Omkara City -02

Active

Palshi, Aurangabad 431008 |Promoter: Shankara Builders

21 May 2025Registered with MahaRERA
17 Oct 2029Promised completion
9Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Active
Buildings
9
Land area for this project
8,100 sq m (87,188 sq ft)
Permissible built-up area
9,692 sq m (1,04,324 sq ft)
Sanctioned built-up area
4,777 sq m (51,423 sq ft)
Recreational open space
800 sq m (8,611 sq ft)
Planning authority
city and industrial development corporation of maharashtra ltd
Address
Gut No 12(P), Gut No 12(P), PalshiPIN 431008
Designated bank account
The Cosmos Co Operative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.92112, 75.39459
Omkara City -02 is at latitude 19.92112, longitude 75.39459.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 17 Oct 2029

Registered
21 May 2025
Promised
17 Oct 2029

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150008031321 May 202517 Oct 2029—Shankara BuildersProject page

9 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Ab5—
C1—
D1—
E1—
F1—
G1—
H1—
I1—
J1—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
AbClosed/Covered000018
AbOpen Space00000
CClosed/Covered00000
COpen Space00000
DClosed/Covered00000
DOpen Space00000
EClosed/Covered000012
EOpen Space00000
Show all 18 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
FClosed/Covered000012
FOpen Space00000
GClosed/Covered00008
GOpen Space00000
HClosed/Covered00008
HOpen Space00000
IClosed/Covered000026
IOpen Space00000
JClosed/Covered00000
JOpen Space00009

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Ab

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

C

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

D

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Show all 10 buildings and common areasShow fewer buildings and common areas

E

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

F

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

G

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

H

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

I

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

J

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsCONCRETE0%
  • Water SupplyBOREWELL0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER STANDARD0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingGARDEN0%
  • Street LightingALONG ROAD0%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingUPTO BORE WELL0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PER SANCTION0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

43 documents held by Deedo, 64 filings listed on MahaRERA's project page

Title report

Encumbrance details (2)

Commencement certificate (2)

Allotment letter (2)

Other (17)

Show all 107 documentsShow fewer documents

Other (17)

Form 1 (4)

Form 2 (4)

Form B

Registration certificate

Layout plan (2)

Building plan (7)

Document library

  • Copy of the legal title reportA1 Title Report Shankara.pdf · uploaded 18 Oct 2024View
  • a Details of encumbrances concerned to FinanceNo Legal Encumburance 26112024.pdf · uploaded 22 Jan 2025View
  • b Details of encumbrances concerned to LegalNo Legal Encumburance 26112024.pdf · uploaded 22 Jan 2025View
  • Commencement Certificates / NA Order for plotted developmentFinal Layout Saction Plan .pdf · uploaded 22 Jan 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Ganesh Kolte.pdf · uploaded 22 Jan 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Gopal Jaju.pdf · uploaded 22 Jan 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Kashinath Bakle.pdf · uploaded 22 Jan 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Raj Dhakne.pdf · uploaded 22 Jan 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Rathod Jagannath.pdf · uploaded 22 Jan 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Rohan Jaju.pdf · uploaded 22 Jan 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Vinay Somani.pdf · uploaded 22 Jan 2025View
  • Deviation Report with respect to Allotment letterNo Any Deviation In Allotment.pdf · uploaded 22 Jan 2025View
  • Deviation Report with respect to model copy of AgreementNo Any Deviation In Allotment.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentA B Building.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentC D Building.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentE F Building.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentG H Building.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentI Building.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentJ Building.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentPlan.pdf · uploaded 22 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form1.pdf · uploaded 11 Mar 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2.pdf · uploaded 11 Mar 2025View
  • Copy of Layout Approval (in case of layout)Tentative Permission.pdf · uploaded 11 Mar 2025View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Form B Bank.pdf · uploaded 11 Mar 2025View
  • Proforma of Allotment letterA345 Allotment Letter R.pdf · uploaded 8 Apr 2025View
  • Other – LegalA6 Satbarr.pdf · uploaded 8 Apr 2025View
  • Other – LegalA6 Sale Deed R.pdf · uploaded 8 Apr 2025View
  • Declaration about all RERA Designated Bank Accounts (Format A)B1 Format A.pdf · uploaded 8 Apr 2025View
  • Disclosure for secured/unsecured finance availed for the projectB2 Secured Unsecured.pdf · uploaded 8 Apr 2025View
  • CERSAI detailsCersai.pdf · uploaded 8 Apr 2025View
  • Other – TechnicalSanction Plan Full 0107 r.pdf · uploaded 8 Apr 2025View
  • Declaration about Commencement CertificateC3 Form D Commencement certificate.pdf · uploaded 8 Apr 2025View
  • Declaration in FORM Bshankara Form B.pdf · uploaded 8 Apr 2025View
  • Other – TechnicalC7 Annexure A.pdf · uploaded 8 Apr 2025View
  • Copy of Layout Approval (in case of layout)Sanction Plan Full 0107 r.pdf · uploaded 8 Apr 2025View
  • Proforma of Agreement for saleA345 Agreement.pdf · uploaded 8 Apr 2025View
  • a Details of encumbrances concerned to FinanceB3 Financial Emcumbrances.pdf · uploaded 22 Apr 2025View
  • b Details of encumbrances concerned to LegalB3 Financial Emcumbrances.pdf · uploaded 22 Apr 2025View
  • Other – LegalMail from Competent Authority.pdf · uploaded 16 May 2025View
  • Withdrawal Update Form 1Form 1 for 30-6-25.pdf · uploaded 30 Jan 2026View
  • Withdrawal Update Form 2Form 2 for 30-6-25.pdf · uploaded 30 Jan 2026View
  • Withdrawal Update Form 1Shankara Form -1.pdf · uploaded 30 Jan 2026View
  • Withdrawal Update Form 2Shankara Form-2.pdf · uploaded 30 Jan 2026View
  • Withdrawal Update Form 1Form 1 for 31-12-25.pdf · uploaded 5 Feb 2026View
  • Withdrawal Update Form 2Form 2 for 31-12-25.pdf · uploaded 5 Feb 2026View
  • Withdrawal Update Form 1Form 1 for 31-12-25.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 2Form 2 for 31-12-25.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 1Form 1 for 31-12-25.pdf · uploaded 6 Oct 2026View
  • Withdrawal Update Form 2Form 2 for 31-12-25.pdf · uploaded 6 Oct 2026View

Promoter documents

  • Legal Title reportA1 Title Report Shankara.pdf · uploaded 18 Oct 2024View
  • Declaration Form Bshankara Form B.pdf · uploaded 8 Apr 2025View

Technical documents

  • Layout ApprovalTentative Permission.pdfView
  • Layout ApprovalSanction Plan Full 0107 r.pdfView
  • Building Plan ApprovalA B Building.pdfView
  • Building Plan ApprovalC D Building.pdfView
  • Building Plan ApprovalE F Building.pdfView
  • Building Plan ApprovalG H Building.pdfView
  • Building Plan ApprovalI Building.pdfView
  • Building Plan ApprovalJ Building.pdfView
  • Building Plan ApprovalPlan.pdfView

Other legal documents

  • Other – LegalA6 Sale Deed R.pdfView
  • Other – LegalA6 Satbarr.pdfView
  • Other – LegalMail from Competent Authority.pdfView

Proforma allotment letter

  • Proforma allotment letterA345 Allotment Letter R.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Palshi, Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO 12(P)

As published on MahaRERA's project page

GUT NO 12(P)

Boundaries

North
Land Of Rambhau Jaufk
South
Palshi Road
East
Land Of Kartik Builders In Same Gut Number
West
Land Of Rehman Khan Yusuf Khan

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDhananjay B Doifode—
Chartered accountantPraveen Bangad—
EngineerPrahsnat P Doifode—

Source: MahaRERA project page. Contact details are not shown.