42 Copper Stone

Completed

Shendra Kamangar, Aurangabad 431007 |Promoter: Divyesh Haribhai Delvadia

Residential / Group HousingRERAP51500003102
4 Aug 2017Registered with MahaRERA
15 May 2021Promised completion
6Buildings
42Units registered
2MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
6
Unit types
Row house42 units in all
Land area for this project
3,418 sq m (36,791 sq ft)
Permissible built-up area
4,340 sq m (46,715 sq ft)
Sanctioned built-up area
3,027 sq m (32,582 sq ft)
Address
Gut No 177 Pot No 17PIN 431007
Designated bank account
Bank Of Baroda
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.53360, 73.83043
42 Copper Stone is at latitude 18.53360, longitude 73.83043.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 15 May 2021

The latest completion date on record passed 5 years and 5 months ago.

Registered
4 Aug 2017
Promised
15 May 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000031024 Aug 201715 May 2021—Divyesh Haribhai DelvadiaProject page

6 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Row A38
Row B38
Row C38
Row D38
Row E35
Row F35

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

42 units registered

Row house · 42 units
BuildingTypeCarpet areaUnits
Row ARow house65.32 sq m · 703 sq ft8
Row BRow house65.32 sq m · 703 sq ft8
Row CRow house65.32 sq m · 703 sq ft8
Row DRow house65.32 sq m · 703 sq ft8
Row ERow house65.32 sq m · 703 sq ft5
Row FRow house65.32 sq m · 703 sq ft5

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Row AClosed/Covered00001
Row AOpen Space00000
Row BClosed/Covered00001
Row BOpen Space00000
Row CClosed/Covered00001
Row COpen Space00000
Row DClosed/Covered00001
Row DOpen Space00000
Row EClosed/Covered00001
Row EOpen Space00000
Row FClosed/Covered00001
Row FOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Row A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row C

  • Excavation100%
  • Basement (if any)75%
  • Podiums (if any)0%
  • Plinth75%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row D

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row E

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row F

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsINTERNAL PROJECT ROADS0%
  • Water SupplyFROM WELL25%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTATION FOR PROJECT0%
  • Street LightingINTERNAL PROJECT STREE LIGHTS0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING AS PER NORMS BY AUTHORITY0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

12 documents held by Deedo, 14 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of Layout Approval (in case of layout)Building Plan-compressed.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)CC.pdf · uploaded 29 Jul 2017View
  • Details of encumbrancesno Enc letter.pdf · uploaded 29 Jul 2017View
  • Proforma of Allotment letterATS Letter.pdf · uploaded 29 Jul 2017View
  • Copy of the legal title reportLegal Search.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Certificate.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Certificate.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BForm B.pdf · uploaded 31 Jul 2017View
  • Occupational Certificate42 Copper Stone occupancy.pdf · uploaded 28 Jul 2026View

Promoter documents

  • Legal Title reportLegal Search.pdf · uploaded 31 Jul 2017View
  • Declaration Form BForm B.pdf · uploaded 31 Jul 2017View

Technical documents

  • Layout ApprovalBuilding Plan-compressed.pdfView
  • Building Plan ApprovalCC.pdfView

Proforma allotment letter

  • Proforma allotment letterATS Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Shendra Kamangar, Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO 177 POT NO 17

As published on MahaRERA's project page

GUT NO 177 POT NO 17

Boundaries

North
Land Gut No 177
South
Land Gut No 172
East
Land Gut No 176
West
9 M Wide Road And Open Space And Gut No 177

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSantosh Sakhare—
Real Estate AgentUday Jailal Kasliwal—
Registered real estate agentUdayJailal KasliwalA51500000100

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology