq m · 574 sq ft2

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Samarth Residency

  • Excavation100%
  • Basement (if any)20%
  • Podiums (if any)0%
  • Plinth20%
  • Stilt Floor0%
  • Slabs of Super Structure70%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEWERAGE LINE NETWORK (NO SEPTIC TANK NO STP)0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAS PER DRAWING0%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER DRAWING0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

15 documents held by Deedo, 17 filings listed on MahaRERA's project page

Form 1

Title report

Encumbrance details

Form B

Form 2

Registration certificate

Form 2A

Form 5

Show all 32 documentsShow fewer documents

Form 4

Other (3)

Layout plan

Building plan

Allotment letter

Document library

  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)BUILDING PLAN.pdf · uploaded 30 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE.pdf · uploaded 30 Jul 2017View
  • Copy of the legal title reportSEARCH REPORT.pdf · uploaded 31 Jul 2017View
  • Details of encumbrancesEncumberance certificate.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterAgreement to sale.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BPromoter Form B.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFFICATE.pdf · uploaded 31 Jul 2017View
  • Engineers Certificate on Quality Assurance (Form 2A)form2.pdf · uploaded 10 Oct 2019View
  • Annual Audit Report of Statutory CA (Form 5)CERTIFICATE FORM5.PDF · uploaded 10 Oct 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Rera architect Samarth.pdf · uploaded 2 Dec 2020View
  • Architect’s Certificate on Completion of Project (Form 4)Rera architect Samarth.pdf · uploaded 2 Dec 2020View

Promoter documents

  • Legal Title reportSEARCH REPORT.pdf · uploaded 31 Jul 2017View
  • Declaration Form BPromoter Form B.pdf · uploaded 31 Jul 2017View

Technical documents

  • Layout ApprovalLAYOUT.pdfView
  • Building Plan ApprovalBUILDING PLAN.pdfView

Proforma allotment letter

  • Proforma allotment letterAgreement to sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Shendra Kamangar, Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO 143/1 143/2

As published on MahaRERA's project page

GUT NO 143/1 143/2

Boundaries

North
Part Of Land From Land From Gut No 143 1
South
Plot No 4 5 6 7 And 8
East
9 Mtr Wide Road
West
Land From Gut No 143 2

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSantosh Adhav—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology