Shiv Park-2

Active

Palshi, Aurangabad 431008 |Promoter: Balaji Infra

Residential / Group HousingRERAP51500051760
27 Jun 2023Registered with MahaRERA
31 Dec 2028Promised completion
9Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
9
Land area for this project
6,000 sq m (64,583 sq ft)
Permissible built-up area
8,565 sq m (92,189 sq ft)
Sanctioned built-up area
3,065 sq m (32,987 sq ft)
Recreational open space
601 sq m (6,473 sq ft)
Address
Gut No 372/Part Palsi, Palshi, Palshi PisadeviPIN 431008
Designated bank account
The Cosmos Co Operative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Shiv Park-2 is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2028

Registered
27 Jun 2023
Promised
31 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150005176027 Jun 202331 Dec 2028—Balaji InfraProject page

9 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A11—
A21—
A31—
A41—
A51—
A61—
B12—
B22—
B32—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A1Closed/Covered00000
A1Open Space00006
A2Closed/Covered00000
A2Open Space00006
A3Closed/Covered00000
A3Open Space00006
A4Closed/Covered00000
A4Open Space00006
Show all 18 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A5Closed/Covered00000
A5Open Space00006
A6Closed/Covered00000
A6Open Space00006
B1Closed/Covered00000
B1Open Space000010
B2Closed/Covered00000
B2Open Space000010
B3Closed/Covered00000
B3Open Space000010

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor40%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Show all 10 buildings and common areasShow fewer buildings and common areas

A4

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A5

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A6

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsCEMENT ROADS20%
  • Water SupplyFROM BOREWELL60%
  • Sewerage (Chamber, Lines, Septic Tank , STP)DRAINAGE LINE AND SEPTIK TANK20%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTATION AS PER NORMS20%
  • Street LightingSTREE LIGHTS IN THE PROJECT20%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain water Harvesting as per Norms0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceOPEN SPACE0%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

39 documents held by Deedo, 47 filings listed on MahaRERA's project page

Other (38)

Show all 86 documentsShow fewer documents

Other (38)

Registration certificate

Document library

  • Copy of the legal title reportSearch Report.pdf · uploaded 3 Jun 2023View
  • Declaration about Commencement CertificateFormat D.pdf · uploaded 3 Jun 2023View
  • Declaration in FORM BForm B.pdf · uploaded 3 Jun 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Kapre Sir.pdf · uploaded 3 Jun 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Gadekar Sir.pdf · uploaded 3 Jun 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Jadhav Sir.pdf · uploaded 3 Jun 2023View
  • Proforma of Agreement for sale12 ATS Draft RERA.pdf · uploaded 3 Jun 2023View
  • Proforma of Allotment letterModal Form Of Allotment Letter.pdf · uploaded 3 Jun 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 3 Jun 2023View
  • Deviation Report with respect to Allotment letterDEVI Allotment Letter.pdf · uploaded 3 Jun 2023View
  • Deviation Report with respect to model copy of AgreementDEVI Agreement to Sale.pdf · uploaded 3 Jun 2023View
  • a Details of encumbrances concerned to FinanceNo ENC Legal.pdf · uploaded 3 Jun 2023View
  • b Details of encumbrances concerned to LegalNo ENC Legal.pdf · uploaded 3 Jun 2023View
  • Commencement Certificates / NA Order for plotted developmentCert_B_241515_402Nz9ZASign.pdf · uploaded 3 Jun 2023View
  • Copy of Layout Approval (in case of layout)SHIV PARK-2 PLANS-1.pdf · uploaded 3 Jun 2023View
  • Building Plan Approval / NA Order for plotted developmentSHIV PARK-2 PLANS-2.pdf · uploaded 3 Jun 2023View
  • Building Plan Approval / NA Order for plotted developmentSHIV PARK-2 PLANS-3.pdf · uploaded 3 Jun 2023View
  • Building Plan Approval / NA Order for plotted developmentSHIV PARK-2 PLANS-5.pdf · uploaded 3 Jun 2023View
  • Building Plan Approval / NA Order for plotted developmentSHIV PARK-2 PLANS-6.pdf · uploaded 3 Jun 2023View
  • Building Plan Approval / NA Order for plotted developmentSHIV PARK-2 PLANS-4.pdf · uploaded 3 Jun 2023View
  • a Details of encumbrances concerned to FinanceNo ENC FIN.pdf · uploaded 23 Jun 2023View
  • b Details of encumbrances concerned to LegalNo ENC FIN.pdf · uploaded 23 Jun 2023View
  • CERSAI detailsCERSAI Declaration.pdf · uploaded 23 Jun 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Balaji Infra Form 1 16 10 2023.pdf · uploaded 24 Jan 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Balaji Infra Form 1 06 01 2024.pdf · uploaded 24 Jan 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Balaji Infra Form 2 16 10 2023.pdf · uploaded 24 Jan 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Balaji Infra Form 2 06 01 2024.pdf · uploaded 24 Jan 2024View
  • Disclosure of sold/ booked inventoryBalaji Infra Sold Unsold Detail 30 09 2023.pdf · uploaded 24 Jan 2024View
  • Disclosure of sold/ booked inventoryBalaji Infra Sold Unsold Detail 31 12 2023.pdf · uploaded 24 Jan 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 13-07-24.pdf · uploaded 16 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 12-10-24.pdf · uploaded 16 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 02-01-25.pdf · uploaded 16 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 13-07-24.pdf · uploaded 16 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 12-10-24.pdf · uploaded 16 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 02-01-25.pdf · uploaded 16 Jan 2025View
  • Disclosure of sold/ booked inventorySold 30-06-24.pdf · uploaded 16 Jan 2025View
  • Disclosure of sold/ booked inventorySold 30-09-24.pdf · uploaded 16 Jan 2025View
  • Disclosure of sold/ booked inventorySold 31-12-24.pdf · uploaded 16 Jan 2025View

Promoter documents

  • Legal Title reportSearch Report.pdf · uploaded 3 Jun 2023View
  • Declaration Form BForm B.pdf · uploaded 3 Jun 2023View

Technical documents

  • Layout ApprovalSHIV PARK-2 PLANS-1.pdfView
  • Building Plan ApprovalSHIV PARK-2 PLANS-2.pdfView
  • Building Plan ApprovalSHIV PARK-2 PLANS-3.pdfView
  • Building Plan ApprovalSHIV PARK-2 PLANS-5.pdfView
  • Building Plan ApprovalSHIV PARK-2 PLANS-6.pdfView
  • Building Plan ApprovalSHIV PARK-2 PLANS-4.pdfView

Proforma allotment letter

  • Proforma allotment letterModal Form Of Allotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Palshi, Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO 372/PART PALSI

As published on MahaRERA's project page

GUT NO 372/PART PALSI

Boundaries

North
Gut No 373
South
Gut No 371
East
Gut No 372 And Approach Road
West
Gut No 363

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectParmeshwar Govind Gawali—
Chartered accountantBangad Parjane and Co—
EngineerAbhay Patil—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology